SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-11-24T15:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 3 4 5 6 7 >
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_004 Dismissed 2024-09-27T08:55:31+00:00 2023-11-10T12:44:00+00:00 2025-06-30T11:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_003 Dismissed 2024-06-21T14:22:29+00:00 2023-11-10T12:44:00+00:00 2025-03-31T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_002 Dismissed 2024-03-22T16:27:38+00:00 2023-11-10T12:44:00+00:00 2025-01-30T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_001 Dismissed 2023-11-10T15:42:44+00:00 2023-11-10T12:44:00+00:00 2024-12-31T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000009350_002 Dismissed 2024-08-22T14:45:18+00:00 2024-09-22T00:00:00+00:00 2024-09-22T00:00:01+00:00
This is a test publication following the automation of SSE REMIT admin app.
Other_0000000000000009350_001 Dismissed 2024-08-22T14:41:23+00:00 2024-09-22T00:00:00+00:00 2024-09-22T00:00:01+00:00
This is a test publication following the automation of SSE REMIT admin app.
Other_0000000000000009256_008 Inactive 2024-08-01T04:02:32+00:00 2024-07-31T00:00:00+00:00 2024-08-01T03:00:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_007 Dismissed 2024-07-31T21:10:48+00:00 2024-07-31T00:00:00+00:00 2024-08-01T03:00:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_006 Dismissed 2024-07-31T21:07:31+00:00 2024-07-31T00:00:00+00:00 2024-08-01T00:03:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_005 Dismissed 2024-07-30T15:59:06+00:00 2024-07-31T00:00:00+00:00 2024-07-31T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_004 Dismissed 2024-07-29T14:03:08+00:00 2024-08-01T00:00:00+00:00 2024-08-01T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_003 Dismissed 2024-07-28T16:25:13+00:00 2024-07-31T00:00:00+00:00 2024-08-01T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_002 Dismissed 2024-07-27T20:37:44+00:00 2024-07-29T00:00:00+00:00 2024-07-30T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_001 Dismissed 2024-07-18T16:02:07+00:00 2024-07-28T00:00:00+00:00 2024-07-29T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_002 Dismissed 2024-07-29T14:20:34+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_001 Dismissed 2024-07-26T12:31:36+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_002 Dismissed 2024-07-29T14:19:57+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_001 Dismissed 2024-07-26T12:31:39+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_005 Inactive 2024-07-23T10:47:32+00:00 2023-05-10T08:47:00+00:00 2024-07-23T09:40:00+00:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_004 Dismissed 2024-07-23T09:37:42+00:00 2023-05-10T08:47:00+00:00 2024-07-23T09:40:00+00:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_003 Dismissed 2023-08-04T18:05:35+00:00 2023-05-10T08:47:00+00:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_002 Dismissed 2023-08-04T17:37:40+00:00 2023-05-10T08:47:00+00:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_001 Dismissed 2023-05-10T08:49:10+00:00 2023-05-10T08:47:00+00:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
Other_0000000000000009232_003 Inactive 2024-07-08T22:02:32+00:00 2024-07-08T08:00:00+00:00 2024-07-08T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009232_002 Dismissed 2024-07-05T16:16:03+00:00 2024-07-08T08:00:00+00:00 2024-07-08T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009232_001 Dismissed 2024-07-05T14:44:07+00:00 2024-07-08T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009233_003 Dismissed 2024-07-08T21:43:03+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 370MW.
Other_0000000000000009233_002 Dismissed 2024-07-08T09:37:04+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 370MW.
Other_0000000000000009233_001 Dismissed 2024-07-05T16:18:45+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009202_002 Inactive 2024-07-03T19:02:32+00:00 2024-07-03T13:00:00+00:00 2024-07-03T18:00:00+00:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Other_0000000000000009202_001 Dismissed 2024-07-02T09:06:48+00:00 2024-07-03T13:00:00+00:00 2024-07-03T18:00:00+00:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_010 Inactive 2024-07-01T13:02:32+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_009 Dismissed 2024-05-21T12:12:29+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_008 Dismissed 2024-05-16T17:24:21+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_007 Dismissed 2024-04-14T22:58:55+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_006 Dismissed 2024-04-03T10:47:47+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_005 Dismissed 2024-03-07T14:58:39+00:00 2022-07-14T17:23:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_004 Dismissed 2024-02-13T16:06:55+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_003 Dismissed 2023-02-10T11:57:40+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking
48X000000000314Y
Other_0000000000000000039_002 Dismissed 2022-09-20T12:28:17+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking Wind Farm
Other_0000000000000000039_001 Dismissed 2022-07-14T17:25:58+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Other_0000000000000009046_003 Dismissed 2024-06-25T15:31:25+00:00 2024-04-27T23:00:00+00:00 2024-06-28T00:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009046_002 Dismissed 2024-05-17T08:50:18+00:00 2024-04-27T23:00:00+00:00 2024-06-28T00:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009046_001 Dismissed 2024-04-25T12:04:26+00:00 2024-04-27T23:00:00+00:00 2024-05-21T23:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009139_003 Inactive 2024-06-07T13:02:32+00:00 2024-06-06T00:00:00+00:00 2024-06-07T12:00:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009139_002 Dismissed 2024-06-06T17:30:33+00:00 2024-06-06T00:00:00+00:00 2024-06-07T12:00:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009139_001 Dismissed 2024-06-04T15:45:42+00:00 2024-06-06T00:00:00+00:00 2024-06-06T23:59:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009127_004 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Dismissed 2024-06-03T16:49:21+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.