Last update at: 2024-10-03T15:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | |||||||||
Other_0000000000000009202_002 | Inactive | 2024-07-03T19:02:32+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009202_001 | Dismissed | 2024-07-02T09:06:48+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_010 | Inactive | 2024-07-01T13:02:32+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_009 | Dismissed | 2024-05-21T12:12:29+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_008 | Dismissed | 2024-05-16T17:24:21+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Dismissed | 2024-04-14T22:58:55+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_004 | Dismissed | 2024-02-13T16:06:55+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_003 | Dismissed | 2023-02-10T11:57:40+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking |
48X000000000314Y | Other_0000000000000000039_002 | Dismissed | 2022-09-20T12:28:17+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_003 | Dismissed | 2024-06-25T15:31:25+01:00 | 2024-04-27T23:00:00+01:00 | 2024-06-28T00:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_002 | Dismissed | 2024-05-17T08:50:18+01:00 | 2024-04-27T23:00:00+01:00 | 2024-06-28T00:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_001 | Dismissed | 2024-04-25T12:04:26+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-21T23:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Other_0000000000000009139_003 | Inactive | 2024-06-07T13:02:32+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-07T12:00:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009139_002 | Dismissed | 2024-06-06T17:30:33+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-07T12:00:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009139_001 | Dismissed | 2024-06-04T15:45:42+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-06T23:59:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||
Other_0000000000000009127_004 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins. |
||||
Medway |
T_MEDP-1 |
Other_0000000000000009127_003 | Dismissed | 2024-06-03T16:49:21+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins. |
||
Other_0000000000000009127_003 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||||
Medway |
T_MEDP-1 |
Other_0000000000000009127_002 | Dismissed | 2024-06-03T08:32:07+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||
Medway |
T_MEDP-1 |
Other_0000000000000009127_002 | Dismissed | 2024-06-03T08:32:16+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||
Medway |
T_MEDP-1 |
Other_0000000000000009127_001 | Dismissed | 2024-05-31T09:03:01+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity station on load run. Once out of merit run is complete our dynamic data NDZ value will become 360 mins. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_002 | Inactive | 2024-05-24T16:25:24+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_001 | Dismissed | 2024-05-24T16:24:36+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
Great Island |
Great Island |
Other_0000000000000009107_002 | Inactive | 2024-05-24T16:22:43+01:00 | 2029-12-24T16:19:00+00:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Unit Level. |
|||
Great Island |
Great Island |
Other_0000000000000009107_001 | Dismissed | 2024-05-24T16:18:52+01:00 | 2029-12-24T16:19:00+00:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Unit Level. |
|||
Other_0000000000000009072_002 | Inactive | 2024-05-17T23:02:32+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
Great Island |
Great Island |
Other_0000000000000009072_001 | Dismissed | 2024-05-08T10:08:54+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||
Other_0000000000000008475_003 | Inactive | 2024-05-17T23:02:32+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
Great Island |
Great Island |
Other_0000000000000008475_002 | Dismissed | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+01:00 | 2023-10-02T17:05:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:49+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:53+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_004 | Dismissed | 2024-05-16T18:36:19+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_003 | Dismissed | 2024-05-14T08:51:35+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_002 | Dismissed | 2024-05-13T17:15:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_001 | Dismissed | 2024-05-13T11:11:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running at circa 600MW for post outage commissioning works. |
||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_004 | Dismissed | 2024-04-25T10:49:47+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_003 | Dismissed | 2024-04-25T10:23:07+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+01:00 | 2024-04-26T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_001 | Dismissed | 2024-04-24T19:54:16+01:00 | 2024-04-25T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_002 | Inactive | 2024-04-23T01:02:47+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
Other_0000000000000008908_004 | Inactive | 2024-03-18T01:02:32+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |