Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 2 3 4 5 6 >
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004564_002 Inactive Unplanned Production unavailability 2019-08-11T00:47:31+01:00 2019-08-10T23:30:00+01:00 2019-08-10T23:35:00+01:00 MW 500 255 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004564_001 Dismissed Unplanned Production unavailability 2019-08-10T23:31:05+01:00 2019-08-10T23:30:00+01:00 2019-08-10T23:35:00+01:00 MW 500 255 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004562_002 Dismissed Planned Production unavailability 2019-08-10T09:45:25+01:00 2019-08-09T23:00:00+01:00 2019-08-13T23:00:00+01:00 MW 1180 0 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004562_001 Dismissed Planned Production unavailability 2019-08-09T20:24:23+01:00 2019-08-09T23:00:00+01:00 2019-08-13T23:00:00+01:00 MW 1180 0 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_007 Inactive Planned Production unavailability 2019-08-10T00:02:31+01:00 2019-08-07T16:30:00+01:00 2019-08-09T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_006 Dismissed Planned Production unavailability 2019-08-09T20:23:22+01:00 2019-08-07T16:30:00+01:00 2019-08-09T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_005 Dismissed Planned Production unavailability 2019-08-07T16:45:01+01:00 2019-08-07T16:30:00+01:00 2019-08-16T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_004 Dismissed Planned Production unavailability 2019-08-07T16:36:37+01:00 2019-08-07T16:30:00+01:00 2019-08-11T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_003 Dismissed Planned Production unavailability 2019-08-07T13:40:58+01:00 2019-08-07T16:30:00+01:00 2019-08-08T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_002 Dismissed Planned Production unavailability 2019-08-07T09:57:37+01:00 2019-08-07T23:00:00+01:00 2019-08-08T23:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004542_001 Dismissed Planned Production unavailability 2019-08-05T16:50:45+01:00 2019-08-09T08:00:00+01:00 2019-08-10T22:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_007 Inactive Planned Production unavailability 2019-08-09T21:02:31+01:00 2019-08-05T14:00:00+01:00 2019-08-09T19:49:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_006 Dismissed Planned Production unavailability 2019-08-09T19:48:16+01:00 2019-08-05T14:00:00+01:00 2019-08-09T19:49:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_005 Dismissed Planned Production unavailability 2019-08-09T16:11:04+01:00 2019-08-05T14:00:00+01:00 2019-08-10T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_004 Dismissed Planned Production unavailability 2019-08-05T04:46:22+01:00 2019-08-05T14:00:00+01:00 2019-08-09T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_003 Dismissed Planned Production unavailability 2019-07-31T17:02:39+01:00 2019-08-05T17:00:00+01:00 2019-08-09T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_002 Dismissed Planned Production unavailability 2019-07-31T09:46:23+01:00 2019-08-05T00:00:00+01:00 2019-08-09T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000004289_001 Dismissed Planned Production unavailability 2019-05-31T13:06:43+01:00 2019-08-06T08:30:00+01:00 2019-08-09T16:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004554_003 Inactive Planned Production unavailability 2019-08-09T13:17:31+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004555_003 Inactive Planned Consumption unavailability 2019-08-09T13:17:31+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004552_003 Inactive Planned Production unavailability 2019-08-09T13:17:31+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004553_003 Inactive Planned Consumption unavailability 2019-08-09T13:17:31+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004553_002 Dismissed Planned Consumption unavailability 2019-08-09T12:15:23+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004554_002 Dismissed Planned Production unavailability 2019-08-09T12:15:41+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004552_002 Dismissed Planned Production unavailability 2019-08-09T12:15:59+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:16:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004555_002 Dismissed Planned Consumption unavailability 2019-08-09T12:14:32+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004555_001 Dismissed Planned Consumption unavailability 2019-08-08T12:40:13+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004554_001 Dismissed Planned Production unavailability 2019-08-08T12:39:16+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004553_001 Dismissed Planned Consumption unavailability 2019-08-08T12:38:24+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004552_001 Dismissed Planned Production unavailability 2019-08-08T12:37:30+01:00 2019-08-09T11:00:00+01:00 2019-08-09T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004551_005 Inactive Unplanned Production unavailability 2019-08-09T01:02:31+01:00 2019-08-08T06:02:00+01:00 2019-08-08T23:59:00+01:00 MW 340 370 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004551_004 Dismissed Unplanned Production unavailability 2019-08-08T15:33:35+01:00 2019-08-08T06:02:00+01:00 2019-08-08T23:59:00+01:00 MW 340 370 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004551_003 Dismissed Unplanned Production unavailability 2019-08-08T09:57:28+01:00 2019-08-08T06:02:00+01:00 2019-08-10T23:59:00+01:00 MW 340 370 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004551_002 Dismissed Unplanned Production unavailability 2019-08-08T07:22:28+01:00 2019-08-08T06:02:00+01:00 2019-08-08T23:59:00+01:00 MW 340 370 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004551_001 Dismissed Unplanned Production unavailability 2019-08-08T06:02:49+01:00 2019-08-08T06:02:00+01:00 2019-08-08T10:00:00+01:00 MW 340 370 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004557_002 Inactive Unplanned Production unavailability 2019-08-09T00:02:31+01:00 2019-08-08T17:25:00+01:00 2019-08-08T23:00:00+01:00 MW 1180 0 1180 Failure
Plant Fault - Control System
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000004557_001 Dismissed Unplanned Production unavailability 2019-08-08T17:25:54+01:00 2019-08-08T17:25:00+01:00 2019-08-08T23:00:00+01:00 MW 1180 0 1180 Failure
Plant Fault - Control System
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_006 Inactive Unplanned Consumption unavailability 2019-08-08T07:17:31+01:00 2019-08-07T17:03:00+01:00 2019-08-08T06:04:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_005 Dismissed Unplanned Consumption unavailability 2019-08-08T06:03:32+01:00 2019-08-07T17:03:00+01:00 2019-08-08T06:04:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004549_004 Inactive Unplanned Consumption unavailability 2019-08-08T07:17:31+01:00 2019-08-07T17:07:00+01:00 2019-08-08T06:05:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_004 Dismissed Unplanned Consumption unavailability 2019-08-07T20:08:32+01:00 2019-08-07T17:03:00+01:00 2019-08-08T12:00:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004549_003 Dismissed Unplanned Consumption unavailability 2019-08-08T06:04:08+01:00 2019-08-07T17:07:00+01:00 2019-08-08T06:05:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_003 Dismissed Unplanned Consumption unavailability 2019-08-07T17:05:56+01:00 2019-08-07T17:03:00+01:00 2019-08-07T21:00:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_002 Dismissed Unplanned Consumption unavailability 2019-08-07T17:05:30+01:00 2019-08-07T17:03:00+01:00 2019-08-07T19:00:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004549_002 Dismissed Unplanned Consumption unavailability 2019-08-07T20:08:09+01:00 2019-08-07T17:07:00+01:00 2019-08-08T12:00:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004547_001 Dismissed Unplanned Consumption unavailability 2019-08-07T17:04:00+01:00 2019-08-07T17:03:00+01:00 2019-08-07T19:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Weather
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004549_001 Dismissed Unplanned Consumption unavailability 2019-08-07T17:08:19+01:00 2019-08-07T17:07:00+01:00 2019-08-07T21:00:00+01:00 MW 150 0 150 Shutdown
Weather
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004550_003 Inactive Unplanned Production unavailability 2019-08-08T01:17:31+01:00 2019-08-07T20:16:00+01:00 2019-08-08T00:10:00+01:00 MW 340 370 710 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004550_002 Dismissed Unplanned Production unavailability 2019-08-07T21:50:30+01:00 2019-08-07T20:16:00+01:00 2019-08-08T00:10:00+01:00 MW 340 370 710 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004550_001 Dismissed Unplanned Production unavailability 2019-08-07T20:17:20+01:00 2019-08-07T20:16:00+01:00 2019-08-07T23:20:00+01:00 MW 340 370 710 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A