Last update at: 2024-10-03T15:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | |||||||||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000009501_002 | Dismissed | 2024-10-03T14:43:04+01:00 | 2024-10-03T15:00:00+01:00 | 2024-10-03T15:03:00+01:00 | This is a test submission to check connection to Elexon Insights |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000009501_001 | Dismissed | 2024-10-03T14:42:19+01:00 | 2024-10-03T15:00:00+01:00 | 2024-10-03T15:03:00+01:00 | This is a test submission to check connection to Elexon Insights |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_004 | Dismissed | 2024-10-01T16:28:19+01:00 | 2024-10-07T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 1 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_003 | Dismissed | 2024-09-25T09:07:21+01:00 | 2024-10-07T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 1 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_002 | Dismissed | 2024-09-23T16:12:25+01:00 | 2024-09-30T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 2 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_001 | Dismissed | 2024-09-23T15:52:48+01:00 | 2024-09-30T09:00:00+01:00 | 2024-10-06T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 2 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_007 | Dismissed | 2024-09-27T09:23:17+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_006 | Dismissed | 2024-09-27T09:04:57+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_005 | Dismissed | 2024-09-27T09:04:33+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_004 | Dismissed | 2024-09-27T08:55:31+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_003 | Dismissed | 2024-06-21T14:22:29+01:00 | 2023-11-10T12:44:00+00:00 | 2025-03-31T00:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Dismissed | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_001 | Active | 2024-09-27T09:23:00+01:00 | 2024-09-27T09:18:00+01:00 | 2025-07-31T10:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000009175_003 | Active | 2024-09-27T08:57:17+01:00 | 2024-06-21T14:00:00+01:00 | 2025-06-30T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_002 | Dismissed | 2024-06-21T14:23:06+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_001 | Dismissed | 2024-06-21T14:21:28+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_003 | Inactive | 2024-09-13T01:02:32+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_002 | Dismissed | 2024-09-09T09:01:48+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_001 | Dismissed | 2024-08-23T14:04:31+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 10th,11th and 12th of September 2024. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000009351_002 | Dismissed | 2024-08-22T14:55:24+01:00 | 2024-09-22T14:52:00+01:00 | 2024-09-22T14:53:00+01:00 | This is a further test publication following the automation of SSE REMIT app. Please ignore. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000009351_001 | Dismissed | 2024-08-22T14:51:45+01:00 | 2024-09-22T14:52:00+01:00 | 2024-09-22T14:53:00+01:00 | This is a further test publication following the automation of SSE REMIT app. Please ignore. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009350_002 | Dismissed | 2024-08-22T14:45:18+01:00 | 2024-09-22T00:00:00+01:00 | 2024-09-22T00:00:01+01:00 | This is a test publication following the automation of SSE REMIT admin app. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009350_001 | Dismissed | 2024-08-22T14:41:23+01:00 | 2024-09-22T00:00:00+01:00 | 2024-09-22T00:00:01+01:00 | This is a test publication following the automation of SSE REMIT admin app. |
||
Other_0000000000000009256_008 | Inactive | 2024-08-01T04:02:32+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T03:00:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||||
Great Island |
Great Island |
Other_0000000000000009256_007 | Dismissed | 2024-07-31T21:10:48+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T03:00:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_006 | Dismissed | 2024-07-31T21:07:31+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T00:03:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_005 | Dismissed | 2024-07-30T15:59:06+01:00 | 2024-07-31T00:00:00+01:00 | 2024-07-31T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_004 | Dismissed | 2024-07-29T14:03:08+01:00 | 2024-08-01T00:00:00+01:00 | 2024-08-01T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_003 | Dismissed | 2024-07-28T16:25:13+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_002 | Dismissed | 2024-07-27T20:37:44+01:00 | 2024-07-29T00:00:00+01:00 | 2024-07-30T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_001 | Dismissed | 2024-07-18T16:02:07+01:00 | 2024-07-28T00:00:00+01:00 | 2024-07-29T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_002 | Dismissed | 2024-07-29T14:20:34+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_001 | Dismissed | 2024-07-26T12:31:36+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_002 | Dismissed | 2024-07-29T14:19:57+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_001 | Dismissed | 2024-07-26T12:31:39+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000009284_001 | Active | 2024-07-29T14:17:35+01:00 | 2024-08-02T00:00:00+01:00 | 2025-04-30T00:00:00+01:00 | Great Island is unavailable to run on oil due to plant fault. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_005 | Inactive | 2024-07-23T10:47:32+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_004 | Dismissed | 2024-07-23T09:37:42+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Dismissed | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_002 | Dismissed | 2023-08-04T17:37:40+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_001 | Dismissed | 2023-05-10T08:49:10+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_002 | Inactive | 2024-07-15T19:02:32+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_001 | Dismissed | 2024-07-12T10:10:34+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
Other_0000000000000009232_003 | Inactive | 2024-07-08T22:02:32+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-08T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009232_002 | Dismissed | 2024-07-05T16:16:03+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-08T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009232_001 | Dismissed | 2024-07-05T14:44:07+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_003 | Dismissed | 2024-07-08T21:43:03+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 370MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_002 | Dismissed | 2024-07-08T09:37:04+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 370MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_001 | Dismissed | 2024-07-05T16:18:45+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |