Last update at: 2025-12-16T17:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 28 29 30 31 32 > | ||||||||||||||||||
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010183_003 | Dismissed | Planned | Consumption unavailability | 2025-05-29T16:37:58+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T16:45:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010182_003 | Dismissed | Planned | Production unavailability | 2025-05-29T16:36:30+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T16:45:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010183_002 | Dismissed | Planned | Consumption unavailability | 2025-05-29T05:17:40+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010182_002 | Dismissed | Planned | Production unavailability | 2025-05-29T05:18:38+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010182_001 | Dismissed | Planned | Production unavailability | 2025-05-27T10:36:50+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010183_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T10:38:23+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_012 | Inactive | Unplanned | Consumption unavailability | 2025-05-29T08:02:31+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_011 | Dismissed | Unplanned | Consumption unavailability | 2025-05-27T10:33:16+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_010 | Dismissed | Unplanned | Consumption unavailability | 2025-05-23T12:03:34+00:00 | 2025-04-22T17:35:55+00:00 | 2025-06-06T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_009 | Dismissed | Unplanned | Consumption unavailability | 2025-05-20T12:20:37+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-30T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_008 | Dismissed | Unplanned | Consumption unavailability | 2025-05-14T16:08:32+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-23T12:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_008 | Inactive | Planned | Consumption unavailability | 2025-05-29T08:02:31+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_007 | Dismissed | Planned | Consumption unavailability | 2025-05-28T17:21:11+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_007 | Dismissed | Unplanned | Consumption unavailability | 2025-05-09T13:59:55+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-16T12:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_006 | Dismissed | Unplanned | Consumption unavailability | 2025-04-29T13:31:32+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-12T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_006 | Dismissed | Planned | Consumption unavailability | 2025-05-28T15:30:48+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-29T06:59:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_006 | Inactive | Planned | Production unavailability | 2025-05-29T08:02:31+00:00 | 2025-05-13T12:00:00+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_005 | Dismissed | Planned | Production unavailability | 2025-05-27T10:34:15+00:00 | 2025-05-13T12:00:00+00:00 | 2025-05-29T07:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_005 | Dismissed | Planned | Consumption unavailability | 2025-05-28T10:09:43+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-29T00:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_005 | Dismissed | Unplanned | Consumption unavailability | 2025-04-28T17:02:56+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-05T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_004 | Dismissed | Unplanned | Consumption unavailability | 2025-04-24T13:48:49+00:00 | 2025-04-22T17:35:55+00:00 | 2025-05-01T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_004 | Dismissed | Planned | Consumption unavailability | 2025-05-27T20:52:49+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-28T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_004 | Dismissed | Planned | Production unavailability | 2025-05-23T12:02:06+00:00 | 2025-05-13T12:00:00+00:00 | 2025-06-06T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_003 | Dismissed | Planned | Production unavailability | 2025-05-20T12:21:41+00:00 | 2025-05-13T12:00:00+00:00 | 2025-05-30T17:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_003 | Dismissed | Planned | Consumption unavailability | 2025-05-27T09:17:54+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-28T00:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_003 | Dismissed | Unplanned | Consumption unavailability | 2025-04-24T08:31:42+00:00 | 2025-04-22T17:35:55+00:00 | 2025-04-30T23:59:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_002 | Dismissed | Unplanned | Consumption unavailability | 2025-04-23T16:45:05+00:00 | 2025-04-22T17:35:55+00:00 | 2025-04-24T23:59:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_002 | Dismissed | Planned | Consumption unavailability | 2025-05-26T22:20:15+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-27T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_002 | Dismissed | Planned | Production unavailability | 2025-05-14T16:07:22+00:00 | 2025-05-13T12:00:00+00:00 | 2025-05-23T12:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010144_001 | Dismissed | Planned | Production unavailability | 2025-05-12T23:03:43+00:00 | 2025-05-13T12:00:00+00:00 | 2025-05-16T12:00:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010178_001 | Dismissed | Planned | Consumption unavailability | 2025-05-26T09:31:51+00:00 | 2025-05-26T10:30:53+00:00 | 2025-05-26T23:59:57+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010090_001 | Dismissed | Unplanned | Consumption unavailability | 2025-04-22T17:43:30+00:00 | 2025-04-22T17:35:55+00:00 | 2025-04-23T23:59:00+00:00 | MW | 150 | 0 | 150 | Failure | Grid |
Hydro Pumped Storage | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_008 | Inactive | Planned | Production unavailability | 2025-05-27T09:29:09+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-28T17:00:33+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_007 | Dismissed | Planned | Production unavailability | 2025-05-27T08:53:22+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-28T17:00:33+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_006 | Dismissed | Planned | Production unavailability | 2025-05-27T07:30:06+00:00 | 2025-05-09T12:28:30+00:00 | 2025-06-04T17:00:33+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_005 | Dismissed | Planned | Production unavailability | 2025-05-23T10:56:47+00:00 | 2025-05-09T12:28:30+00:00 | 2025-06-03T17:00:33+00:00 | MW | 0 | 195 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_004 | Dismissed | Planned | Production unavailability | 2025-05-21T08:02:55+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-27T12:28:33+00:00 | MW | 13 | 182 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_003 | Dismissed | Planned | Production unavailability | 2025-05-21T07:58:17+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-27T12:28:33+00:00 | MW | 0 | 195 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_002 | Dismissed | Planned | Production unavailability | 2025-05-16T10:47:17+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-27T12:28:33+00:00 | MW | 26 | 169 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_001 | Dismissed | Planned | Production unavailability | 2025-05-09T12:29:15+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-19T12:28:33+00:00 | MW | 52 | 143 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_007 | Inactive | Planned | Production unavailability | 2025-05-27T09:28:56+00:00 | 2025-05-09T12:27:01+00:00 | 2025-05-28T17:00:06+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_006 | Dismissed | Planned | Production unavailability | 2025-05-27T08:53:04+00:00 | 2025-05-09T12:27:01+00:00 | 2025-05-28T17:00:06+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_005 | Dismissed | Planned | Production unavailability | 2025-05-27T07:30:40+00:00 | 2025-05-09T12:27:01+00:00 | 2025-06-04T17:00:06+00:00 | MW | 195 | 0 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_004 | Dismissed | Planned | Production unavailability | 2025-05-23T10:57:32+00:00 | 2025-05-09T12:27:01+00:00 | 2025-06-03T17:00:06+00:00 | MW | 26 | 169 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_003 | Dismissed | Planned | Production unavailability | 2025-05-16T10:47:43+00:00 | 2025-05-09T12:27:01+00:00 | 2025-05-27T12:27:06+00:00 | MW | 52 | 143 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_002 | Dismissed | Planned | Production unavailability | 2025-05-12T08:35:13+00:00 | 2025-05-09T12:27:01+00:00 | 2025-05-19T12:27:06+00:00 | MW | 52 | 143 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010128_001 | Dismissed | Planned | Production unavailability | 2025-05-09T12:27:36+00:00 | 2025-05-09T12:27:01+00:00 | 2025-05-19T12:27:06+00:00 | MW | 65 | 130 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_006 | Inactive | Planned | Production unavailability | 2025-05-27T09:28:42+00:00 | 2025-05-09T12:00:40+00:00 | 2025-05-28T17:00:24+00:00 | MW | 312 | 0 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_005 | Dismissed | Planned | Production unavailability | 2025-05-27T08:53:39+00:00 | 2025-05-09T12:00:40+00:00 | 2025-05-28T17:00:24+00:00 | MW | 312 | 0 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010127_004 | Dismissed | Planned | Production unavailability | 2025-05-27T07:29:35+00:00 | 2025-05-09T12:00:40+00:00 | 2025-06-04T17:00:24+00:00 | MW | 312 | 0 | 312 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |