Last update at: 2024-09-20T14:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_002 Active Planned Production unavailability 2024-09-20T13:59:06+01:00 2024-09-20T23:00:00+01:00 2024-09-27T17:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_001 Dismissed Planned Production unavailability 2024-09-20T10:48:35+01:00 2024-09-20T20:00:00+01:00 2024-09-27T17:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_002 Active Planned Production unavailability 2024-09-20T13:58:44+01:00 2024-09-20T23:00:00+01:00 2024-09-27T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_001 Dismissed Planned Production unavailability 2024-09-20T10:49:52+01:00 2024-09-20T20:00:00+01:00 2024-09-27T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009451_002 Inactive Planned Production unavailability 2024-09-20T13:02:33+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009452_002 Inactive Planned Consumption unavailability 2024-09-20T13:02:33+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009448_002 Inactive Planned Production unavailability 2024-09-20T13:02:33+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009449_002 Inactive Planned Consumption unavailability 2024-09-20T13:02:33+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009449_001 Dismissed Planned Consumption unavailability 2024-09-19T15:04:24+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009448_001 Dismissed Planned Production unavailability 2024-09-19T15:03:09+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009452_001 Dismissed Planned Consumption unavailability 2024-09-19T15:08:29+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009451_001 Dismissed Planned Production unavailability 2024-09-19T15:07:07+01:00 2024-09-20T06:00:00+01:00 2024-09-20T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_002 Active Planned Production unavailability 2024-09-20T10:45:06+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_001 Dismissed Planned Production unavailability 2024-09-19T14:31:01+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_002 Active Planned Production unavailability 2024-09-20T10:44:30+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_001 Dismissed Planned Production unavailability 2024-09-19T14:30:06+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009359_003 Active Planned Production unavailability 2024-09-20T10:43:42+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009359_002 Dismissed Planned Production unavailability 2024-09-19T14:27:59+01:00 2024-10-26T07:00:00+01:00 2024-10-29T19:00:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009359_001 Dismissed Planned Production unavailability 2024-08-26T10:54:05+01:00 2024-11-04T07:00:00+00:00 2024-11-07T19:00:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_011 Inactive Planned Production unavailability 2024-09-20T09:02:32+01:00 2024-07-24T17:00:00+01:00 2024-09-20T08:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_010 Dismissed Planned Production unavailability 2024-09-20T07:56:54+01:00 2024-07-24T17:00:00+01:00 2024-09-20T08:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_009 Dismissed Planned Production unavailability 2024-09-13T15:45:45+01:00 2024-07-24T17:00:00+01:00 2024-09-20T17:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_008 Dismissed Planned Production unavailability 2024-09-06T09:51:15+01:00 2024-07-24T17:00:00+01:00 2024-09-13T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_008 Inactive Planned Production unavailability 2024-09-20T09:02:32+01:00 2024-08-09T11:29:00+01:00 2024-09-20T08:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_007 Dismissed Planned Production unavailability 2024-09-20T07:57:21+01:00 2024-08-09T11:29:00+01:00 2024-09-20T08:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_007 Dismissed Planned Production unavailability 2024-08-22T10:33:49+01:00 2024-07-24T17:00:00+01:00 2024-09-06T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_006 Dismissed Planned Production unavailability 2024-08-16T10:41:40+01:00 2024-07-24T17:00:00+01:00 2024-08-23T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_006 Dismissed Planned Production unavailability 2024-09-13T15:43:46+01:00 2024-08-09T11:29:00+01:00 2024-09-20T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_005 Dismissed Planned Production unavailability 2024-09-06T09:51:34+01:00 2024-08-09T11:29:00+01:00 2024-09-13T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_005 Dismissed Planned Production unavailability 2024-08-09T11:29:01+01:00 2024-07-24T17:00:00+01:00 2024-08-16T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_004 Dismissed Planned Production unavailability 2024-08-07T12:02:15+01:00 2024-07-24T17:00:00+01:00 2024-08-09T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_004 Dismissed Planned Production unavailability 2024-08-22T10:34:07+01:00 2024-08-09T11:29:00+01:00 2024-09-06T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_003 Dismissed Planned Production unavailability 2024-08-16T10:41:23+01:00 2024-08-09T11:29:00+01:00 2024-08-23T17:00:00+01:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_003 Dismissed Planned Production unavailability 2024-08-02T10:38:51+01:00 2024-07-24T17:00:00+01:00 2024-08-09T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_002 Dismissed Planned Production unavailability 2024-07-29T15:13:37+01:00 2024-07-24T17:00:00+01:00 2024-08-02T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_002 Dismissed Planned Production unavailability 2024-08-16T10:41:08+01:00 2024-08-09T11:29:00+01:00 2024-08-16T17:00:00+01:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_001 Dismissed Planned Production unavailability 2024-08-09T11:30:12+01:00 2024-08-09T11:29:00+01:00 2024-08-16T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_001 Dismissed Planned Production unavailability 2024-07-25T17:04:41+01:00 2024-07-24T17:00:00+01:00 2024-07-29T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_003 Inactive Planned Consumption unavailability 2024-09-20T07:02:32+01:00 2024-09-19T13:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_002 Dismissed Planned Consumption unavailability 2024-09-19T15:04:51+01:00 2024-09-19T13:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009447_002 Inactive Planned Production unavailability 2024-09-20T07:02:32+01:00 2024-09-20T00:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009447_001 Dismissed Planned Production unavailability 2024-09-19T15:01:53+01:00 2024-09-20T00:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_001 Dismissed Planned Consumption unavailability 2024-09-19T07:51:04+01:00 2024-09-19T13:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009446_002 Inactive Planned Production unavailability 2024-09-20T01:02:32+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009450_002 Inactive Planned Consumption unavailability 2024-09-20T01:02:32+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009450_001 Dismissed Planned Consumption unavailability 2024-09-19T15:05:54+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009446_001 Dismissed Planned Production unavailability 2024-09-19T15:00:39+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_003 Inactive Planned Production unavailability 2024-09-19T19:02:32+01:00 2024-09-19T13:00:00+01:00 2024-09-19T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_002 Dismissed Planned Production unavailability 2024-09-19T14:59:22+01:00 2024-09-19T13:00:00+01:00 2024-09-19T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_001 Dismissed Planned Production unavailability 2024-09-19T07:49:57+01:00 2024-09-19T13:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A