This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2020-05-29T10:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004273_001 Dismissed Planned Production unavailability 2019-05-23T14:30:29+01:00 2019-11-01T09:00:00+00:00 2020-05-08T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_010 Inactive Unplanned Production unavailability 2020-05-08T21:02:30+01:00 2020-05-08T16:30:00+01:00 2020-05-08T20:00:00+01:00 MW 280 900 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_009 Dismissed Unplanned Production unavailability 2020-05-08T19:31:44+01:00 2020-05-08T16:30:00+01:00 2020-05-08T20:00:00+01:00 MW 280 900 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_008 Dismissed Unplanned Production unavailability 2020-05-08T19:18:31+01:00 2020-05-08T16:30:00+01:00 2020-05-08T20:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_007 Dismissed Unplanned Production unavailability 2020-05-08T19:04:31+01:00 2020-05-08T16:30:00+01:00 2020-05-08T19:30:00+01:00 MW 530 650 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_006 Dismissed Unplanned Production unavailability 2020-05-08T18:57:05+01:00 2020-05-08T16:30:00+01:00 2020-05-08T19:30:00+01:00 MW 630 550 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_005 Dismissed Unplanned Production unavailability 2020-05-08T18:36:30+01:00 2020-05-08T16:30:00+01:00 2020-05-08T19:30:00+01:00 MW 730 450 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_004 Dismissed Unplanned Production unavailability 2020-05-08T17:41:32+01:00 2020-05-08T16:30:00+01:00 2020-05-08T18:30:00+01:00 MW 800 380 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_003 Dismissed Unplanned Production unavailability 2020-05-08T17:22:49+01:00 2020-05-08T16:30:00+01:00 2020-05-08T18:30:00+01:00 MW 930 250 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_002 Dismissed Unplanned Production unavailability 2020-05-08T17:09:33+01:00 2020-05-08T16:30:00+01:00 2020-05-08T18:30:00+01:00 MW 1050 130 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005144_001 Dismissed Unplanned Production unavailability 2020-05-08T16:33:42+01:00 2020-05-08T16:30:00+01:00 2020-05-08T17:30:00+01:00 MW 850 330 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005139_004 Inactive Planned Production unavailability 2020-05-08T16:02:33+01:00 2020-05-08T08:00:00+01:00 2020-05-08T15:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005139_003 Dismissed Planned Production unavailability 2020-05-08T14:01:48+01:00 2020-05-08T08:00:00+01:00 2020-05-08T15:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005143_003 Inactive Planned Production unavailability 2020-05-08T16:02:33+01:00 2020-05-08T08:00:00+01:00 2020-05-08T15:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005143_002 Dismissed Planned Production unavailability 2020-05-08T14:02:11+01:00 2020-05-08T08:00:00+01:00 2020-05-08T15:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005139_002 Dismissed Planned Production unavailability 2020-05-06T15:59:24+01:00 2020-05-08T08:00:00+01:00 2020-05-08T14:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005143_001 Dismissed Planned Production unavailability 2020-05-06T16:02:34+01:00 2020-05-08T08:00:00+01:00 2020-05-08T16:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005139_001 Dismissed Planned Production unavailability 2020-05-05T18:33:48+01:00 2020-05-07T08:00:00+01:00 2020-05-07T14:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005142_002 Inactive Planned Production unavailability 2020-05-07T17:02:32+01:00 2020-05-07T08:00:00+01:00 2020-05-07T16:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005142_001 Dismissed Planned Production unavailability 2020-05-06T16:00:41+01:00 2020-05-07T08:00:00+01:00 2020-05-07T16:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005141_002 Inactive Planned Production unavailability 2020-05-07T15:02:30+01:00 2020-05-07T08:00:00+01:00 2020-05-07T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005141_001 Dismissed Planned Production unavailability 2020-05-06T15:55:10+01:00 2020-05-07T08:00:00+01:00 2020-05-07T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005140_002 Dismissed Planned Production unavailability 2020-05-06T15:57:24+01:00 2020-05-07T08:00:00+01:00 2020-05-07T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005140_001 Dismissed Planned Production unavailability 2020-05-05T18:35:08+01:00 2020-05-07T08:00:00+01:00 2020-05-07T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005137_002 Dismissed Planned Production unavailability 2020-05-05T18:27:12+01:00 2020-05-06T08:00:00+01:00 2020-05-06T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005137_001 Dismissed Planned Production unavailability 2020-05-04T18:35:38+01:00 2020-05-06T08:00:00+01:00 2020-05-06T14:00:00+01:00 MW 126 0 126 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005138_002 Dismissed Planned Production unavailability 2020-05-05T18:26:50+01:00 2020-05-06T08:00:00+01:00 2020-05-06T14:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005138_001 Dismissed Planned Production unavailability 2020-05-04T18:37:24+01:00 2020-05-06T08:00:00+01:00 2020-05-06T14:00:00+01:00 MW 168 0 168 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005134_002 Inactive Planned Production unavailability 2020-05-02T21:02:33+01:00 2020-05-01T20:00:00+01:00 2020-05-02T20:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005135_002 Inactive Planned Consumption unavailability 2020-05-02T21:02:33+01:00 2020-05-01T20:00:00+01:00 2020-05-02T20:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005135_001 Dismissed Planned Consumption unavailability 2020-04-29T16:25:21+01:00 2020-05-01T20:00:00+01:00 2020-05-02T20:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005134_001 Dismissed Planned Production unavailability 2020-04-29T16:13:24+01:00 2020-05-01T20:00:00+01:00 2020-05-02T20:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
TB3 47W0000000000994
SSE Generation Ireland
47X0000000000592 0000000000000000000005131_004 Inactive Unplanned Production unavailability 2020-05-01T23:02:31+01:00 2020-04-28T15:00:00+01:00 2020-05-01T22:00:00+01:00 MW 241 0 241 Foreseen Maintenance
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland
47X0000000000592 0000000000000000000005131_003 Dismissed Unplanned Production unavailability 2020-05-01T16:06:13+01:00 2020-04-28T15:00:00+01:00 2020-05-01T22:00:00+01:00 MW 241 0 241 Foreseen Maintenance
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland
47X0000000000592 0000000000000000000005131_002 Dismissed Unplanned Production unavailability 2020-04-30T16:47:35+01:00 2020-04-28T15:00:00+01:00 2020-05-01T17:00:00+01:00 MW 241 0 241 Foreseen Maintenance
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland
47X0000000000592 0000000000000000000005131_001 Dismissed Unplanned Production unavailability 2020-04-28T15:14:11+01:00 2020-04-28T15:00:00+01:00 2020-04-30T17:00:00+01:00 MW 241 0 241 Foreseen Maintenance
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000005136_001 Active Planned Production unavailability 2020-05-01T09:07:51+01:00 2023-06-09T23:00:00+01:00 2023-06-27T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_007 Active Planned Production unavailability 2020-04-30T15:54:19+01:00 2021-06-04T00:01:00+01:00 2021-08-14T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_006 Dismissed Planned Production unavailability 2020-01-15T16:35:24+00:00 2021-04-15T23:00:00+01:00 2021-06-15T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_005 Dismissed Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_004 Dismissed Planned Production unavailability 2018-10-26T09:01:14+01:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_003 Dismissed Planned Production unavailability 2018-10-05T07:46:17+01:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_002 Dismissed Planned Production unavailability 2018-07-16T14:22:18+01:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_001 Dismissed Planned Production unavailability 2018-05-14T11:09:35+01:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_012 Active Planned Production unavailability 2020-04-30T15:51:17+01:00 2020-07-30T23:00:00+01:00 2020-08-23T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_011 Dismissed Planned Production unavailability 2020-01-15T16:34:12+00:00 2020-06-04T23:00:00+01:00 2020-06-28T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_010 Dismissed Planned Production unavailability 2019-12-24T15:05:18+00:00 2020-05-14T23:00:00+01:00 2020-07-31T00:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_009 Dismissed Planned Production unavailability 2019-01-25T14:03:35+00:00 2020-06-05T23:00:00+01:00 2020-07-19T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_008 Dismissed Planned Production unavailability 2018-10-26T09:01:14+01:00 2020-06-05T23:00:00+01:00 2020-07-19T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_007 Dismissed Planned Production unavailability 2018-10-05T07:46:17+01:00 2020-06-05T23:00:00+01:00 2020-07-19T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A