Last update at: 2026-06-12T11:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 3 4 5 6 7 > | ||||||||||||||||||
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010844_001 | Dismissed | Planned | Production unavailability | 2026-02-13T14:55:18+00:00 | 2027-01-26T09:00:00+00:00 | 2027-01-26T16:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010843_002 | Active | Planned | Production unavailability | 2026-05-07T15:20:04+01:00 | 2026-10-27T09:00:00+00:00 | 2026-10-27T16:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010843_001 | Dismissed | Planned | Production unavailability | 2026-02-13T14:53:57+00:00 | 2026-10-27T09:00:00+00:00 | 2026-10-27T16:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010813_002 | Active | Planned | Production unavailability | 2026-05-07T15:19:39+01:00 | 2026-09-14T09:00:00+01:00 | 2026-09-18T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Grid |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010813_001 | Dismissed | Planned | Production unavailability | 2026-01-22T13:35:39+00:00 | 2026-09-14T09:00:00+01:00 | 2026-09-18T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Grid |
Hydro Water Reservoir | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010829_002 | Active | Planned | Production unavailability | 2026-05-07T14:55:42+01:00 | 2026-08-16T20:00:00+01:00 | 2026-09-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010829_001 | Dismissed | Planned | Production unavailability | 2026-01-29T15:08:04+00:00 | 2026-08-16T20:00:00+01:00 | 2026-09-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010830_002 | Active | Planned | Consumption unavailability | 2026-05-07T14:54:52+01:00 | 2026-08-16T20:00:00+01:00 | 2026-09-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010830_001 | Dismissed | Planned | Consumption unavailability | 2026-01-29T15:09:18+00:00 | 2026-08-16T20:00:00+01:00 | 2026-09-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010827_002 | Active | Planned | Production unavailability | 2026-05-07T14:53:48+01:00 | 2026-08-10T08:00:00+01:00 | 2026-09-21T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010827_001 | Dismissed | Planned | Production unavailability | 2026-01-29T15:05:22+00:00 | 2026-08-10T08:00:00+01:00 | 2026-09-21T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010828_002 | Active | Planned | Consumption unavailability | 2026-05-07T14:50:41+01:00 | 2026-08-10T08:00:00+01:00 | 2026-09-21T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010828_001 | Dismissed | Planned | Consumption unavailability | 2026-01-29T15:06:41+00:00 | 2026-08-10T08:00:00+01:00 | 2026-09-21T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010950_002 | Active | Unplanned | Production unavailability | 2026-05-03T13:26:59+01:00 | 2026-05-03T10:40:43+01:00 | 2026-05-03T14:30:53+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010950_001 | Dismissed | Unplanned | Production unavailability | 2026-05-03T10:40:41+01:00 | 2026-05-03T10:40:43+01:00 | 2026-05-03T15:00:53+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010949_002 | Active | Unplanned | Production unavailability | 2026-05-03T13:26:39+01:00 | 2026-05-03T10:40:00+01:00 | 2026-05-03T14:30:15+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010949_001 | Dismissed | Unplanned | Production unavailability | 2026-05-03T10:39:21+01:00 | 2026-05-03T10:40:00+01:00 | 2026-05-03T15:00:15+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010948_003 | Active | Unplanned | Production unavailability | 2026-05-03T07:35:55+01:00 | 2026-05-03T06:04:59+01:00 | 2026-05-03T08:40:02+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010948_002 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:28:50+01:00 | 2026-05-03T06:04:59+01:00 | 2026-05-03T13:59:02+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010948_001 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:05:41+01:00 | 2026-05-03T07:04:59+01:00 | 2026-05-03T13:59:02+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010947_003 | Active | Unplanned | Production unavailability | 2026-05-03T07:35:36+01:00 | 2026-05-03T06:03:29+01:00 | 2026-05-03T08:40:32+01:00 | MW | 140 | 0 | 140 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010947_002 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:29:13+01:00 | 2026-05-03T06:03:29+01:00 | 2026-05-03T13:59:32+01:00 | MW | 140 | 0 | 140 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010947_001 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:04:17+01:00 | 2026-05-03T07:03:29+01:00 | 2026-05-03T13:59:32+01:00 | MW | 140 | 0 | 140 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010946_003 | Active | Unplanned | Production unavailability | 2026-05-03T07:33:47+01:00 | 2026-05-03T06:00:12+01:00 | 2026-05-03T08:40:17+01:00 | MW | 160 | 0 | 160 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010946_002 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:28:33+01:00 | 2026-05-03T06:00:12+01:00 | 2026-05-03T13:59:17+01:00 | MW | 160 | 0 | 160 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010946_001 | Dismissed | Unplanned | Production unavailability | 2026-05-03T06:02:30+01:00 | 2026-05-03T07:00:12+01:00 | 2026-05-03T13:59:17+01:00 | MW | 160 | 0 | 160 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010945_002 | Active | Planned | Consumption unavailability | 2026-05-01T08:11:30+01:00 | 2026-05-01T02:00:47+01:00 | 2026-05-01T09:15:01+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010945_001 | Dismissed | Planned | Consumption unavailability | 2026-05-01T00:39:53+01:00 | 2026-05-01T02:00:47+01:00 | 2026-05-01T12:00:01+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010944_002 | Active | Planned | Production unavailability | 2026-04-30T05:57:35+01:00 | 2026-04-29T20:30:43+01:00 | 2026-04-30T07:00:52+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010944_001 | Dismissed | Planned | Production unavailability | 2026-04-29T18:40:36+01:00 | 2026-04-29T20:30:43+01:00 | 2026-04-30T12:00:52+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010943_004 | Active | Planned | Production unavailability | 2026-04-29T22:13:13+01:00 | 2026-04-29T18:12:00+01:00 | 2026-04-29T23:15:00+01:00 | MW | 60 | 41 | 101 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010943_003 | Dismissed | Planned | Production unavailability | 2026-04-29T22:11:20+01:00 | 2026-04-29T18:12:00+01:00 | 2026-04-29T23:15:00+01:00 | MW | 0 | 101 | 101 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010943_002 | Dismissed | Planned | Production unavailability | 2026-04-29T17:13:05+01:00 | 2026-04-29T18:12:00+01:00 | 2026-04-30T16:00:00+01:00 | MW | 62 | 39 | 101 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010943_001 | Dismissed | Planned | Production unavailability | 2026-04-29T17:12:19+01:00 | 2026-04-29T18:13:11+01:00 | 2026-04-30T16:00:00+01:00 | MW | 62 | 39 | 101 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010907_002 | Active | Planned | Production unavailability | 2026-04-29T17:11:19+01:00 | 2026-04-27T08:00:00+01:00 | 2026-04-29T18:12:00+01:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010907_001 | Dismissed | Planned | Production unavailability | 2026-03-31T11:21:27+01:00 | 2026-04-27T08:00:00+01:00 | 2026-04-30T16:00:00+01:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010942_002 | Active | Planned | Production unavailability | 2026-04-29T09:34:24+01:00 | 2026-04-29T06:05:15+01:00 | 2026-04-29T16:00:32+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010942_001 | Dismissed | Planned | Production unavailability | 2026-04-29T05:02:34+01:00 | 2026-04-29T06:05:15+01:00 | 2026-04-29T12:00:32+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010941_001 | Active | Planned | Production unavailability | 2026-04-28T15:46:53+01:00 | 2026-05-26T09:00:00+01:00 | 2026-05-27T17:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010940_001 | Active | Planned | Production unavailability | 2026-04-28T15:45:34+01:00 | 2026-05-25T09:00:00+01:00 | 2026-05-29T13:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010896_002 | Dismissed | Planned | Production unavailability | 2026-04-27T11:41:09+01:00 | 2026-04-28T09:00:00+01:00 | 2026-04-28T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000010896_001 | Dismissed | Planned | Production unavailability | 2026-03-25T14:04:54+00:00 | 2026-04-28T09:00:00+01:00 | 2026-04-28T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010938_001 | Active | Planned | Production unavailability | 2026-04-23T20:13:08+01:00 | 2026-04-23T21:30:38+01:00 | 2026-04-24T13:00:50+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FERRB-2 | 48W00000FERRB-2T | SSE Battery Salisbury Limited |
48X0000000000319 | 0000000000000000000010937_002 | Dismissed | Planned | Consumption unavailability | 2026-04-23T15:12:25+01:00 | 2026-04-23T16:00:00+01:00 | 2026-04-23T16:15:00+01:00 | MW | 75 | 0 | 75 | Foreseen Maintenance | Testing |
Other | 10YGB----------A |
| T_FERRB-2 | 48W00000FERRB-2T | SSE Battery Salisbury Limited |
48X0000000000319 | 0000000000000000000010937_001 | Dismissed | Planned | Consumption unavailability | 2026-04-23T15:09:22+01:00 | 2026-04-23T16:00:00+01:00 | 2026-04-23T16:15:00+01:00 | MW | 75 | 0 | 75 | Foreseen Maintenance | Testing |
Other | 10YGB----------A |
| T_FERRB-1 | 48W00000FERRB-1V | SSE Battery Salisbury Limited |
48X0000000000319 | 0000000000000000000010936_002 | Dismissed | Planned | Consumption unavailability | 2026-04-23T14:56:20+01:00 | 2026-04-23T16:00:00+01:00 | 2026-04-23T16:15:00+01:00 | MW | 75 | 0 | 75 | Foreseen Maintenance | Testing |
Other | 10YGB----------A |
| T_FERRB-1 | 48W00000FERRB-1V | SSE Battery Salisbury Limited |
48X0000000000319 | 0000000000000000000010936_001 | Dismissed | Planned | Consumption unavailability | 2026-04-23T14:53:29+01:00 | 2026-04-23T16:00:00+01:00 | 2026-04-23T16:15:00+01:00 | MW | 75 | 0 | 75 | Foreseen Maintenance | Testing |
Other | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010934_001 | Active | Planned | Production unavailability | 2026-04-23T08:26:00+01:00 | 2026-04-23T09:30:00+01:00 | 2026-04-23T16:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000010658_003 | Active | Planned | Production unavailability | 2026-04-20T10:46:11+01:00 | 2026-05-11T10:00:00+01:00 | 2026-05-11T11:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000010658_002 | Dismissed | Planned | Production unavailability | 2025-11-03T10:59:03+00:00 | 2026-05-11T08:00:00+01:00 | 2026-05-15T16:01:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |