Last update at: 2025-11-24T15:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | |||||||||
| Other_0000000000000010483_003 | Inactive | 2025-09-18T05:02:32+00:00 | 2025-09-16T17:00:00+00:00 | 2025-09-18T04:00:00+00:00 | Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 36hr period prior to return to commercial service. |
||||
| Other_0000000000000010483_002 | Dismissed | 2025-09-11T10:30:16+00:00 | 2025-09-16T17:00:00+00:00 | 2025-09-18T04:00:00+00:00 | Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 36hr period prior to return to commercial service. |
||||
| Other_0000000000000010483_001 | Dismissed | 2025-09-11T10:29:06+00:00 | 2025-09-16T17:00:00+00:00 | 2025-09-18T04:00:00+00:00 | Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 48hr period prior to return to commercial service. |
||||
| Other_0000000000000010484_002 | Dismissed | 2025-09-15T19:21:26+00:00 | 2025-09-16T22:00:00+00:00 | 2025-09-17T23:59:00+00:00 | 2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2. |
||||
| Other_0000000000000010484_001 | Dismissed | 2025-09-11T10:37:18+00:00 | 2025-09-16T22:00:00+00:00 | 2025-09-17T23:59:00+00:00 | 2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2. |
||||
| Other_0000000000000010477_002 | Inactive | 2025-09-12T20:02:32+00:00 | 2025-08-12T09:00:00+00:00 | 2025-09-12T19:00:00+00:00 | Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010477_001 | Dismissed | 2025-09-09T17:17:43+00:00 | 2025-08-12T09:00:00+00:00 | 2025-09-12T19:00:00+00:00 | Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010478_002 | Inactive | 2025-09-12T10:02:32+00:00 | 2025-08-12T09:00:00+00:00 | 2025-09-12T09:00:00+00:00 | Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010478_001 | Dismissed | 2025-09-09T17:20:22+00:00 | 2025-08-12T09:00:00+00:00 | 2025-09-12T09:00:00+00:00 | Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010037_004 | Inactive | 2025-09-02T00:02:31+00:00 | 2025-05-03T23:00:26+00:00 | 2025-09-01T23:00:44+00:00 | T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||||
| Other_0000000000000010037_003 | Dismissed | 2025-06-26T10:43:36+00:00 | 2025-05-03T23:00:26+00:00 | 2025-09-01T23:00:44+00:00 | T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||||
| Other_0000000000000010037_002 | Dismissed | 2025-05-16T13:29:51+00:00 | 2025-05-03T23:00:26+00:00 | 2025-08-01T23:00:44+00:00 | T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||||
| Other_0000000000000010037_001 | Dismissed | 2025-04-04T08:57:59+00:00 | 2025-05-03T23:00:26+00:00 | 2025-05-31T23:00:44+00:00 | T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000010455_001 | Active | 2025-08-29T13:38:33+00:00 | 2025-08-29T13:35:00+00:00 | 2026-03-31T16:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2026. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000010415_002 | Active | 2025-08-29T13:29:23+00:00 | 2025-08-08T11:05:15+00:00 | 2025-12-31T16:00:00+00:00 | • Dogger Bank A is currently in the commissioning phase, with 832MW of installed capacity as at 31 July 2025. It is expected that there will be a steady increase in installed capacity with installation expected to complete by the end of 2025 and the total capacity of 1.2 GW being substantially all available by the end of Q4 2025. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000010415_001 | Dismissed | 2025-08-08T10:54:41+00:00 | 2025-08-08T11:05:15+00:00 | 2025-08-29T16:00:25+00:00 | Dogger Bank A is currently in the commissioning phase, with 832MW of installed capacity as at 31 July 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during Q4 2025, subject to stabilisation of turbine performance. As relevant details of the commissioning plans become firmer this notice will be updated |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_003 | Inactive | 2025-08-24T18:02:32+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-24T17:00:00+00:00 | GI4 experienced a steam turbine fault. This fault is now being repaired |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_002 | Dismissed | 2025-08-21T16:16:45+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-24T17:00:00+00:00 | GI4 experienced a steam turbine fault. This fault is now being repaired |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_001 | Dismissed | 2025-08-20T17:18:49+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-25T17:00:45+00:00 | If GI4 is desynchronised a steam turbine fault investigation will be required. This would prevent GI4 from restarting for a period of time to be determined. |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010438_001 | Active | 2025-08-21T10:21:58+00:00 | 2025-08-21T10:30:00+00:00 | 2025-12-19T10:00:00+00:00 | It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010434_002 | Dismissed | 2025-08-20T09:23:18+00:00 | 2025-08-20T09:15:00+00:00 | 2025-08-20T09:25:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010434_001 | Dismissed | 2025-08-20T09:13:22+00:00 | 2025-08-20T09:15:00+00:00 | 2025-08-20T09:25:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010433_003 | Dismissed | 2025-08-20T09:07:13+00:00 | 2025-08-20T09:10:00+00:00 | 2025-08-20T09:30:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010433_002 | Dismissed | 2025-08-20T09:06:30+00:00 | 2025-08-20T09:10:00+00:00 | 2025-08-20T09:30:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010433_001 | Dismissed | 2025-08-20T09:00:50+00:00 | 2025-08-20T09:10:00+00:00 | 2025-08-20T09:30:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010430_002 | Dismissed | 2025-08-19T08:53:55+00:00 | 2025-08-19T09:30:00+00:00 | 2025-08-19T09:45:00+00:00 | Test Message - The message will be withdrawn once confirmed published. |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010430_001 | Dismissed | 2025-08-19T08:49:42+00:00 | 2025-08-19T09:30:00+00:00 | 2025-08-19T09:45:00+00:00 | Test Message - The message will be withdrawn once confirmed published. |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010428_002 | Dismissed | 2025-08-14T16:30:17+00:00 | 2025-08-14T16:30:00+00:00 | 2025-08-14T16:35:00+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010428_001 | Dismissed | 2025-08-14T16:29:48+00:00 | 2025-08-14T16:30:00+00:00 | 2025-08-14T16:35:00+00:00 | Test Message |
||
Ferrybridge Battery |
T_FERRB-1 |
Other_0000000000000010427_002 | Dismissed | 2025-08-14T14:38:09+00:00 | 2025-08-14T14:30:00+00:00 | 2025-08-14T14:30:33+00:00 | Test Message |
||
Ferrybridge Battery |
T_FERRB-1 |
Other_0000000000000010427_001 | Dismissed | 2025-08-14T14:27:22+00:00 | 2025-08-14T14:30:00+00:00 | 2025-08-14T14:30:33+00:00 | Test Message |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010426_002 | Dismissed | 2025-08-14T14:08:12+00:00 | 2025-08-14T13:05:00+00:00 | 2025-08-28T13:10:35+00:00 | test message. |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010426_001 | Dismissed | 2025-08-14T13:03:13+00:00 | 2025-08-14T13:05:00+00:00 | 2025-08-28T13:10:35+00:00 | test message. |
||
| Other_0000000000000010408_004 | Dismissed | 2025-08-11T16:33:21+00:00 | 2025-08-14T00:01:36+00:00 | 2025-08-15T23:59:59+00:00 | T_MEDP-1, 2+1 run required for post outage commissioning run |
||||
| Other_0000000000000010408_003 | Dismissed | 2025-08-08T10:12:13+00:00 | 2025-08-14T00:01:36+00:00 | 2025-08-15T23:59:59+00:00 | T_MEDP-1, 2+1 run required for post outage commissioning run |
||||
| Other_0000000000000010408_002 | Dismissed | 2025-08-06T09:49:46+00:00 | 2025-08-11T00:01:36+00:00 | 2025-08-12T23:59:59+00:00 | T_MEDP-1, 2+1 run required for post outage commissioning works |
||||
| Other_0000000000000010408_001 | Dismissed | 2025-08-05T08:54:41+00:00 | 2025-08-10T12:01:36+00:00 | 2025-08-12T23:59:59+00:00 | T_MEDP-1, 2+1 run required for post outage commissioning works |
||||
| Other_0000000000000010389_002 | Inactive | 2025-08-01T18:02:33+00:00 | 2025-07-30T08:00:28+00:00 | 2025-08-01T17:00:41+00:00 | PEHE-1 running at steady loads for commissioning. |
||||
| Other_0000000000000010389_001 | Dismissed | 2025-07-28T16:51:37+00:00 | 2025-07-30T08:00:28+00:00 | 2025-08-01T17:00:41+00:00 | PEHE-1 running at steady loads for commissioning. |
||||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_002 | Inactive | 2025-07-31T11:02:32+00:00 | 2024-09-27T09:18:00+00:00 | 2025-07-31T10:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_001 | Dismissed | 2024-09-27T09:23:00+00:00 | 2024-09-27T09:18:00+00:00 | 2025-07-31T10:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010365_002 | Dismissed | 2025-07-25T17:25:08+00:00 | 2025-07-22T10:37:55+00:00 | 2025-07-30T18:00:58+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-07-30 18:00 |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010365_001 | Dismissed | 2025-07-22T10:39:37+00:00 | 2025-07-22T10:37:55+00:00 | 2025-07-30T18:00:58+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-07-30 18:00 |
||
| Other_0000000000000010370_003 | Dismissed | 2025-07-24T13:58:08+00:00 | 2025-07-26T12:00:33+00:00 | 2025-07-28T19:00:44+00:00 | PEHE-1 running at circa 600MW for commissioning run |
||||
| Other_0000000000000010370_002 | Dismissed | 2025-07-24T08:55:32+00:00 | 2025-07-26T12:00:33+00:00 | 2025-07-28T19:00:44+00:00 | PEHE-1 running at circa 600MW for commissioning run |
||||
| Other_0000000000000010370_001 | Dismissed | 2025-07-22T16:19:07+00:00 | 2025-07-25T12:00:33+00:00 | 2025-07-27T19:00:44+00:00 | PEHE-1 running at circa 600MW for commissioning run |
||||
| Other_0000000000000010338_002 | Inactive | 2025-07-04T19:32:32+00:00 | 2025-07-04T08:00:00+00:00 | 2025-07-04T18:30:00+00:00 | Please be advised that Grid Code testing is scheduled to take place. A significant reduction in MW output is expected at times during the test window due to system requirements and test conditions. |
||||
Yellow River |
Yellow River |
Other_0000000000000010338_001 | Dismissed | 2025-07-02T17:51:05+00:00 | 2025-07-04T08:00:00+00:00 | 2025-07-04T18:30:00+00:00 | Please be advised that Grid Code testing is scheduled to take place. A significant reduction in MW output is expected at times during the test window due to system requirements and test conditions. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000009175_004 | Inactive | 2025-06-30T15:02:32+00:00 | 2024-06-21T14:00:00+00:00 | 2025-06-30T14:00:00+00:00 | Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000009175_003 | Dismissed | 2024-09-27T08:57:17+00:00 | 2024-06-21T14:00:00+00:00 | 2025-06-30T14:00:00+00:00 | Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||