SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-11-24T15:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 1 2 3 4 5 >
Dogger Bank A
48X0000000003113
Other_0000000000000009175_002 Dismissed 2024-06-21T14:23:06+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_001 Dismissed 2024-06-21T14:21:28+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_004 Inactive 2025-06-30T13:02:32+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_003 Dismissed 2025-06-18T14:05:25+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_002 Dismissed 2025-05-09T19:18:48+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_001 Dismissed 2025-05-09T19:18:20+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00
Other_0000000000000010248_002 Inactive 2025-06-20T14:02:32+00:00 2025-06-20T09:00:00+00:00 2025-06-20T13:00:00+00:00
Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Foyers
T_FOYE-1
Other_0000000000000010248_001 Dismissed 2025-05-30T15:59:36+00:00 2025-06-20T09:00:00+00:00 2025-06-20T13:00:00+00:00
Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Other_0000000000000010247_002 Inactive 2025-06-18T14:02:32+00:00 2025-06-18T09:00:00+00:00 2025-06-18T13:00:00+00:00
Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Foyers
T_FOYE-2
Other_0000000000000010247_001 Dismissed 2025-05-30T15:58:21+00:00 2025-06-18T09:00:00+00:00 2025-06-18T13:00:00+00:00
Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Other_0000000000000010283_002 Inactive 2025-06-16T18:02:32+00:00 2025-06-12T17:14:46+00:00 2025-06-16T17:00:49+00:00
Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT.
Foyers
T_FOYE-2
Other_0000000000000010283_001 Dismissed 2025-06-12T17:15:23+00:00 2025-06-12T17:14:46+00:00 2025-06-16T17:00:49+00:00
Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT.
SSE GENERATION
48X000000000077M
Other_0000000000000010264_002 Dismissed 2025-06-12T17:15:41+00:00 2025-06-05T12:41:20+00:00 2025-06-13T21:00:00+00:00
Between 06/06/25 & 13/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT
SSE GENERATION
48X000000000077M
Other_0000000000000010264_001 Dismissed 2025-06-05T12:47:20+00:00 2025-06-05T12:41:20+00:00 2025-06-13T21:00:00+00:00
Between 06/06/25 & 13/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT
Other_0000000000000010249_007 Inactive 2025-06-10T04:02:32+00:00 2025-06-09T04:00:00+00:00 2025-06-10T03:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_006 Dismissed 2025-06-09T04:06:38+00:00 2025-06-09T04:00:00+00:00 2025-06-10T03:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_005 Dismissed 2025-06-09T04:05:58+00:00 2025-06-09T10:00:00+00:00 2025-06-10T03:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_004 Dismissed 2025-06-09T01:51:19+00:00 2025-06-09T10:00:00+00:00 2025-06-10T09:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_003 Dismissed 2025-06-09T01:48:39+00:00 2025-06-09T02:00:00+00:00 2025-06-10T09:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_002 Dismissed 2025-06-09T00:19:30+00:00 2025-06-09T02:00:00+00:00 2025-06-10T01:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000010249_001 Dismissed 2025-05-31T12:56:35+00:00 2025-06-09T00:00:00+00:00 2025-06-09T23:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000009284_007 Inactive 2025-06-10T04:02:32+00:00 2024-08-02T00:00:00+00:00 2025-06-10T03:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_006 Dismissed 2025-06-09T04:07:03+00:00 2024-08-02T00:00:00+00:00 2025-06-10T03:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_005 Dismissed 2025-06-09T01:48:55+00:00 2024-08-02T00:00:00+00:00 2025-06-10T09:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_004 Dismissed 2025-06-09T00:24:09+00:00 2024-08-02T00:00:00+00:00 2025-06-10T01:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_003 Dismissed 2025-05-31T12:59:58+00:00 2024-08-02T00:00:00+00:00 2025-06-09T23:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_002 Dismissed 2024-11-11T14:44:45+00:00 2024-08-02T00:00:00+00:00 2025-06-06T23:59:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000009284_001 Dismissed 2024-07-29T14:17:35+00:00 2024-08-02T00:00:00+00:00 2025-04-30T00:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Foyers
T_FOYE-2
Other_0000000000000010257_002 Dismissed 2025-06-05T12:47:38+00:00 2025-06-03T14:33:20+00:00 2025-06-13T21:00:00+00:00
Testing at Foyers Power Station has been suspended until further investigations have been carried out on GT2. This information is disclosed in accordance with Article 4 of REMIT.
Foyers
T_FOYE-2
Other_0000000000000010257_001 Dismissed 2025-06-03T14:38:13+00:00 2025-06-03T14:33:20+00:00 2025-06-13T21:00:00+00:00
Testing at Foyers Power Station has been suspended until further investigations have been carried out on GT2. This information is disclosed in accordance with Article 4 of REMIT.
SSE GENERATION
48X000000000077M
Other_0000000000000010181_005 Dismissed 2025-06-03T14:38:30+00:00 2025-05-29T07:00:00+00:00 2025-06-06T21:00:00+00:00
Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT
SSE GENERATION
48X000000000077M
Other_0000000000000010181_004 Dismissed 2025-05-29T11:56:09+00:00 2025-05-29T07:00:00+00:00 2025-06-06T21:00:00+00:00
Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT
SSE GENERATION
48X000000000077M
Other_0000000000000010181_003 Dismissed 2025-05-29T08:26:24+00:00 2025-05-29T07:00:00+00:00 2025-06-06T21:00:00+00:00
Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT
SSE GENERATION
48X000000000077M
Other_0000000000000010181_002 Dismissed 2025-05-27T10:31:58+00:00 2025-05-29T09:00:00+00:00 2025-06-06T21:00:00+00:00
Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT
SSE GENERATION
48X000000000077M
Other_0000000000000010181_001 Dismissed 2025-05-27T10:28:03+00:00 2025-05-29T09:00:00+00:00 2025-06-06T21:00:00+00:00
Between 29/05/25 & 6/05/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT
Other_0000000000000010169_003 Inactive 2025-05-28T18:02:32+00:00 2025-05-28T13:15:00+00:00 2025-05-28T17:00:00+00:00
Other Market Information message withdrawn – site commissioning complete.
Yellow River
Yellow River
Other_0000000000000010169_002 Dismissed 2025-05-28T13:10:30+00:00 2025-05-28T13:15:00+00:00 2025-05-28T17:00:00+00:00
Other Market Information message withdrawn – site commissioning complete.
Yellow River
Yellow River
Other_0000000000000010169_001 Dismissed 2025-05-23T10:23:46+00:00 2025-05-23T10:30:00+00:00 2025-05-28T17:00:00+00:00
#Commissioning# Current capacity 101MW. Commissioning is scheduled to conclude Q2 2025.
Other_0000000000000010152_002 Inactive 2025-05-23T00:02:32+00:00 2025-05-20T10:00:25+00:00 2025-05-22T23:00:37+00:00
Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025
Other_0000000000000010152_001 Dismissed 2025-05-15T15:58:37+00:00 2025-05-20T10:00:25+00:00 2025-05-22T23:00:37+00:00
Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025
Other_0000000000000010142_002 Inactive 2025-05-14T18:02:32+00:00 2025-05-12T16:00:00+00:00 2025-05-14T17:00:00+00:00
#Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude Q2 2025. Anticipated increase to 101MW on 14/05/2025
Yellow River
Yellow River
Other_0000000000000010142_001 Dismissed 2025-05-12T16:11:39+00:00 2025-05-12T16:00:00+00:00 2025-05-14T17:00:00+00:00
#Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude Q2 2025. Anticipated increase to 101MW on 14/05/2025
Other_0000000000000010099_004 Inactive 2025-05-10T01:02:32+00:00 2025-05-08T23:59:00+00:00 2025-05-09T23:59:00+00:00
For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000010099_003 Dismissed 2025-05-01T10:21:43+00:00 2025-05-08T23:59:00+00:00 2025-05-09T23:59:00+00:00
For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000010099_002 Dismissed 2025-05-01T10:15:16+00:00 2025-05-08T23:59:00+00:00 2025-05-09T23:59:00+00:00
For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 02/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000010099_001 Dismissed 2025-04-28T17:31:19+00:00 2025-05-01T23:59:00+00:00 2025-05-02T23:59:00+00:00
For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 02/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000010123_002 Inactive 2025-05-10T01:02:32+00:00 2025-05-08T23:59:24+00:00 2025-05-10T00:00:56+00:00
T_PEHE-1 running out of merit in 2+1 configuration circa 780MW due to allow recovery from fuel supply issues.
Other_0000000000000010123_001 Dismissed 2025-05-08T09:20:07+00:00 2025-05-08T23:59:24+00:00 2025-05-10T00:00:56+00:00
T_PEHE-1 running out of merit in 2+1 configuration circa 780MW due to allow recovery from fuel supply issues.
Other_0000000000000009955_002 Inactive 2025-04-02T20:02:32+00:00 2025-03-06T17:02:01+00:00 2025-04-02T19:00:00+00:00
Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025.
Other_0000000000000009955_001 Dismissed 2025-03-06T17:04:05+00:00 2025-03-06T17:02:01+00:00 2025-04-02T19:00:00+00:00
Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025.