Last update at: 2024-04-27T01:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | |||||||||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_004 | Dismissed | 2022-09-20T12:19:09+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_003 | Dismissed | 2021-11-18T10:21:30+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
Other_0000000000000000038_002 | Dismissed | 2021-11-02T14:08:36+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Dogger Bank A |
Other_0000000000000000038_001 | Dismissed | 2021-11-02T11:32:15+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Great Island |
Great Island |
Other_0000000000000008475_002 | Active | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+01:00 | 2023-10-02T17:05:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_003 | Inactive | 2022-10-17T16:02:33+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_002 | Dismissed | 2022-10-17T14:46:02+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_001 | Dismissed | 2022-10-14T15:47:02+01:00 | 2022-10-14T15:35:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_001 | Dismissed | 2017-03-23T14:04:44+00:00 | 2018-04-01T00:00:00+01:00 | From the 1st April 2018 we will be reducing the TEC at Peterhead to zero. The cancellation of our TEC at this time is a risk mitigation measure to avoid a substantial cancellation charge if we were to cancel later in the year, once we have completed our review of the stations future, which we announced on 6 February 2017. We will reapply for TEC and subject to receiving a satisfactory offer from NGET, reinstate TEC should our review conclude that the station has an enduring future. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000040_002 | Inactive | 2022-08-26T09:01:54+01:00 | 2022-08-26T00:00:00+01:00 | 2022-08-26T08:00:00+01:00 | Foyers Power station dam is undergoing testing during the forthcoming station outage. In advance of the outage the water level will be raised to Top water level and this has the potential to incur pumping activity in the hours leading up to the outage. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000040_001 | Dismissed | 2022-08-17T16:13:32+01:00 | 2022-08-26T00:00:00+01:00 | 2022-08-26T08:00:00+01:00 | Foyers Power station dam is undergoing testing during the forthcoming station outage. In advance of the outage the water level will be raised to Top water level and this has the potential to incur pumping activity in the hours leading up to the outage. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_001 | Dismissed | 2024-04-24T19:54:16+01:00 | 2024-04-25T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000024_001 | Active | 2019-06-13T12:30:13+01:00 | 2019-06-13T12:30:00+01:00 | Fiddler’s Ferry Units 2, 3 and 4 (BMU IDs: T_FIDL-2, T_FIDL-3, T_FIDL-4) are expected to close with effect from 31 March 2020. |
|||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_002 | Inactive | 2023-10-24T23:47:32+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_001 | Dismissed | 2023-10-24T22:39:53+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
Great Island |
Great Island |
Other_0000000000000008203_004 | Dismissed | 2023-10-02T17:07:15+01:00 | 2023-06-19T10:07:00+01:00 | 2024-05-17T22:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_003 | Dismissed | 2023-07-27T12:34:51+01:00 | 2023-06-19T10:07:00+01:00 | 2024-05-17T22:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_002 | Dismissed | 2023-06-19T10:34:59+01:00 | 2023-06-19T10:07:00+01:00 | 2023-07-28T10:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_001 | Dismissed | 2023-06-19T10:13:07+01:00 | 2023-06-19T10:07:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
|||
Other_0000000000000007814_002 | Inactive | 2023-07-06T01:02:32+01:00 | 2022-12-22T17:39:00+00:00 | 2023-07-06T00:00:00+01:00 | Due to a failed Auxiliary transformer at Medway the capability for onload transition from 1 GT and 1 Steam Turbine (1+1) to 2 GT’s and 1 Steam turbine is no longer possible. It is expected this situation will be resolved during the summer outage in 2023 |
||||
Medway |
T_MEDP-1 |
Other_0000000000000007814_001 | Dismissed | 2022-12-22T17:45:01+00:00 | 2022-12-22T17:39:00+00:00 | 2023-07-06T00:00:00+01:00 | Due to a failed Auxiliary transformer at Medway the capability for onload transition from 1 GT and 1 Steam Turbine (1+1) to 2 GT’s and 1 Steam turbine is no longer possible. It is expected this situation will be resolved during the summer outage in 2023 |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009040_002 | Inactive | 2024-04-22T10:37:32+01:00 | 2024-04-19T09:00:00+01:00 | 2025-01-06T00:00:00+00:00 | Dogger Bank A is in the commissioning phase and it is expected that there will be a steady increase in installed capacity with c. 400MW available by the end of Q2 2024, c.800MW by the end of Q3 2024, c.1050MW by the end of Q4 2024 and the total capacity of 1.2GW available during Q1 2025. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009040_001 | Dismissed | 2024-04-22T09:04:24+01:00 | 2024-04-19T09:00:00+01:00 | 2025-01-06T00:00:00+00:00 | Dogger Bank A is in the commissioning phase and it is expected that there will be a steady increase in installed capacity with c. 400MW available by the end of Q2 2024, c.800MW by the end of Q3 2024, c.1050MW by the end of Q4 2024 and the total capacity of 1.2GW available during Q1 2025. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000035_002 | Inactive | 2021-05-17T09:01:53+01:00 | 2021-05-14T23:00:00+01:00 | 2021-05-17T08:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 14/05/2021 to 08:00 on 17/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000035_001 | Dismissed | 2021-05-13T13:20:34+01:00 | 2021-05-14T23:00:00+01:00 | 2021-05-17T08:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 14/05/2021 to 08:00 on 17/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000034_002 | Inactive | 2021-05-15T00:01:53+01:00 | 2021-05-13T23:00:00+01:00 | 2021-05-14T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 13/05/2021 to 23:00 on 14/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000034_001 | Dismissed | 2021-05-12T13:04:36+01:00 | 2021-05-13T23:00:00+01:00 | 2021-05-14T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 13/05/2021 to 23:00 on 14/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000033_002 | Inactive | 2021-05-14T00:01:52+01:00 | 2021-05-12T23:00:00+01:00 | 2021-05-13T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 12/05/2021 to 23:00 on 13/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000033_001 | Dismissed | 2021-05-11T11:39:02+01:00 | 2021-05-12T23:00:00+01:00 | 2021-05-13T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 23:00 on 12/05/2021 to 23:00 on 13/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000032_002 | Inactive | 2021-05-13T00:01:51+01:00 | 2021-05-12T17:00:00+01:00 | 2021-05-12T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 17:00 on 12/05/2021 to 23:00 on 12/05/2021. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000032_001 | Dismissed | 2021-05-10T12:49:52+01:00 | 2021-05-12T17:00:00+01:00 | 2021-05-12T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 780MW non-firm TEC from 17:00 on 12/05/2021 to 23:00 on 12/05/2021. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000036_002 | Inactive | 2021-05-19T09:01:54+01:00 | 2021-05-17T08:00:00+01:00 | 2021-05-19T08:00:00+01:00 | D-2 non-firm TEC Guidance issued: 500MW non-firm TEC from 08:00 on 17/05/2021 to 08:00 on 19/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000036_001 | Dismissed | 2021-05-13T13:22:03+01:00 | 2021-05-17T08:00:00+01:00 | 2021-05-19T08:00:00+01:00 | D-2 non-firm TEC Guidance issued: 500MW non-firm TEC from 08:00 on 17/05/2021 to 08:00 on 19/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000037_002 | Inactive | 2021-05-22T00:01:53+01:00 | 2021-05-19T08:00:00+01:00 | 2021-05-21T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 0MW non-firm TEC from 08:00 on 19/05/2021 to 23:00 on 21/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000037_001 | Dismissed | 2021-05-13T13:23:19+01:00 | 2021-05-19T08:00:00+01:00 | 2021-05-21T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 0MW non-firm TEC from 08:00 on 19/05/2021 to 23:00 on 21/05/2021 (BST). |
||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_015 | Dismissed | 2022-09-20T12:16:29+01:00 | 2021-03-09T13:33:00+00:00 | Commissioning & energisation is ongoing,first export forecast Mid-Aug & full availability by Apr23.BMU6 first export as updated via the portal.BMU5 expected to energise full allocation 80MW early Oct.BMU4 expected to energise with 20MW end Oct with full allocation mid Apr23.BMU3 expected to energise with 60MW end of Sept with full availability Apr23.BMU2 expected to energise with 20MW early Nov, with full availability Mar23.BMU1 expected to energise with 40MW Nov & reach full availability Apr23 |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_014 | Dismissed | 2022-08-05T16:52:37+01:00 | 2021-03-09T13:33:00+00:00 | Commissioning & energisation is ongoing,first export forecast Mid-Aug & full availability by Apr23.BMU6 first export as updated via the portal.BMU5 expected to energise full allocation 80MW early Oct.BMU4 expected to energise with 20MW end Oct with full allocation mid Apr23.BMU3 expected to energise with 60MW end of Sept with full availability Apr23.BMU2 expected to energise with 20MW early Nov, with full availability Mar23.BMU1 expected to energise with 40MW Nov & reach full availability Apr23 |
|||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_004 | Dismissed | 2024-04-25T10:49:47+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_003 | Dismissed | 2024-04-25T10:23:07+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_001 | Dismissed | 2023-05-10T08:49:10+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008120_001 | Active | 2023-05-10T08:47:39+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008119_001 | Active | 2023-05-10T08:46:36+01:00 | 2023-05-10T08:43:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_002 | Dismissed | 2023-08-04T17:37:40+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_001 | Dismissed | 2023-05-10T08:50:25+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery GE as the instructed contractor will complete works at site Further contracts needed to facilitate this project continue to be negotiated |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_002 | Active | 2023-08-04T17:30:10+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Active | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
Great Island |
Great Island |
Other_0000000000000007751_001 | Dismissed | 2022-12-01T11:39:41+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|
||
Great Island |
Great Island |
Other_0000000000000007751_001 | Dismissed | 2022-12-01T11:42:47+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|