Last update at: 2026-01-12T15:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| < 3 4 5 6 7 > | |||||||||
| Other_0000000000000010152_001 | Dismissed | 2025-05-15T15:58:37+00:00 | 2025-05-20T10:00:25+00:00 | 2025-05-22T23:00:37+00:00 | Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025 |
||||
| Other_0000000000000008899_004 | Inactive | 2024-03-08T01:02:31+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
| Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
| Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||||
| Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||||
| Other_0000000000000009955_002 | Inactive | 2025-04-02T20:02:32+00:00 | 2025-03-06T17:02:01+00:00 | 2025-04-02T19:00:00+00:00 | Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025. |
||||
| Other_0000000000000009955_001 | Dismissed | 2025-03-06T17:04:05+00:00 | 2025-03-06T17:02:01+00:00 | 2025-04-02T19:00:00+00:00 | Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025. |
||||
| Other_0000000000000010556_003 | Inactive | 2025-10-10T17:32:32+00:00 | 2025-10-08T08:30:00+00:00 | 2025-10-10T16:30:00+00:00 | Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 8th Oct. They'll be periods of inflexibility and slightly reduced load. |
||||
| Other_0000000000000010556_002 | Dismissed | 2025-10-06T08:48:13+00:00 | 2025-10-08T08:30:00+00:00 | 2025-10-10T16:30:00+00:00 | Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 8th Oct. They'll be periods of inflexibility and slightly reduced load. |
||||
| Other_0000000000000010556_001 | Dismissed | 2025-09-30T14:56:12+00:00 | 2025-10-06T08:30:00+00:00 | 2025-10-08T16:30:00+00:00 | Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 6th Oct. They'll be periods of inflexibility and slightly reduced load. |
||||
| Other_0000000000000010561_003 | Inactive | 2025-10-02T22:02:32+00:00 | 2025-10-01T10:56:33+00:00 | 2025-10-02T21:00:44+00:00 | Keadby 1 enters a period a hot commissioning following a planned outage. It may run outwith market conditions for periods to facilitate the completion of this task. |
||||
| Other_0000000000000010561_002 | Dismissed | 2025-10-01T11:00:01+00:00 | 2025-10-01T10:56:33+00:00 | 2025-10-02T21:00:44+00:00 | Keadby 1 enters a period a hot commissioning following a planned outage. It may run outwith market conditions for periods to facilitate the completion of this task. |
||||
| Other_0000000000000010561_001 | Dismissed | 2025-10-01T10:59:39+00:00 | 2025-10-01T10:56:33+00:00 | 2025-10-02T21:00:44+00:00 | Keadby 1 enters a period a hot commissioning following a planned outage. A may run outwith market conditions for periods to facilitate the completion of this task. |
||||
| Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+00:00 | 2024-04-26T00:00:00+00:00 | 2024-06-06T00:00:00+00:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_008 | Dismissed | 2024-05-16T17:24:21+00:00 | 2022-07-14T17:23:00+00:00 | 2024-07-01T12:00:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Dismissed | 2024-04-14T22:58:55+00:00 | 2022-07-14T17:23:00+00:00 | 2024-07-01T12:00:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_010 | Inactive | 2024-07-01T13:02:32+00:00 | 2022-07-14T17:23:00+00:00 | 2024-07-01T12:00:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_009 | Dismissed | 2024-05-21T12:12:29+00:00 | 2022-07-14T17:23:00+00:00 | 2024-07-01T12:00:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+00:00 | 2022-07-14T17:23:00+00:00 | 2024-07-01T12:00:00+00:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
SSE Airtricity Limited |
23X--140207ALT-9 | Other_0000000000000009584_001 | Dismissed | 2024-10-31T09:34:29+00:00 | 2024-10-31T10:00:00+00:00 | 2024-11-28T17:00:00+00:00 | It is expected that Yellow River commissioning will start in November 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
SSE Airtricity Limited |
23X--140207ALT-9 | Other_0000000000000009584_003 | Inactive | 2024-11-28T18:02:32+00:00 | 2024-10-31T10:00:00+00:00 | 2024-11-28T17:00:00+00:00 | It is expected that Yellow River commissioning will start in December 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
SSE Airtricity Limited |
23X--140207ALT-9 | Other_0000000000000009584_002 | Dismissed | 2024-11-11T14:48:52+00:00 | 2024-10-31T10:00:00+00:00 | 2024-11-28T17:00:00+00:00 | It is expected that Yellow River commissioning will start in December 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000009704_003 | Dismissed | 2024-12-05T18:22:37+00:00 | 2024-12-05T18:15:00+00:00 | 2024-12-10T09:00:00+00:00 | It is expected that Strathy South Windfarm commissioning will start Q22027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000009704_001 | Dismissed | 2024-12-05T18:12:34+00:00 | 2024-12-05T18:15:00+00:00 | 2025-06-05T09:00:00+00:00 | It is expected that Strathy South Windfarm commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000009704_002 | Dismissed | 2024-12-05T18:14:15+00:00 | 2024-12-05T18:15:00+00:00 | 2025-06-05T09:00:00+00:00 | It is expected that Strathy South Windfarm commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000009704_006 | Inactive | 2024-12-10T10:02:32+00:00 | 2024-12-05T18:15:00+00:00 | 2024-12-10T09:00:00+00:00 | It is expected that Strathy South Windfarm commissioning will start in Q2 2027 |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000009704_005 | Dismissed | 2024-12-05T18:24:43+00:00 | 2024-12-05T18:15:00+00:00 | 2024-12-10T09:00:00+00:00 | It is expected that Strathy South Windfarm commissioning will start in Q2 2027 |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010438_001 | Active | 2025-08-21T10:21:58+00:00 | 2025-08-21T10:30:00+00:00 | 2025-12-19T10:00:00+00:00 | It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
SSE Airtricity Limited |
23X--140207ALT-9 | Other_0000000000000010696_001 | Active | 2025-11-22T11:27:06+00:00 | 2025-11-22T11:25:00+00:00 | 2027-02-28T11:25:00+00:00 | It is expected that Drumnahough commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 58MW being available during Q4 2027. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000010455_002 | Active | 2025-12-11T08:53:56+00:00 | 2025-08-29T13:35:00+00:00 | 2026-12-31T16:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available for generation during H1 2027. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000010455_001 | Dismissed | 2025-08-29T13:38:33+00:00 | 2025-08-29T13:35:00+00:00 | 2026-03-31T16:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2026. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Dismissed | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_007 | Dismissed | 2024-09-27T09:23:17+00:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_006 | Dismissed | 2024-09-27T09:04:57+00:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_005 | Dismissed | 2024-09-27T09:04:33+00:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_004 | Dismissed | 2024-09-27T08:55:31+00:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_002 | Inactive | 2025-07-31T11:02:32+00:00 | 2024-09-27T09:18:00+00:00 | 2025-07-31T10:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000009473_001 | Dismissed | 2024-09-27T09:23:00+00:00 | 2024-09-27T09:18:00+00:00 | 2025-07-31T10:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_003 | Dismissed | 2024-06-21T14:22:29+00:00 | 2023-11-10T12:44:00+00:00 | 2025-03-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Seagreen Wind Energy Ltd |
Other_0000000000000000029_002 | Dismissed | 2021-03-09T13:55:35+00:00 | 2021-03-09T13:33:00+00:00 | It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Seagreen wind energy Ltd |
Other_0000000000000000029_001 | Dismissed | 2021-03-09T13:41:20+00:00 | 2021-03-09T13:33:00+00:00 | It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_003 | Dismissed | 2023-02-10T11:57:40+00:00 | 2022-07-14T17:23:00+00:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking |
48X000000000314Y | Other_0000000000000000039_002 | Dismissed | 2022-09-20T12:28:17+00:00 | 2022-07-14T17:23:00+00:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+00:00 | 2022-07-14T17:23:00+00:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_004 | Dismissed | 2024-02-13T16:06:55+00:00 | 2022-07-14T17:23:00+00:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_009 | Dismissed | 2022-03-07T10:12:53+00:00 | 2021-03-09T13:33:00+00:00 | It is anticipated that Seagreen commissioning period will start March 2022 subject to the Offshore Substation being installed March 2022 and circuit 1 complete and commissioned by mid-June 2022. Full commercial operation is expected to commence February 2023. It is expected that over 2022 there will be 270MW available July 2022, 600MW by late Q3 and the total capacity of 1075MW available by Q1 2023. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_008 | Dismissed | 2022-02-07T16:15:11+00:00 | 2021-03-09T13:33:00+00:00 | It is anticipated that Seagreen commissioning period will start March 2022 subject to the Offshore Substation being installed March 2022 and circuit 1 complete and commissioned by end of May 2022. Full commercial operation is expected to commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 and the total capacity of 1075MW available by the end of 2022. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_007 | Dismissed | 2022-02-07T11:55:37+00:00 | 2021-03-09T13:33:00+00:00 | It is anticipated that Seagreen commissioning period will start 07/03/22 subject to the Offshore Substation being installed February 2022 and circuit 1 complete and commissioned by 21/05/22. Full commercial operation will commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||