SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-03-10T16:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 3 4 5 6 7 >
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000008251_011 Dismissed 2023-08-25T10:13:08+00:00 2023-07-18T13:30:00+00:00 2023-08-31T07:00:00+00:00
It is anticipated that DoggerBank A commissioning will start on 31st Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000008251_013 Dismissed 2023-08-30T16:05:41+00:00 2023-07-18T13:30:00+00:00 2023-09-06T07:00:00+00:00
It is anticipated that DoggerBank A commissioning will start on 6th Sept 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.125MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000008251_005 Dismissed 2023-08-01T14:41:23+00:00 2023-07-18T13:30:00+00:00 2023-08-07T07:00:00+00:00
It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.600MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000008251_004 Dismissed 2023-07-28T16:16:25+00:00 2023-07-18T13:30:00+00:00 2023-08-02T07:00:00+00:00
It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.600MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000008251_003 Dismissed 2023-07-28T16:14:41+00:00 2023-07-18T13:30:00+00:00 2023-08-02T07:00:00+00:00
It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.200MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated.
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_004 Dismissed 2021-11-30T10:14:00+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start 06/03/22 subject to the Offshore Substation being installed January 2022 and circuit 1 complete and commissioned by 06/03/22. Full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be 270MW available by the early Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated
Seagreen Wind Energy Ltd
Other_0000000000000000029_003 Dismissed 2021-08-16T12:27:40+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start 06/03/22 subject to the Offshore Substation being installed January 2022 and circuit 1 complete and commissioned by 06/03/22. Full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be 270MW available by the early Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_006 Dismissed 2022-01-13T17:07:41+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start 07/03/22 subject to the Offshore Substation being installed February 2022 and circuit 1 complete and commissioned by 01/05/22. Full commercial operation will commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated.
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_005 Dismissed 2021-12-07T13:46:29+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start 07/03/22 subject to the Offshore Substation being installed February 2022 and circuit 1 complete and commissioned by 18/04/22. Full commercial operation will commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated.
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_007 Dismissed 2022-02-07T11:55:37+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start 07/03/22 subject to the Offshore Substation being installed February 2022 and circuit 1 complete and commissioned by 21/05/22. Full commercial operation will commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated.
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_008 Dismissed 2022-02-07T16:15:11+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start March 2022 subject to the Offshore Substation being installed March 2022 and circuit 1 complete and commissioned by end of May 2022. Full commercial operation is expected to commence January 2023. It is expected that over 2022 there will be 270MW available Q2, 600MW by early Q3 and the total capacity of 1075MW available by the end of 2022.
Seagreen Wind Energy Ltd
48X000000000263P
Other_0000000000000000029_009 Dismissed 2022-03-07T10:12:53+00:00 2021-03-09T13:33:00+00:00
It is anticipated that Seagreen commissioning period will start March 2022 subject to the Offshore Substation being installed March 2022 and circuit 1 complete and commissioned by mid-June 2022. Full commercial operation is expected to commence February 2023. It is expected that over 2022 there will be 270MW available July 2022, 600MW by late Q3 and the total capacity of 1075MW available by Q1 2023.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_004 Dismissed 2024-02-13T16:06:55+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_003 Dismissed 2023-02-10T11:57:40+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking
48X000000000314Y
Other_0000000000000000039_002 Dismissed 2022-09-20T12:28:17+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Viking Wind Farm
Other_0000000000000000039_001 Dismissed 2022-07-14T17:25:58+00:00 2022-07-14T17:23:00+00:00
It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works
Seagreen Wind Energy Ltd
Other_0000000000000000029_002 Dismissed 2021-03-09T13:55:35+00:00 2021-03-09T13:33:00+00:00
It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated.
Seagreen wind energy Ltd
Other_0000000000000000029_001 Dismissed 2021-03-09T13:41:20+00:00 2021-03-09T13:33:00+00:00
It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_003 Dismissed 2024-06-21T14:22:29+00:00 2023-11-10T12:44:00+00:00 2025-03-31T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_001 Dismissed 2023-11-10T15:42:44+00:00 2023-11-10T12:44:00+00:00 2024-12-31T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000009473_002 Inactive 2025-07-31T11:02:32+00:00 2024-09-27T09:18:00+00:00 2025-07-31T10:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000009473_001 Dismissed 2024-09-27T09:23:00+00:00 2024-09-27T09:18:00+00:00 2025-07-31T10:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_007 Dismissed 2024-09-27T09:23:17+00:00 2023-11-10T12:44:00+00:00 2025-06-30T11:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_006 Dismissed 2024-09-27T09:04:57+00:00 2023-11-10T12:44:00+00:00 2025-06-30T11:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_005 Dismissed 2024-09-27T09:04:33+00:00 2023-11-10T12:44:00+00:00 2025-06-30T11:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_004 Dismissed 2024-09-27T08:55:31+00:00 2023-11-10T12:44:00+00:00 2025-06-30T11:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000008538_002 Dismissed 2024-03-22T16:27:38+00:00 2023-11-10T12:44:00+00:00 2025-01-30T00:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000010455_001 Dismissed 2025-08-29T13:38:33+00:00 2025-08-29T13:35:00+00:00 2026-03-31T16:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2026. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000010455_002 Active 2025-12-11T08:53:56+00:00 2025-08-29T13:35:00+00:00 2026-12-31T16:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available for generation during H1 2027. As relevant details of the commissioning plans become firmer REMIT will be updated.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000010696_001 Active 2025-11-22T11:27:06+00:00 2025-11-22T11:25:00+00:00 2027-02-28T11:25:00+00:00
It is expected that Drumnahough commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 58MW being available during Q4 2027. As relevant details of the commissioning plans become firmer REMIT will be updated.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_001 Dismissed 2025-08-21T10:21:58+00:00 2025-08-21T10:30:00+00:00 2025-12-19T10:00:00+00:00
It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_003 Dismissed 2026-03-05T12:14:43+00:00 2025-08-21T10:30:00+00:00 2026-03-31T10:00:00+00:00
It is expected that Ferrybridge BESS will achieve commercial operations on 13th March 2026. As relevant details of the plans become firmer REMIT will be updated
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_004 Active 2026-03-10T16:18:01+00:00 2025-08-21T10:30:00+00:00 2026-03-31T10:00:00+00:00
It is expected that Ferrybridge BESS will achieve commercial operations on 18th March 2026. As relevant details of the plans become firmer REMIT will be updated
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_002 Dismissed 2026-02-17T16:51:31+00:00 2025-08-21T10:30:00+00:00 2026-03-31T10:00:00+00:00
It is expected that Ferrybridge BESS will achieve commercial operations on 2nd March 2026. As relevant details of the plans become firmer REMIT will be updated
SSE GENERATION
48X000000000077M
Other_0000000000000009704_006 Inactive 2024-12-10T10:02:32+00:00 2024-12-05T18:15:00+00:00 2024-12-10T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start in Q2 2027
SSE GENERATION
48X000000000077M
Other_0000000000000009704_005 Dismissed 2024-12-05T18:24:43+00:00 2024-12-05T18:15:00+00:00 2024-12-10T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start in Q2 2027
SSE GENERATION
48X000000000077M
Other_0000000000000009704_002 Dismissed 2024-12-05T18:14:15+00:00 2024-12-05T18:15:00+00:00 2025-06-05T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
SSE GENERATION
48X000000000077M
Other_0000000000000009704_001 Dismissed 2024-12-05T18:12:34+00:00 2024-12-05T18:15:00+00:00 2025-06-05T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.”
SSE GENERATION
48X000000000077M
Other_0000000000000009704_003 Dismissed 2024-12-05T18:22:37+00:00 2024-12-05T18:15:00+00:00 2024-12-10T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start Q22027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 208MW being available.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000009584_003 Inactive 2024-11-28T18:02:32+00:00 2024-10-31T10:00:00+00:00 2024-11-28T17:00:00+00:00
It is expected that Yellow River commissioning will start in December 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000009584_002 Dismissed 2024-11-11T14:48:52+00:00 2024-10-31T10:00:00+00:00 2024-11-28T17:00:00+00:00
It is expected that Yellow River commissioning will start in December 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000009584_001 Dismissed 2024-10-31T09:34:29+00:00 2024-10-31T10:00:00+00:00 2024-11-28T17:00:00+00:00
It is expected that Yellow River commissioning will start in November 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_006 Dismissed 2024-04-03T10:47:47+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_005 Dismissed 2024-03-07T14:58:39+00:00 2022-07-14T17:23:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_010 Inactive 2024-07-01T13:02:32+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_009 Dismissed 2024-05-21T12:12:29+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_007 Dismissed 2024-04-14T22:58:55+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_008 Dismissed 2024-05-16T17:24:21+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Other_0000000000000009044_002 Dismissed 2024-04-25T09:44:41+00:00 2024-04-26T00:00:00+00:00 2024-06-06T00:00:00+00:00
KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024.
Other_0000000000000010561_001 Dismissed 2025-10-01T10:59:39+00:00 2025-10-01T10:56:33+00:00 2025-10-02T21:00:44+00:00
Keadby 1 enters a period a hot commissioning following a planned outage. A may run outwith market conditions for periods to facilitate the completion of this task.