Last update at: 2025-12-16T17:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 29 30 31 32 33 > | ||||||||||||||||||
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_003 | Dismissed | Planned | Production unavailability | 2025-05-23T11:01:18+00:00 | 2025-05-09T12:00:40+00:00 | 2025-06-03T17:00:24+00:00 | MW | 156 | 156 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_002 | Dismissed | Planned | Production unavailability | 2025-05-16T10:48:21+00:00 | 2025-05-09T12:00:40+00:00 | 2025-05-27T12:25:24+00:00 | MW | 182 | 130 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_001 | Dismissed | Planned | Production unavailability | 2025-05-09T12:26:18+00:00 | 2025-05-09T12:00:40+00:00 | 2025-05-19T12:25:24+00:00 | MW | 185 | 127 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010179_002 | Inactive | Unplanned | Production unavailability | 2025-05-26T22:32:32+00:00 | 2025-05-26T20:15:34+00:00 | 2025-05-26T21:30:50+00:00 | MW | 140 | 0 | 140 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010180_002 | Inactive | Unplanned | Production unavailability | 2025-05-26T22:32:32+00:00 | 2025-05-26T20:15:57+00:00 | 2025-05-26T21:30:02+00:00 | MW | 258 | 100 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010179_001 | Dismissed | Unplanned | Production unavailability | 2025-05-26T20:32:37+00:00 | 2025-05-26T20:15:34+00:00 | 2025-05-26T21:30:50+00:00 | MW | 140 | 0 | 140 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000010180_001 | Dismissed | Unplanned | Production unavailability | 2025-05-26T20:33:26+00:00 | 2025-05-26T20:15:57+00:00 | 2025-05-26T21:30:02+00:00 | MW | 258 | 100 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000010104_003 | Inactive | Planned | Production unavailability | 2025-05-24T19:02:32+00:00 | 2025-05-19T08:30:00+00:00 | 2025-05-24T18:00:00+00:00 | MW | 74 | 0 | 74 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000010104_002 | Dismissed | Planned | Production unavailability | 2025-05-23T18:29:36+00:00 | 2025-05-19T08:30:00+00:00 | 2025-05-24T18:00:00+00:00 | MW | 74 | 0 | 74 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000010104_001 | Dismissed | Planned | Production unavailability | 2025-04-30T10:58:48+00:00 | 2025-05-19T08:30:00+00:00 | 2025-05-24T17:00:39+00:00 | MW | 74 | 0 | 74 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010155_002 | Dismissed | Planned | Production unavailability | 2025-05-23T15:48:36+00:00 | 2025-06-05T06:00:19+00:00 | 2025-06-05T18:00:45+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010155_001 | Dismissed | Planned | Production unavailability | 2025-05-16T10:47:20+00:00 | 2025-06-05T06:00:19+00:00 | 2025-06-05T18:00:45+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010156_002 | Dismissed | Planned | Consumption unavailability | 2025-05-23T15:47:33+00:00 | 2025-06-05T06:00:13+00:00 | 2025-06-05T18:00:39+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010156_001 | Dismissed | Planned | Consumption unavailability | 2025-05-16T10:50:29+00:00 | 2025-06-05T06:00:13+00:00 | 2025-06-05T18:00:39+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_004 | Dismissed | Planned | Production unavailability | 2025-05-23T15:23:14+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_003 | Dismissed | Planned | Production unavailability | 2025-05-16T12:03:51+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_002 | Dismissed | Planned | Production unavailability | 2025-03-27T14:32:21+00:00 | 2025-06-04T08:00:00+00:00 | 2025-06-04T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_001 | Dismissed | Planned | Production unavailability | 2025-03-27T14:27:18+00:00 | 2025-06-04T08:00:00+00:00 | 2025-06-04T12:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010023_003 | Dismissed | Planned | Consumption unavailability | 2025-05-23T15:22:50+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010023_002 | Dismissed | Planned | Consumption unavailability | 2025-05-16T12:05:02+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010023_001 | Dismissed | Planned | Consumption unavailability | 2025-03-27T14:31:02+00:00 | 2025-06-04T08:00:00+00:00 | 2025-06-04T12:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009923_003 | Inactive | Planned | Production unavailability | 2025-05-21T14:02:31+00:00 | 2025-05-21T09:00:00+00:00 | 2025-05-21T13:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009923_002 | Dismissed | Planned | Production unavailability | 2025-02-24T15:11:49+00:00 | 2025-05-21T09:00:00+00:00 | 2025-05-21T13:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009923_001 | Dismissed | Planned | Production unavailability | 2025-02-24T15:08:12+00:00 | 2025-05-21T09:00:00+00:00 | 2025-05-21T13:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010167_004 | Inactive | Unplanned | Production unavailability | 2025-05-21T13:17:31+00:00 | 2025-05-19T18:05:57+00:00 | 2025-05-21T12:05:06+00:00 | MW | 101 | 0 | 101 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010167_003 | Dismissed | Unplanned | Production unavailability | 2025-05-21T12:04:18+00:00 | 2025-05-19T18:05:57+00:00 | 2025-05-21T12:05:06+00:00 | MW | 101 | 0 | 101 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010167_002 | Dismissed | Unplanned | Production unavailability | 2025-05-20T16:18:24+00:00 | 2025-05-19T18:05:57+00:00 | 2025-05-21T17:00:06+00:00 | MW | 101 | 0 | 101 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010167_001 | Dismissed | Unplanned | Production unavailability | 2025-05-19T18:07:19+00:00 | 2025-05-19T18:05:57+00:00 | 2025-05-20T17:00:06+00:00 | MW | 101 | 0 | 101 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010146_002 | Dismissed | Planned | Production unavailability | 2025-05-20T10:32:30+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010146_001 | Dismissed | Planned | Production unavailability | 2025-05-13T09:57:19+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010147_002 | Dismissed | Planned | Production unavailability | 2025-05-20T10:32:08+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010147_001 | Dismissed | Planned | Production unavailability | 2025-05-13T09:58:39+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010148_002 | Dismissed | Planned | Production unavailability | 2025-05-20T10:31:12+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000010148_001 | Dismissed | Planned | Production unavailability | 2025-05-13T09:59:52+00:00 | 2025-07-21T08:00:00+00:00 | 2025-07-21T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009828_003 | Inactive | Planned | Production unavailability | 2025-05-14T14:02:32+00:00 | 2025-05-14T09:00:00+00:00 | 2025-05-14T13:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009828_002 | Dismissed | Planned | Production unavailability | 2025-01-22T14:28:05+00:00 | 2025-05-14T09:00:00+00:00 | 2025-05-14T13:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009828_001 | Dismissed | Planned | Production unavailability | 2025-01-22T14:24:27+00:00 | 2025-05-14T10:00:00+00:00 | 2025-05-14T12:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_028 | Inactive | Planned | Production unavailability | 2025-05-13T18:02:32+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-13T17:00:00+00:00 | MW | 185 | 117 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_028 | Inactive | Planned | Production unavailability | 2025-05-13T18:02:32+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-13T17:00:00+00:00 | MW | 26 | 130 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_027 | Dismissed | Planned | Production unavailability | 2025-05-02T10:40:55+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-13T17:00:00+00:00 | MW | 26 | 130 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_027 | Dismissed | Planned | Production unavailability | 2025-05-02T10:40:43+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-13T17:00:00+00:00 | MW | 185 | 117 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_026 | Dismissed | Planned | Production unavailability | 2025-04-25T11:03:07+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-06T17:00:00+00:00 | MW | 185 | 117 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_026 | Dismissed | Planned | Production unavailability | 2025-04-25T11:02:45+00:00 | 2024-11-22T09:00:00+00:00 | 2025-05-06T17:00:00+00:00 | MW | 26 | 130 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_025 | Dismissed | Planned | Production unavailability | 2025-04-17T10:45:03+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-28T17:00:00+00:00 | MW | 39 | 117 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_025 | Dismissed | Planned | Production unavailability | 2025-04-17T10:45:17+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-28T17:00:00+00:00 | MW | 185 | 117 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_024 | Dismissed | Planned | Production unavailability | 2025-04-11T10:56:46+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-22T17:00:00+00:00 | MW | 39 | 117 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_024 | Dismissed | Planned | Production unavailability | 2025-04-11T10:57:30+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-22T17:00:00+00:00 | MW | 185 | 117 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009653_023 | Dismissed | Planned | Production unavailability | 2025-04-04T10:52:57+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-14T17:00:00+00:00 | MW | 211 | 91 | 302 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_023 | Dismissed | Planned | Production unavailability | 2025-04-04T10:54:45+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-14T17:00:00+00:00 | MW | 39 | 117 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_022 | Dismissed | Planned | Production unavailability | 2025-04-04T10:52:45+00:00 | 2024-11-22T09:00:00+00:00 | 2025-04-14T17:00:00+00:00 | MW | 26 | 130 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |