Last update at: 2025-11-24T15:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | |||||||||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_002 | Dismissed | 2024-06-21T14:23:06+00:00 | 2024-06-21T14:00:00+00:00 | 2025-03-31T14:00:00+00:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_001 | Dismissed | 2024-06-21T14:21:28+00:00 | 2024-06-21T14:00:00+00:00 | 2025-03-31T14:00:00+00:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010134_004 | Inactive | 2025-06-30T13:02:32+00:00 | 2025-04-18T08:07:55+00:00 | 2025-06-30T12:00:00+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00 |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010134_003 | Dismissed | 2025-06-18T14:05:25+00:00 | 2025-04-18T08:07:55+00:00 | 2025-06-30T12:00:00+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00 |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010134_002 | Dismissed | 2025-05-09T19:18:48+00:00 | 2025-04-18T08:07:55+00:00 | 2025-06-30T12:00:00+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00 |
||
Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | Other_0000000000000010134_001 | Dismissed | 2025-05-09T19:18:20+00:00 | 2025-04-18T08:07:55+00:00 | 2025-06-30T12:00:00+00:00 | Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00 |
||
| Other_0000000000000010248_002 | Inactive | 2025-06-20T14:02:32+00:00 | 2025-06-20T09:00:00+00:00 | 2025-06-20T13:00:00+00:00 | Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-1 |
Other_0000000000000010248_001 | Dismissed | 2025-05-30T15:59:36+00:00 | 2025-06-20T09:00:00+00:00 | 2025-06-20T13:00:00+00:00 | Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||
| Other_0000000000000010247_002 | Inactive | 2025-06-18T14:02:32+00:00 | 2025-06-18T09:00:00+00:00 | 2025-06-18T13:00:00+00:00 | Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-2 |
Other_0000000000000010247_001 | Dismissed | 2025-05-30T15:58:21+00:00 | 2025-06-18T09:00:00+00:00 | 2025-06-18T13:00:00+00:00 | Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||
| Other_0000000000000010283_002 | Inactive | 2025-06-16T18:02:32+00:00 | 2025-06-12T17:14:46+00:00 | 2025-06-16T17:00:49+00:00 | Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-2 |
Other_0000000000000010283_001 | Dismissed | 2025-06-12T17:15:23+00:00 | 2025-06-12T17:14:46+00:00 | 2025-06-16T17:00:49+00:00 | Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010264_002 | Dismissed | 2025-06-12T17:15:41+00:00 | 2025-06-05T12:41:20+00:00 | 2025-06-13T21:00:00+00:00 | Between 06/06/25 & 13/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010264_001 | Dismissed | 2025-06-05T12:47:20+00:00 | 2025-06-05T12:41:20+00:00 | 2025-06-13T21:00:00+00:00 | Between 06/06/25 & 13/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT |
||
| Other_0000000000000010249_007 | Inactive | 2025-06-10T04:02:32+00:00 | 2025-06-09T04:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_006 | Dismissed | 2025-06-09T04:06:38+00:00 | 2025-06-09T04:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_005 | Dismissed | 2025-06-09T04:05:58+00:00 | 2025-06-09T10:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_004 | Dismissed | 2025-06-09T01:51:19+00:00 | 2025-06-09T10:00:00+00:00 | 2025-06-10T09:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_003 | Dismissed | 2025-06-09T01:48:39+00:00 | 2025-06-09T02:00:00+00:00 | 2025-06-10T09:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_002 | Dismissed | 2025-06-09T00:19:30+00:00 | 2025-06-09T02:00:00+00:00 | 2025-06-10T01:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000010249_001 | Dismissed | 2025-05-31T12:56:35+00:00 | 2025-06-09T00:00:00+00:00 | 2025-06-09T23:00:00+00:00 | Unit will be completing testing within the range of 165MW - 464MW following completion of Outage. |
||||
| Other_0000000000000009284_007 | Inactive | 2025-06-10T04:02:32+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_006 | Dismissed | 2025-06-09T04:07:03+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_005 | Dismissed | 2025-06-09T01:48:55+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T09:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_004 | Dismissed | 2025-06-09T00:24:09+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T01:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_003 | Dismissed | 2025-05-31T12:59:58+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-09T23:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_002 | Dismissed | 2024-11-11T14:44:45+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-06T23:59:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_001 | Dismissed | 2024-07-29T14:17:35+00:00 | 2024-08-02T00:00:00+00:00 | 2025-04-30T00:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
Foyers |
T_FOYE-2 |
Other_0000000000000010257_002 | Dismissed | 2025-06-05T12:47:38+00:00 | 2025-06-03T14:33:20+00:00 | 2025-06-13T21:00:00+00:00 | Testing at Foyers Power Station has been suspended until further investigations have been carried out on GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||
Foyers |
T_FOYE-2 |
Other_0000000000000010257_001 | Dismissed | 2025-06-03T14:38:13+00:00 | 2025-06-03T14:33:20+00:00 | 2025-06-13T21:00:00+00:00 | Testing at Foyers Power Station has been suspended until further investigations have been carried out on GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010181_005 | Dismissed | 2025-06-03T14:38:30+00:00 | 2025-05-29T07:00:00+00:00 | 2025-06-06T21:00:00+00:00 | Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010181_004 | Dismissed | 2025-05-29T11:56:09+00:00 | 2025-05-29T07:00:00+00:00 | 2025-06-06T21:00:00+00:00 | Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M1 & M2 will be available intermittently during the testing period. M1 should be available to market out with testing period. This information is disclosed in accordance with Article 4 of REMIT |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010181_003 | Dismissed | 2025-05-29T08:26:24+00:00 | 2025-05-29T07:00:00+00:00 | 2025-06-06T21:00:00+00:00 | Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010181_002 | Dismissed | 2025-05-27T10:31:58+00:00 | 2025-05-29T09:00:00+00:00 | 2025-06-06T21:00:00+00:00 | Between 29/05/25 & 6/06/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000010181_001 | Dismissed | 2025-05-27T10:28:03+00:00 | 2025-05-29T09:00:00+00:00 | 2025-06-06T21:00:00+00:00 | Between 29/05/25 & 6/05/25 Foyers M1 & M2 will carry out test runs of pump & generation capability as part of post fault recommissioning of GT2. Test program is subject to suitable grid conditions and water storage positions with testing expected to take place daily between 07:00 & 21:00. M2 will not be commercially available for the duration of the testing, M1 should be available to the market out with the daily testing window. This information is disclosed in accordance with Article 4 of REMIT |
||
| Other_0000000000000010169_003 | Inactive | 2025-05-28T18:02:32+00:00 | 2025-05-28T13:15:00+00:00 | 2025-05-28T17:00:00+00:00 | Other Market Information message withdrawn – site commissioning complete. |
||||
Yellow River |
Yellow River |
Other_0000000000000010169_002 | Dismissed | 2025-05-28T13:10:30+00:00 | 2025-05-28T13:15:00+00:00 | 2025-05-28T17:00:00+00:00 | Other Market Information message withdrawn – site commissioning complete. |
||
Yellow River |
Yellow River |
Other_0000000000000010169_001 | Dismissed | 2025-05-23T10:23:46+00:00 | 2025-05-23T10:30:00+00:00 | 2025-05-28T17:00:00+00:00 | #Commissioning# Current capacity 101MW. Commissioning is scheduled to conclude Q2 2025. |
||
| Other_0000000000000010152_002 | Inactive | 2025-05-23T00:02:32+00:00 | 2025-05-20T10:00:25+00:00 | 2025-05-22T23:00:37+00:00 | Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025 |
||||
| Other_0000000000000010152_001 | Dismissed | 2025-05-15T15:58:37+00:00 | 2025-05-20T10:00:25+00:00 | 2025-05-22T23:00:37+00:00 | Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025 |
||||
| Other_0000000000000010142_002 | Inactive | 2025-05-14T18:02:32+00:00 | 2025-05-12T16:00:00+00:00 | 2025-05-14T17:00:00+00:00 | #Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude Q2 2025. Anticipated increase to 101MW on 14/05/2025 |
||||
Yellow River |
Yellow River |
Other_0000000000000010142_001 | Dismissed | 2025-05-12T16:11:39+00:00 | 2025-05-12T16:00:00+00:00 | 2025-05-14T17:00:00+00:00 | #Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude Q2 2025. Anticipated increase to 101MW on 14/05/2025 |
||
| Other_0000000000000010099_004 | Inactive | 2025-05-10T01:02:32+00:00 | 2025-05-08T23:59:00+00:00 | 2025-05-09T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010099_003 | Dismissed | 2025-05-01T10:21:43+00:00 | 2025-05-08T23:59:00+00:00 | 2025-05-09T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010099_002 | Dismissed | 2025-05-01T10:15:16+00:00 | 2025-05-08T23:59:00+00:00 | 2025-05-09T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 02/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010099_001 | Dismissed | 2025-04-28T17:31:19+00:00 | 2025-05-01T23:59:00+00:00 | 2025-05-02T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 02/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010123_002 | Inactive | 2025-05-10T01:02:32+00:00 | 2025-05-08T23:59:24+00:00 | 2025-05-10T00:00:56+00:00 | T_PEHE-1 running out of merit in 2+1 configuration circa 780MW due to allow recovery from fuel supply issues. |
||||
| Other_0000000000000010123_001 | Dismissed | 2025-05-08T09:20:07+00:00 | 2025-05-08T23:59:24+00:00 | 2025-05-10T00:00:56+00:00 | T_PEHE-1 running out of merit in 2+1 configuration circa 780MW due to allow recovery from fuel supply issues. |
||||
| Other_0000000000000009955_002 | Inactive | 2025-04-02T20:02:32+00:00 | 2025-03-06T17:02:01+00:00 | 2025-04-02T19:00:00+00:00 | Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025. |
||||
| Other_0000000000000009955_001 | Dismissed | 2025-03-06T17:04:05+00:00 | 2025-03-06T17:02:01+00:00 | 2025-04-02T19:00:00+00:00 | Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025. |
||||