Last update at: 2024-09-20T14:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_002 | Active | Planned | Production unavailability | 2024-09-20T13:59:06+01:00 | 2024-09-20T23:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:48:35+01:00 | 2024-09-20T20:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_002 | Active | Planned | Production unavailability | 2024-09-20T13:58:44+01:00 | 2024-09-20T23:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:49:52+01:00 | 2024-09-20T20:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009451_002 | Inactive | Planned | Production unavailability | 2024-09-20T13:02:33+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009452_002 | Inactive | Planned | Consumption unavailability | 2024-09-20T13:02:33+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009448_002 | Inactive | Planned | Production unavailability | 2024-09-20T13:02:33+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009449_002 | Inactive | Planned | Consumption unavailability | 2024-09-20T13:02:33+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009449_001 | Dismissed | Planned | Consumption unavailability | 2024-09-19T15:04:24+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009448_001 | Dismissed | Planned | Production unavailability | 2024-09-19T15:03:09+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009452_001 | Dismissed | Planned | Consumption unavailability | 2024-09-19T15:08:29+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009451_001 | Dismissed | Planned | Production unavailability | 2024-09-19T15:07:07+01:00 | 2024-09-20T06:00:00+01:00 | 2024-09-20T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009445_002 | Active | Planned | Production unavailability | 2024-09-20T10:45:06+01:00 | 2024-11-11T07:00:00+00:00 | 2024-11-14T19:00:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009445_001 | Dismissed | Planned | Production unavailability | 2024-09-19T14:31:01+01:00 | 2024-10-22T07:00:00+01:00 | 2024-10-25T19:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009444_002 | Active | Planned | Production unavailability | 2024-09-20T10:44:30+01:00 | 2024-11-11T07:00:00+00:00 | 2024-11-14T19:00:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009444_001 | Dismissed | Planned | Production unavailability | 2024-09-19T14:30:06+01:00 | 2024-10-22T07:00:00+01:00 | 2024-10-25T19:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009359_003 | Active | Planned | Production unavailability | 2024-09-20T10:43:42+01:00 | 2024-10-22T07:00:00+01:00 | 2024-10-25T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009359_002 | Dismissed | Planned | Production unavailability | 2024-09-19T14:27:59+01:00 | 2024-10-26T07:00:00+01:00 | 2024-10-29T19:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009359_001 | Dismissed | Planned | Production unavailability | 2024-08-26T10:54:05+01:00 | 2024-11-04T07:00:00+00:00 | 2024-11-07T19:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_011 | Inactive | Planned | Production unavailability | 2024-09-20T09:02:32+01:00 | 2024-07-24T17:00:00+01:00 | 2024-09-20T08:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_010 | Dismissed | Planned | Production unavailability | 2024-09-20T07:56:54+01:00 | 2024-07-24T17:00:00+01:00 | 2024-09-20T08:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_009 | Dismissed | Planned | Production unavailability | 2024-09-13T15:45:45+01:00 | 2024-07-24T17:00:00+01:00 | 2024-09-20T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_008 | Dismissed | Planned | Production unavailability | 2024-09-06T09:51:15+01:00 | 2024-07-24T17:00:00+01:00 | 2024-09-13T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_008 | Inactive | Planned | Production unavailability | 2024-09-20T09:02:32+01:00 | 2024-08-09T11:29:00+01:00 | 2024-09-20T08:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_007 | Dismissed | Planned | Production unavailability | 2024-09-20T07:57:21+01:00 | 2024-08-09T11:29:00+01:00 | 2024-09-20T08:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_007 | Dismissed | Planned | Production unavailability | 2024-08-22T10:33:49+01:00 | 2024-07-24T17:00:00+01:00 | 2024-09-06T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_006 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:40+01:00 | 2024-07-24T17:00:00+01:00 | 2024-08-23T17:00:00+01:00 | MW | 107 | 50 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_006 | Dismissed | Planned | Production unavailability | 2024-09-13T15:43:46+01:00 | 2024-08-09T11:29:00+01:00 | 2024-09-20T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_005 | Dismissed | Planned | Production unavailability | 2024-09-06T09:51:34+01:00 | 2024-08-09T11:29:00+01:00 | 2024-09-13T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_005 | Dismissed | Planned | Production unavailability | 2024-08-09T11:29:01+01:00 | 2024-07-24T17:00:00+01:00 | 2024-08-16T17:00:00+01:00 | MW | 107 | 50 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_004 | Dismissed | Planned | Production unavailability | 2024-08-07T12:02:15+01:00 | 2024-07-24T17:00:00+01:00 | 2024-08-09T17:00:00+01:00 | MW | 107 | 50 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_004 | Dismissed | Planned | Production unavailability | 2024-08-22T10:34:07+01:00 | 2024-08-09T11:29:00+01:00 | 2024-09-06T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_003 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:23+01:00 | 2024-08-09T11:29:00+01:00 | 2024-08-23T17:00:00+01:00 | MW | 13 | 26 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_003 | Dismissed | Planned | Production unavailability | 2024-08-02T10:38:51+01:00 | 2024-07-24T17:00:00+01:00 | 2024-08-09T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_002 | Dismissed | Planned | Production unavailability | 2024-07-29T15:13:37+01:00 | 2024-07-24T17:00:00+01:00 | 2024-08-02T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_002 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:08+01:00 | 2024-08-09T11:29:00+01:00 | 2024-08-16T17:00:00+01:00 | MW | 13 | 26 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_001 | Dismissed | Planned | Production unavailability | 2024-08-09T11:30:12+01:00 | 2024-08-09T11:29:00+01:00 | 2024-08-16T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_001 | Dismissed | Planned | Production unavailability | 2024-07-25T17:04:41+01:00 | 2024-07-24T17:00:00+01:00 | 2024-07-29T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009443_003 | Inactive | Planned | Consumption unavailability | 2024-09-20T07:02:32+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-20T06:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009443_002 | Dismissed | Planned | Consumption unavailability | 2024-09-19T15:04:51+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-20T06:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009447_002 | Inactive | Planned | Production unavailability | 2024-09-20T07:02:32+01:00 | 2024-09-20T00:00:00+01:00 | 2024-09-20T06:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009447_001 | Dismissed | Planned | Production unavailability | 2024-09-19T15:01:53+01:00 | 2024-09-20T00:00:00+01:00 | 2024-09-20T06:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009443_001 | Dismissed | Planned | Consumption unavailability | 2024-09-19T07:51:04+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-20T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009446_002 | Inactive | Planned | Production unavailability | 2024-09-20T01:02:32+01:00 | 2024-09-19T18:00:00+01:00 | 2024-09-20T00:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009450_002 | Inactive | Planned | Consumption unavailability | 2024-09-20T01:02:32+01:00 | 2024-09-19T18:00:00+01:00 | 2024-09-20T00:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009450_001 | Dismissed | Planned | Consumption unavailability | 2024-09-19T15:05:54+01:00 | 2024-09-19T18:00:00+01:00 | 2024-09-20T00:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009446_001 | Dismissed | Planned | Production unavailability | 2024-09-19T15:00:39+01:00 | 2024-09-19T18:00:00+01:00 | 2024-09-20T00:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009442_003 | Inactive | Planned | Production unavailability | 2024-09-19T19:02:32+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-19T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009442_002 | Dismissed | Planned | Production unavailability | 2024-09-19T14:59:22+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-19T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009442_001 | Dismissed | Planned | Production unavailability | 2024-09-19T07:49:57+01:00 | 2024-09-19T13:00:00+01:00 | 2024-09-20T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |