Last update at: 2023-09-25T01:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | ||||||||||||||||||
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_004 | Dismissed | Planned | Consumption unavailability | 2022-09-15T14:26:05+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T15:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_003 | Dismissed | Planned | Consumption unavailability | 2022-09-13T14:06:13+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-13T15:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_002 | Dismissed | Planned | Consumption unavailability | 2022-09-13T14:00:45+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-13T15:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_001 | Dismissed | Planned | Consumption unavailability | 2022-08-23T14:02:24+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T16:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_006 | Active | Planned | Production unavailability | 2023-09-18T23:10:45+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-27T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_005 | Dismissed | Planned | Production unavailability | 2023-09-14T15:40:24+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-20T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_004 | Dismissed | Planned | Production unavailability | 2023-09-14T12:35:50+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_003 | Dismissed | Planned | Production unavailability | 2022-09-15T14:26:37+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T15:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_002 | Dismissed | Planned | Production unavailability | 2022-09-13T14:03:06+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-13T15:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_001 | Dismissed | Planned | Production unavailability | 2022-08-23T14:01:21+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T16:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008391_002 | Dismissed | Planned | Production unavailability | 2023-09-16T23:37:39+01:00 | 2023-09-12T06:00:00+01:00 | 2023-09-21T20:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008391_001 | Dismissed | Planned | Production unavailability | 2023-09-07T10:27:23+01:00 | 2023-09-12T06:00:00+01:00 | 2023-09-21T20:00:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008423_002 | Inactive | Unplanned | Production unavailability | 2023-09-15T18:02:32+01:00 | 2023-09-15T16:20:00+01:00 | 2023-09-15T16:50:00+01:00 | MW | 530 | 225 | 755 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008423_001 | Dismissed | Unplanned | Production unavailability | 2023-09-15T16:31:00+01:00 | 2023-09-15T16:20:00+01:00 | 2023-09-15T16:50:00+01:00 | MW | 530 | 225 | 755 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008422_002 | Inactive | Planned | Production unavailability | 2023-09-15T17:17:32+01:00 | 2023-09-15T15:50:00+01:00 | 2023-09-15T16:10:00+01:00 | MW | 621 | 134 | 755 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008422_001 | Dismissed | Planned | Production unavailability | 2023-09-15T15:59:57+01:00 | 2023-09-15T15:50:00+01:00 | 2023-09-15T16:10:00+01:00 | MW | 621 | 134 | 755 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:37:19+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:30:23+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 180 | 120 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:35:54+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 136 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 136 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:29:00+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 138 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:34:54+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 40 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 40 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:27:37+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 100 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:35+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:54:18+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_002 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:18+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:59:51+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:03+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:48:14+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:24:56+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:44:02+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008413_002 | Active | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008413_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:46:16+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_002 | Active | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 138 | 0 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:50:03+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_002 | Active | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:56:38+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_001 | Active | Planned | Production unavailability | 2023-09-15T13:02:36+01:00 | 2023-10-02T08:01:00+01:00 | 2023-10-05T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_001 | Active | Planned | Production unavailability | 2023-09-15T12:41:24+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_001 | Active | Planned | Production unavailability | 2023-09-15T12:39:29+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:45+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:26:09+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:21:41+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:35+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:25:39+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |