Last update at: 2024-10-03T15:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | |||||||||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000009501_002 | Dismissed | 2024-10-03T14:43:04+01:00 | 2024-10-03T15:00:00+01:00 | 2024-10-03T15:03:00+01:00 | This is a test submission to check connection to Elexon Insights |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000009501_001 | Dismissed | 2024-10-03T14:42:19+01:00 | 2024-10-03T15:00:00+01:00 | 2024-10-03T15:03:00+01:00 | This is a test submission to check connection to Elexon Insights |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_007 | Dismissed | 2024-09-27T09:23:17+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_006 | Dismissed | 2024-09-27T09:04:57+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_005 | Dismissed | 2024-09-27T09:04:33+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_004 | Dismissed | 2024-09-27T08:55:31+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_003 | Dismissed | 2024-06-21T14:22:29+01:00 | 2023-11-10T12:44:00+00:00 | 2025-03-31T00:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Dismissed | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_001 | Active | 2024-09-27T09:23:00+01:00 | 2024-09-27T09:18:00+01:00 | 2025-07-31T10:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000009175_003 | Active | 2024-09-27T08:57:17+01:00 | 2024-06-21T14:00:00+01:00 | 2025-06-30T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_002 | Dismissed | 2024-06-21T14:23:06+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_001 | Dismissed | 2024-06-21T14:21:28+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_003 | Inactive | 2024-09-13T01:02:32+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_002 | Dismissed | 2024-09-09T09:01:48+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009354_001 | Dismissed | 2024-08-23T14:04:31+01:00 | 2024-09-10T00:01:00+01:00 | 2024-09-12T23:59:00+01:00 | Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 10th,11th and 12th of September 2024. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000009351_002 | Dismissed | 2024-08-22T14:55:24+01:00 | 2024-09-22T14:52:00+01:00 | 2024-09-22T14:53:00+01:00 | This is a further test publication following the automation of SSE REMIT app. Please ignore. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000009351_001 | Dismissed | 2024-08-22T14:51:45+01:00 | 2024-09-22T14:52:00+01:00 | 2024-09-22T14:53:00+01:00 | This is a further test publication following the automation of SSE REMIT app. Please ignore. |
||
Other_0000000000000009256_008 | Inactive | 2024-08-01T04:02:32+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T03:00:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_002 | Dismissed | 2024-07-29T14:20:34+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_001 | Dismissed | 2024-07-26T12:31:36+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_002 | Dismissed | 2024-07-29T14:19:57+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_001 | Dismissed | 2024-07-26T12:31:39+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_005 | Inactive | 2024-07-23T10:47:32+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_004 | Dismissed | 2024-07-23T09:37:42+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Dismissed | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_002 | Dismissed | 2023-08-04T17:37:40+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_001 | Dismissed | 2023-05-10T08:49:10+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_002 | Inactive | 2024-07-15T19:02:32+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_001 | Dismissed | 2024-07-12T10:10:34+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
Other_0000000000000009232_003 | Inactive | 2024-07-08T22:02:32+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-08T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||||
Other_0000000000000009202_002 | Inactive | 2024-07-03T19:02:32+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_010 | Inactive | 2024-07-01T13:02:32+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_009 | Dismissed | 2024-05-21T12:12:29+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_008 | Dismissed | 2024-05-16T17:24:21+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Dismissed | 2024-04-14T22:58:55+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_004 | Dismissed | 2024-02-13T16:06:55+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_003 | Dismissed | 2023-02-10T11:57:40+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking |
48X000000000314Y | Other_0000000000000000039_002 | Dismissed | 2022-09-20T12:28:17+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Other_0000000000000009139_003 | Inactive | 2024-06-07T13:02:32+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-07T12:00:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||||
Other_0000000000000009127_004 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins. |
||||
Other_0000000000000009127_003 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_002 | Inactive | 2024-05-24T16:25:24+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_001 | Dismissed | 2024-05-24T16:24:36+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
Other_0000000000000009072_002 | Inactive | 2024-05-17T23:02:32+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
Other_0000000000000008475_003 | Inactive | 2024-05-17T23:02:32+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |