Last update at: 2024-10-25T20:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_007 Inactive Planned Production unavailability 2024-10-25T20:02:33+01:00 2024-10-22T08:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_007 Inactive Planned Production unavailability 2024-10-25T20:02:33+01:00 2024-10-22T08:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_006 Dismissed Planned Production unavailability 2024-10-18T08:56:44+01:00 2024-10-22T08:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_006 Dismissed Planned Production unavailability 2024-10-18T08:56:18+01:00 2024-10-22T08:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_005 Dismissed Planned Production unavailability 2024-10-09T09:04:22+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_005 Dismissed Planned Production unavailability 2024-10-09T09:04:22+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_004 Dismissed Planned Production unavailability 2024-10-07T10:51:38+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_004 Dismissed Planned Production unavailability 2024-10-07T10:52:07+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_003 Dismissed Planned Production unavailability 2024-10-03T12:23:19+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_003 Dismissed Planned Production unavailability 2024-10-03T12:23:19+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_002 Dismissed Planned Production unavailability 2024-09-20T10:44:30+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_002 Dismissed Planned Production unavailability 2024-09-20T10:45:06+01:00 2024-11-11T07:00:00+00:00 2024-11-14T19:00:00+00:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009445_001 Dismissed Planned Production unavailability 2024-09-19T14:31:01+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 80 0 80 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009444_001 Dismissed Planned Production unavailability 2024-09-19T14:30:06+01:00 2024-10-22T07:00:00+01:00 2024-10-25T19:00:00+01:00 MW 300 0 300 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009563_002 Dismissed Planned Production unavailability 2024-10-25T14:01:33+01:00 2024-10-25T15:00:00+01:00 2024-10-25T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009563_001 Dismissed Planned Production unavailability 2024-10-25T09:51:31+01:00 2024-10-25T15:00:00+01:00 2024-10-25T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009564_002 Dismissed Planned Production unavailability 2024-10-25T14:00:29+01:00 2024-10-25T15:00:00+01:00 2024-10-25T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009564_001 Dismissed Planned Production unavailability 2024-10-25T09:55:32+01:00 2024-10-25T15:00:00+01:00 2024-10-25T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009561_005 Inactive Planned Consumption unavailability 2024-10-25T11:02:32+01:00 2024-10-24T06:20:00+01:00 2024-10-25T10:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009561_004 Dismissed Planned Consumption unavailability 2024-10-24T20:02:46+01:00 2024-10-24T06:20:00+01:00 2024-10-25T10:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009561_003 Dismissed Planned Consumption unavailability 2024-10-24T18:17:02+01:00 2024-10-24T06:20:00+01:00 2024-10-24T23:59:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009561_002 Dismissed Planned Consumption unavailability 2024-10-24T14:09:47+01:00 2024-10-24T06:20:00+01:00 2024-10-24T20:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009561_001 Dismissed Planned Consumption unavailability 2024-10-24T06:06:38+01:00 2024-10-24T06:20:00+01:00 2024-10-24T15:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_002 Active Planned Production unavailability 2024-10-25T10:58:49+01:00 2024-10-18T12:21:00+01:00 2024-11-01T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_001 Dismissed Planned Production unavailability 2024-10-22T12:15:12+01:00 2024-10-18T12:21:00+01:00 2024-10-25T17:00:00+01:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_002 Active Planned Production unavailability 2024-10-25T10:58:20+01:00 2024-10-18T12:18:00+01:00 2024-11-01T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_001 Dismissed Planned Production unavailability 2024-10-22T12:16:33+01:00 2024-10-18T12:18:00+01:00 2024-10-25T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009566_001 Active Planned Production unavailability 2024-10-25T10:06:27+01:00 2024-10-28T15:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009565_001 Active Planned Production unavailability 2024-10-25T10:00:50+01:00 2024-10-28T15:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009562_005 Inactive Planned Consumption unavailability 2024-10-25T07:02:32+01:00 2024-10-24T06:20:00+01:00 2024-10-25T06:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009562_004 Dismissed Planned Consumption unavailability 2024-10-24T22:59:02+01:00 2024-10-24T06:20:00+01:00 2024-10-25T06:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009562_003 Dismissed Planned Consumption unavailability 2024-10-24T18:16:30+01:00 2024-10-24T06:20:00+01:00 2024-10-24T23:59:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009562_002 Dismissed Planned Consumption unavailability 2024-10-24T14:09:12+01:00 2024-10-24T06:20:00+01:00 2024-10-24T20:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009562_001 Dismissed Planned Consumption unavailability 2024-10-24T06:07:47+01:00 2024-10-24T06:20:00+01:00 2024-10-24T15:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000009557_003 Inactive Planned Production unavailability 2024-10-24T23:47:32+01:00 2024-10-23T23:59:00+01:00 2024-10-24T22:45:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000009557_002 Dismissed Planned Production unavailability 2024-10-24T22:32:12+01:00 2024-10-23T23:59:00+01:00 2024-10-24T22:45:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000009557_001 Dismissed Planned Production unavailability 2024-10-21T12:52:02+01:00 2024-10-23T23:59:00+01:00 2024-10-24T23:59:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_008 Inactive Planned Consumption unavailability 2024-10-23T15:32:32+01:00 2024-10-20T16:00:00+01:00 2024-10-23T14:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_007 Dismissed Planned Consumption unavailability 2024-10-23T14:19:32+01:00 2024-10-20T16:00:00+01:00 2024-10-23T14:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_006 Dismissed Planned Consumption unavailability 2024-10-23T10:37:27+01:00 2024-10-20T16:00:00+01:00 2024-10-23T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_005 Dismissed Planned Consumption unavailability 2024-10-22T21:53:55+01:00 2024-10-20T16:00:00+01:00 2024-10-23T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_004 Dismissed Planned Consumption unavailability 2024-10-22T09:55:31+01:00 2024-10-20T16:00:00+01:00 2024-10-22T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_003 Dismissed Planned Consumption unavailability 2024-10-21T21:38:58+01:00 2024-10-20T16:00:00+01:00 2024-10-22T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_002 Dismissed Planned Consumption unavailability 2024-10-21T16:43:02+01:00 2024-10-20T16:00:00+01:00 2024-10-21T22:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009555_001 Dismissed Planned Consumption unavailability 2024-10-20T14:42:47+01:00 2024-10-20T16:00:00+01:00 2024-10-21T17:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009556_009 Inactive Planned Consumption unavailability 2024-10-23T13:32:32+01:00 2024-10-20T16:10:00+01:00 2024-10-23T12:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009556_008 Dismissed Planned Consumption unavailability 2024-10-23T12:00:17+01:00 2024-10-20T16:10:00+01:00 2024-10-23T12:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009556_007 Dismissed Planned Consumption unavailability 2024-10-23T10:34:28+01:00 2024-10-20T16:10:00+01:00 2024-10-23T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009556_006 Dismissed Planned Consumption unavailability 2024-10-22T21:54:15+01:00 2024-10-20T16:10:00+01:00 2024-10-23T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009556_005 Dismissed Planned Consumption unavailability 2024-10-22T09:54:37+01:00 2024-10-20T16:10:00+01:00 2024-10-22T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A