This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-07-26T13:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
1 2 3 4 5 >
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_001 Active 2024-07-26T12:31:39+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_001 Active 2024-07-26T12:31:36+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_005 Inactive 2024-07-23T10:47:32+01:00 2023-05-10T08:47:00+01:00 2024-07-23T09:40:00+01:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_004 Dismissed 2024-07-23T09:37:42+01:00 2023-05-10T08:47:00+01:00 2024-07-23T09:40:00+01:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_003 Dismissed 2023-08-04T18:05:35+01:00 2023-05-10T08:47:00+01:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_002 Dismissed 2023-08-04T17:37:40+01:00 2023-05-10T08:47:00+01:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_001 Dismissed 2023-05-10T08:49:10+01:00 2023-05-10T08:47:00+01:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009241_002 Inactive 2024-07-15T19:02:32+01:00 2024-07-15T02:01:00+01:00 2024-07-15T18:00:00+01:00
Post outage out of merit commission/testing run.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009241_001 Dismissed 2024-07-12T10:10:34+01:00 2024-07-15T02:01:00+01:00 2024-07-15T18:00:00+01:00
Post outage out of merit commission/testing run.
Other_0000000000000009232_003 Inactive 2024-07-08T22:02:32+01:00 2024-07-08T08:00:00+01:00 2024-07-08T21:00:00+01:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009202_002 Inactive 2024-07-03T19:02:32+01:00 2024-07-03T13:00:00+01:00 2024-07-03T18:00:00+01:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_010 Inactive 2024-07-01T13:02:32+01:00 2022-07-14T17:23:00+01:00 2024-07-01T12:00:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_009 Dismissed 2024-05-21T12:12:29+01:00 2022-07-14T17:23:00+01:00 2024-07-01T12:00:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_008 Dismissed 2024-05-16T17:24:21+01:00 2022-07-14T17:23:00+01:00 2024-07-01T12:00:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_007 Dismissed 2024-04-14T22:58:55+01:00 2022-07-14T17:23:00+01:00 2024-07-01T12:00:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_006 Dismissed 2024-04-03T10:47:47+01:00 2022-07-14T17:23:00+01:00 2024-07-01T12:00:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_005 Dismissed 2024-03-07T14:58:39+00:00 2022-07-14T17:23:00+01:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_004 Dismissed 2024-02-13T16:06:55+00:00 2022-07-14T17:23:00+01:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_003 Dismissed 2023-02-10T11:57:40+00:00 2022-07-14T17:23:00+01:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking
48X000000000314Y
Other_0000000000000000039_002 Dismissed 2022-09-20T12:28:17+01:00 2022-07-14T17:23:00+01:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking Wind Farm
Other_0000000000000000039_001 Dismissed 2022-07-14T17:25:58+01:00 2022-07-14T17:23:00+01:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Dogger Bank A
48X0000000003113
Other_0000000000000009175_002 Active 2024-06-21T14:23:06+01:00 2024-06-21T14:00:00+01:00 2025-03-31T14:00:00+01:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_001 Dismissed 2024-06-21T14:21:28+01:00 2024-06-21T14:00:00+01:00 2025-03-31T14:00:00+01:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_003 Active 2024-06-21T14:22:29+01:00 2023-11-10T12:44:00+00:00 2025-03-31T00:00:00+01:00
It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_002 Dismissed 2024-03-22T16:27:38+00:00 2023-11-10T12:44:00+00:00 2025-01-30T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_001 Dismissed 2023-11-10T15:42:44+00:00 2023-11-10T12:44:00+00:00 2024-12-31T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000009139_003 Inactive 2024-06-07T13:02:32+01:00 2024-06-06T00:00:00+01:00 2024-06-07T12:00:00+01:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009127_004 Inactive 2024-06-04T01:02:31+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Inactive 2024-06-04T01:02:31+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_002 Inactive 2024-05-24T16:25:24+01:00 2024-05-24T00:00:00+01:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_001 Dismissed 2024-05-24T16:24:36+01:00 2024-05-24T00:00:00+01:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
Other_0000000000000009072_002 Inactive 2024-05-17T23:02:32+01:00 2024-05-17T07:00:00+01:00 2024-05-17T22:00:00+01:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000008475_003 Inactive 2024-05-17T23:02:32+01:00 2023-10-02T17:05:00+01:00 2024-05-17T22:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
Other_0000000000000009044_005 Inactive 2024-04-27T01:02:32+01:00 2024-04-26T00:00:00+01:00 2024-04-26T23:59:59+01:00
Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented.
SSE Thermal Generation (Scotland) Ltd
48X0000000003024
Other_0000000000000009038_002 Inactive 2024-04-23T01:02:47+01:00 2024-04-22T00:01:00+01:00 2024-04-22T23:59:00+01:00
Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024.
SSE Thermal Generation (Scotland) Ltd
48X0000000003024
Other_0000000000000009038_001 Dismissed 2024-04-19T14:29:07+01:00 2024-04-22T00:01:00+01:00 2024-04-22T23:59:00+01:00
Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024.
Other_0000000000000008908_004 Inactive 2024-03-18T01:02:32+00:00 2024-03-04T00:00:00+00:00 2024-03-18T00:00:00+00:00
SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work).
Other_0000000000000008899_004 Inactive 2024-03-08T01:02:31+00:00 2024-03-04T06:00:00+00:00 2024-03-07T23:59:00+00:00
Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads.
SSE Thermal Generation (Scotland) Ltd
48X0000000003024
Other_0000000000000008909_002 Dismissed 2024-03-05T15:33:12+00:00 2024-03-04T16:37:00+00:00
Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead
SSE Thermal Generation (Scotland) Ltd
48X0000000003024
Other_0000000000000008909_001 Dismissed 2024-03-04T16:40:26+00:00 2024-03-04T16:37:00+00:00
Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead
KEADBY GEN. LTD
48X000000000073U
Other_0000000000000008783_003 Dismissed 2024-01-25T10:06:41+00:00 2024-01-16T00:00:00+00:00 2024-06-29T00:00:00+01:00
Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability. The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
KEADBY GEN. LTD
48X000000000073U
Other_0000000000000008783_002 Dismissed 2024-01-23T14:55:33+00:00 2024-01-16T00:00:00+00:00 2024-06-29T00:00:00+01:00
Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability. The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
KEADBY GEN. LTD
48X000000000073U
Other_0000000000000008783_001 Dismissed 2024-01-23T08:48:33+00:00 2024-01-22T00:00:00+00:00 2024-06-29T00:00:00+01:00
Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability. The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000000041_004 Inactive 2024-01-01T01:02:32+00:00 2022-09-01T00:00:00+01:00 2023-12-31T23:59:00+00:00
Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000000041_003 Dismissed 2023-02-28T10:01:18+00:00 2022-09-01T00:00:00+01:00 2023-12-31T23:59:00+00:00
Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000000041_002 Dismissed 2022-09-02T09:34:18+01:00 2022-09-01T00:00:00+01:00 2023-12-31T23:59:00+00:00
Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000000041_001 Dismissed 2022-09-01T16:31:20+01:00 2024-01-01T00:00:00+00:00 2030-01-01T00:00:00+00:00
Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly
KEADBY GEN. LTD
48X000000000073U
Other_0000000000000008178_002 Inactive 2023-11-22T01:02:36+00:00 2023-11-14T00:00:00+00:00 2023-11-21T23:59:00+00:00
Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed.
KEADBY GEN. LTD
48X000000000073U
Other_0000000000000008178_001 Dismissed 2023-06-07T16:31:26+01:00 2023-11-14T00:00:00+00:00 2023-11-21T23:59:00+00:00
Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed.
SSE Energy Supply Limited
A0001004V.UK
Other_0000000000000008476_002 Inactive 2023-10-24T23:47:32+01:00 2023-10-24T22:36:00+01:00 2023-10-24T22:40:00+01:00
end of outage