SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-01-22T11:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 1 2 3 4 5 >
Other_0000000000000010477_002 Inactive 2025-09-12T20:02:32+00:00 2025-08-12T09:00:00+00:00 2025-09-12T19:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010477_001 Dismissed 2025-09-09T17:17:43+00:00 2025-08-12T09:00:00+00:00 2025-09-12T19:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010478_002 Inactive 2025-09-12T10:02:32+00:00 2025-08-12T09:00:00+00:00 2025-09-12T09:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010478_001 Dismissed 2025-09-09T17:20:22+00:00 2025-08-12T09:00:00+00:00 2025-09-12T09:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010037_004 Inactive 2025-09-02T00:02:31+00:00 2025-05-03T23:00:26+00:00 2025-09-01T23:00:44+00:00
T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000010037_003 Dismissed 2025-06-26T10:43:36+00:00 2025-05-03T23:00:26+00:00 2025-09-01T23:00:44+00:00
T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000010037_002 Dismissed 2025-05-16T13:29:51+00:00 2025-05-03T23:00:26+00:00 2025-08-01T23:00:44+00:00
T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000010037_001 Dismissed 2025-04-04T08:57:59+00:00 2025-05-03T23:00:26+00:00 2025-05-31T23:00:44+00:00
T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000010435_003 Inactive 2025-08-24T18:02:32+00:00 2025-08-20T17:14:21+00:00 2025-08-24T17:00:00+00:00
GI4 experienced a steam turbine fault. This fault is now being repaired
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000010435_002 Dismissed 2025-08-21T16:16:45+00:00 2025-08-20T17:14:21+00:00 2025-08-24T17:00:00+00:00
GI4 experienced a steam turbine fault. This fault is now being repaired
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000010435_001 Dismissed 2025-08-20T17:18:49+00:00 2025-08-20T17:14:21+00:00 2025-08-25T17:00:45+00:00
If GI4 is desynchronised a steam turbine fault investigation will be required. This would prevent GI4 from restarting for a period of time to be determined.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_001 Active 2025-08-21T10:21:58+00:00 2025-08-21T10:30:00+00:00 2025-12-19T10:00:00+00:00
It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010434_002 Dismissed 2025-08-20T09:23:18+00:00 2025-08-20T09:15:00+00:00 2025-08-20T09:25:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010434_001 Dismissed 2025-08-20T09:13:22+00:00 2025-08-20T09:15:00+00:00 2025-08-20T09:25:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010433_003 Dismissed 2025-08-20T09:07:13+00:00 2025-08-20T09:10:00+00:00 2025-08-20T09:30:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010433_002 Dismissed 2025-08-20T09:06:30+00:00 2025-08-20T09:10:00+00:00 2025-08-20T09:30:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010433_001 Dismissed 2025-08-20T09:00:50+00:00 2025-08-20T09:10:00+00:00 2025-08-20T09:30:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010430_002 Dismissed 2025-08-19T08:53:55+00:00 2025-08-19T09:30:00+00:00 2025-08-19T09:45:00+00:00
Test Message - The message will be withdrawn once confirmed published.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010430_001 Dismissed 2025-08-19T08:49:42+00:00 2025-08-19T09:30:00+00:00 2025-08-19T09:45:00+00:00
Test Message - The message will be withdrawn once confirmed published.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010428_002 Dismissed 2025-08-14T16:30:17+00:00 2025-08-14T16:30:00+00:00 2025-08-14T16:35:00+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010428_001 Dismissed 2025-08-14T16:29:48+00:00 2025-08-14T16:30:00+00:00 2025-08-14T16:35:00+00:00
Test Message
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010427_002 Dismissed 2025-08-14T14:38:09+00:00 2025-08-14T14:30:00+00:00 2025-08-14T14:30:33+00:00
Test Message
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010427_001 Dismissed 2025-08-14T14:27:22+00:00 2025-08-14T14:30:00+00:00 2025-08-14T14:30:33+00:00
Test Message
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010426_002 Dismissed 2025-08-14T14:08:12+00:00 2025-08-14T13:05:00+00:00 2025-08-28T13:10:35+00:00
test message.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010426_001 Dismissed 2025-08-14T13:03:13+00:00 2025-08-14T13:05:00+00:00 2025-08-28T13:10:35+00:00
test message.
Other_0000000000000010408_004 Dismissed 2025-08-11T16:33:21+00:00 2025-08-14T00:01:36+00:00 2025-08-15T23:59:59+00:00
T_MEDP-1, 2+1 run required for post outage commissioning run
Other_0000000000000010408_003 Dismissed 2025-08-08T10:12:13+00:00 2025-08-14T00:01:36+00:00 2025-08-15T23:59:59+00:00
T_MEDP-1, 2+1 run required for post outage commissioning run
Other_0000000000000010408_002 Dismissed 2025-08-06T09:49:46+00:00 2025-08-11T00:01:36+00:00 2025-08-12T23:59:59+00:00
T_MEDP-1, 2+1 run required for post outage commissioning works
Other_0000000000000010408_001 Dismissed 2025-08-05T08:54:41+00:00 2025-08-10T12:01:36+00:00 2025-08-12T23:59:59+00:00
T_MEDP-1, 2+1 run required for post outage commissioning works
Other_0000000000000010389_002 Inactive 2025-08-01T18:02:33+00:00 2025-07-30T08:00:28+00:00 2025-08-01T17:00:41+00:00
PEHE-1 running at steady loads for commissioning.
Other_0000000000000010389_001 Dismissed 2025-07-28T16:51:37+00:00 2025-07-30T08:00:28+00:00 2025-08-01T17:00:41+00:00
PEHE-1 running at steady loads for commissioning.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000009473_002 Inactive 2025-07-31T11:02:32+00:00 2024-09-27T09:18:00+00:00 2025-07-31T10:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000009473_001 Dismissed 2024-09-27T09:23:00+00:00 2024-09-27T09:18:00+00:00 2025-07-31T10:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010365_002 Dismissed 2025-07-25T17:25:08+00:00 2025-07-22T10:37:55+00:00 2025-07-30T18:00:58+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-07-30 18:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010365_001 Dismissed 2025-07-22T10:39:37+00:00 2025-07-22T10:37:55+00:00 2025-07-30T18:00:58+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-07-30 18:00
Other_0000000000000010370_003 Dismissed 2025-07-24T13:58:08+00:00 2025-07-26T12:00:33+00:00 2025-07-28T19:00:44+00:00
PEHE-1 running at circa 600MW for commissioning run
Other_0000000000000010370_002 Dismissed 2025-07-24T08:55:32+00:00 2025-07-26T12:00:33+00:00 2025-07-28T19:00:44+00:00
PEHE-1 running at circa 600MW for commissioning run
Other_0000000000000010370_001 Dismissed 2025-07-22T16:19:07+00:00 2025-07-25T12:00:33+00:00 2025-07-27T19:00:44+00:00
PEHE-1 running at circa 600MW for commissioning run
Other_0000000000000010338_002 Inactive 2025-07-04T19:32:32+00:00 2025-07-04T08:00:00+00:00 2025-07-04T18:30:00+00:00
Please be advised that Grid Code testing is scheduled to take place. A significant reduction in MW output is expected at times during the test window due to system requirements and test conditions.
Yellow River
Yellow River
Other_0000000000000010338_001 Dismissed 2025-07-02T17:51:05+00:00 2025-07-04T08:00:00+00:00 2025-07-04T18:30:00+00:00
Please be advised that Grid Code testing is scheduled to take place. A significant reduction in MW output is expected at times during the test window due to system requirements and test conditions.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_004 Inactive 2025-06-30T15:02:32+00:00 2024-06-21T14:00:00+00:00 2025-06-30T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_003 Dismissed 2024-09-27T08:57:17+00:00 2024-06-21T14:00:00+00:00 2025-06-30T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_002 Dismissed 2024-06-21T14:23:06+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_001 Dismissed 2024-06-21T14:21:28+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_004 Inactive 2025-06-30T13:02:32+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_003 Dismissed 2025-06-18T14:05:25+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_002 Dismissed 2025-05-09T19:18:48+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_001 Dismissed 2025-05-09T19:18:20+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-06-30 12:00:00
Other_0000000000000010248_002 Inactive 2025-06-20T14:02:32+00:00 2025-06-20T09:00:00+00:00 2025-06-20T13:00:00+00:00
Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Foyers
T_FOYE-1
Other_0000000000000010248_001 Dismissed 2025-05-30T15:59:36+00:00 2025-06-20T09:00:00+00:00 2025-06-20T13:00:00+00:00
Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.