Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | ||||||||||||||||||
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009530_003 | Dismissed | Planned | Production unavailability | 2024-10-18T17:30:46+01:00 | 2024-10-13T08:00:00+01:00 | 2024-10-18T19:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009530_002 | Dismissed | Planned | Production unavailability | 2024-10-18T14:41:38+01:00 | 2024-10-13T08:00:00+01:00 | 2024-10-18T18:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009530_001 | Dismissed | Planned | Production unavailability | 2024-10-09T10:15:40+01:00 | 2024-10-13T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_008 | Inactive | Planned | Production unavailability | 2024-10-18T18:02:32+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_007 | Dismissed | Planned | Production unavailability | 2024-10-11T14:00:34+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_007 | Inactive | Planned | Production unavailability | 2024-10-18T18:02:32+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_006 | Dismissed | Planned | Production unavailability | 2024-10-11T14:00:14+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_006 | Dismissed | Planned | Production unavailability | 2024-10-04T11:30:37+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-11T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_005 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_005 | Dismissed | Planned | Production unavailability | 2024-10-04T11:31:54+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-11T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_004 | Dismissed | Planned | Production unavailability | 2024-10-01T10:55:08+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_004 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:15+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:26+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:58:44+01:00 | 2024-09-20T23:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:59:06+01:00 | 2024-09-20T23:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:48:35+01:00 | 2024-09-20T20:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:49:52+01:00 | 2024-09-20T20:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009416_003 | Inactive | Planned | Production unavailability | 2024-10-18T17:02:32+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009413_003 | Inactive | Planned | Production unavailability | 2024-10-18T17:02:32+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009414_003 | Inactive | Planned | Production unavailability | 2024-10-18T17:02:32+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009415_003 | Inactive | Planned | Production unavailability | 2024-10-18T17:02:32+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009415_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:21:00+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009416_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:21:00+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009413_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:21:00+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009414_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:21:00+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009414_001 | Dismissed | Planned | Production unavailability | 2024-09-13T11:17:59+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009415_001 | Dismissed | Planned | Production unavailability | 2024-09-13T11:18:56+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009416_001 | Dismissed | Planned | Production unavailability | 2024-09-13T11:19:56+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009413_001 | Dismissed | Planned | Production unavailability | 2024-09-13T11:16:46+01:00 | 2024-10-15T08:00:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009552_004 | Inactive | Planned | Production unavailability | 2024-10-18T16:17:33+01:00 | 2024-10-17T16:15:00+01:00 | 2024-10-18T15:10:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009552_003 | Dismissed | Planned | Production unavailability | 2024-10-18T15:08:59+01:00 | 2024-10-17T16:15:00+01:00 | 2024-10-18T15:10:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009552_002 | Dismissed | Planned | Production unavailability | 2024-10-18T13:43:20+01:00 | 2024-10-17T16:15:00+01:00 | 2024-10-18T16:00:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009552_001 | Dismissed | Planned | Production unavailability | 2024-10-17T15:18:04+01:00 | 2024-10-17T16:15:00+01:00 | 2024-10-18T20:00:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009550_002 | Inactive | Planned | Production unavailability | 2024-10-17T17:17:32+01:00 | 2024-10-17T15:25:00+01:00 | 2024-10-17T16:15:00+01:00 | MW | 820 | 360 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009550_001 | Dismissed | Planned | Production unavailability | 2024-10-17T14:55:27+01:00 | 2024-10-17T15:25:00+01:00 | 2024-10-17T16:15:00+01:00 | MW | 820 | 360 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009549_004 | Inactive | Unplanned | Production unavailability | 2024-10-17T16:32:32+01:00 | 2024-10-17T13:00:00+01:00 | 2024-10-17T15:25:00+01:00 | MW | 900 | 280 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009549_003 | Dismissed | Unplanned | Production unavailability | 2024-10-17T14:16:00+01:00 | 2024-10-17T13:00:00+01:00 | 2024-10-17T15:25:00+01:00 | MW | 900 | 280 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009549_002 | Dismissed | Unplanned | Production unavailability | 2024-10-17T13:40:41+01:00 | 2024-10-17T13:00:00+01:00 | 2024-10-17T14:15:00+01:00 | MW | 1180 | 0 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009551_002 | Inactive | Unplanned | Production unavailability | 2024-10-17T16:32:32+01:00 | 2024-10-17T14:56:00+01:00 | 2024-10-17T15:25:00+01:00 | MW | 755 | 0 | 755 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009551_001 | Dismissed | Unplanned | Production unavailability | 2024-10-17T14:56:29+01:00 | 2024-10-17T14:56:00+01:00 | 2024-10-17T15:25:00+01:00 | MW | 755 | 0 | 755 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009549_001 | Dismissed | Unplanned | Production unavailability | 2024-10-17T13:05:23+01:00 | 2024-10-17T13:00:00+01:00 | 2024-10-17T13:45:00+01:00 | MW | 1180 | 0 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_008 | Active | Planned | Production unavailability | 2024-10-17T13:44:20+01:00 | 2024-08-27T08:00:00+01:00 | 2024-12-31T18:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_007 | Dismissed | Planned | Production unavailability | 2024-10-03T12:22:29+01:00 | 2024-08-27T08:00:00+01:00 | 2024-10-30T18:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_006 | Dismissed | Planned | Production unavailability | 2024-09-24T09:46:54+01:00 | 2024-08-27T08:00:00+01:00 | 2024-10-30T18:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_005 | Dismissed | Planned | Production unavailability | 2024-09-05T14:06:13+01:00 | 2024-08-27T08:00:00+01:00 | 2024-09-30T18:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_004 | Dismissed | Planned | Production unavailability | 2024-09-02T10:12:00+01:00 | 2024-08-27T08:00:00+01:00 | 2024-09-10T18:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_003 | Dismissed | Planned | Production unavailability | 2024-08-30T17:01:58+01:00 | 2024-08-27T08:00:00+01:00 | 2024-09-03T18:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Outage Overrun |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_002 | Dismissed | Planned | Production unavailability | 2024-08-20T18:07:36+01:00 | 2024-08-27T08:00:00+01:00 | 2024-08-31T08:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009326_001 | Dismissed | Planned | Production unavailability | 2024-08-06T17:27:13+01:00 | 2024-08-26T07:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |