This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2018-07-17T10:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003433_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2018-09-06T23:00:00+01:00 2018-09-10T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003430_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2019-07-12T00:00:00+01:00 2019-07-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003430_001 Dismissed Planned Production unavailability 2017-11-16T09:07:25+00:00 2019-07-12T00:00:00+01:00 2019-07-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003431_001 Dismissed Planned Production unavailability 2017-11-16T09:09:41+00:00 2019-10-12T00:00:00+01:00 2019-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003433_001 Dismissed Planned Production unavailability 2017-11-16T09:18:28+00:00 2018-09-06T23:00:00+01:00 2018-09-10T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003435_001 Dismissed Planned Production unavailability 2017-11-16T09:22:32+00:00 2018-12-06T23:00:00+00:00 2018-12-10T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003427_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2018-10-12T00:00:00+01:00 2018-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003427_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2018-10-12T00:00:00+01:00 2018-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003427_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2018-10-12T00:00:00+01:00 2018-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003427_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2018-10-12T00:00:00+01:00 2018-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003427_001 Dismissed Planned Production unavailability 2017-11-15T17:03:06+00:00 2018-10-12T00:00:00+01:00 2018-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_001 Dismissed Planned Production unavailability 2017-11-07T14:49:43+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_001 Dismissed Planned Production unavailability 2017-11-07T14:51:13+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_001 Dismissed Planned Production unavailability 2017-11-07T14:45:38+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_001 Dismissed Planned Production unavailability 2017-11-07T14:47:47+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_001 Dismissed Planned Production unavailability 2017-11-07T14:41:42+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_005 Active Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_001 Dismissed Planned Production unavailability 2017-11-07T14:32:16+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_001 Dismissed Planned Production unavailability 2017-11-07T14:36:16+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A