Last update at: 2024-07-26T13:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | |||||||||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000027_002 | Dismissed | 2021-03-01T15:11:31+00:00 | 2021-12-20T00:00:00+00:00 | 2022-05-13T00:01:00+01:00 | It is currently anticipated Keadby 2 performance validation period will start on 20/12/2021 & finish on 13/05/2022. Prior to this there will be a commissioning phase, during which there will be periods of intermittent generation. The commissioning phase is scheduled to start in August 2021 & run until the start of the validation period. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_005 | Dismissed | 2021-11-29T13:21:53+00:00 | 2022-05-23T00:00:00+01:00 | 2022-09-03T00:00:00+01:00 | It is currently anticipated Keadby 2 performance validation period will start on 23/05/2022 & finish on 03/09/2022. Prior to this there will be a commissioning phase, during which there will be periods of intermittent generation. The commissioning phase started in October 2021 & will run until the start of the validation period. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_006 | Dismissed | 2022-05-16T15:33:37+01:00 | 2022-05-23T00:00:00+01:00 | 2022-09-30T00:00:00+01:00 | It is currently anticipated Keadby 2 performance validation period will start on 23/05/2022 & finish on 30/09/2022. Prior to this there will be a commissioning phase, during which there will be periods of intermittent generation. The commissioning phase started in October 2021 & will run until the start of the validation period. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_003 | Dismissed | 2021-08-05T16:06:16+01:00 | 2022-02-28T00:00:00+00:00 | 2022-07-21T00:00:00+01:00 | It is currently anticipated Keadby 2 performance validation period will start on 28/02/2022 & finish on 21/07/2022. Prior to this there will be a commissioning phase, during which there will be periods of intermittent generation. The commissioning phase is scheduled to start in October 2021 & run until the start of the validation period. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_010 | Dismissed | 2022-09-21T16:51:34+01:00 | 2022-01-12T00:00:00+00:00 | 2023-01-10T23:59:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 10/01/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_009 | Dismissed | 2022-09-20T11:17:25+01:00 | 2022-01-12T00:00:00+00:00 | 2022-12-19T23:59:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 10/01/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_001 | Dismissed | 2022-12-19T16:02:46+00:00 | 2022-01-12T00:00:00+00:00 | 2023-02-11T23:59:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 11/02/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_002 | Dismissed | 2023-02-06T08:49:47+00:00 | 2022-01-12T00:00:00+00:00 | 2023-03-12T23:59:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 12/03/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_011 | Dismissed | 2022-11-22T12:07:38+00:00 | 2022-01-12T00:00:00+00:00 | 2023-02-14T23:59:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 14/02/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_005 | Inactive | 2023-03-15T10:02:32+00:00 | 2022-01-12T00:00:00+00:00 | 2023-03-15T09:00:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 15/03/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_004 | Dismissed | 2023-03-10T15:59:26+00:00 | 2022-01-12T00:00:00+00:00 | 2023-03-15T09:00:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 15/03/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_003 | Dismissed | 2023-03-10T15:58:32+00:00 | 2022-01-12T00:00:00+00:00 | 2023-03-10T09:00:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 15/03/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
Seagreen Wind Energy Ltd |
Other_0000000000000000029_002 | Dismissed | 2021-03-09T13:55:35+00:00 | 2021-03-09T13:33:00+00:00 | It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Seagreen wind energy Ltd |
Other_0000000000000000029_001 | Dismissed | 2021-03-09T13:41:20+00:00 | 2021-03-09T13:33:00+00:00 | It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_003 | Active | 2024-06-21T14:22:29+01:00 | 2023-11-10T12:44:00+00:00 | 2025-03-31T00:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Dismissed | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_010 | Inactive | 2024-07-01T13:02:32+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_009 | Dismissed | 2024-05-21T12:12:29+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Dismissed | 2024-04-14T22:58:55+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_008 | Dismissed | 2024-05-16T17:24:21+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+01:00 | 2024-04-26T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_003 | Dismissed | 2024-01-25T10:06:41+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_002 | Dismissed | 2024-01-23T14:55:33+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_001 | Dismissed | 2024-01-23T08:48:33+00:00 | 2024-01-22T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_002 | Inactive | 2023-11-22T01:02:36+00:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_001 | Dismissed | 2023-06-07T16:31:26+01:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+01:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Other_0000000000000008899_004 | Inactive | 2024-03-08T01:02:31+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
Medway |
T_MEDP-1 |
Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008420_002 | Dismissed | 2023-09-18T12:19:36+01:00 | 2023-09-19T10:00:00+01:00 | 2023-09-19T19:00:00+01:00 | Operating at circa 300MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008420_001 | Dismissed | 2023-09-15T15:01:11+01:00 | 2023-09-19T10:00:00+01:00 | 2023-09-19T19:00:00+01:00 | Operating at circa 300MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008421_002 | Dismissed | 2023-09-18T12:19:17+01:00 | 2023-09-20T08:00:00+01:00 | 2023-09-20T19:00:00+01:00 | Operating at circa 550MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008421_001 | Dismissed | 2023-09-15T15:02:40+01:00 | 2023-09-20T08:00:00+01:00 | 2023-09-20T19:00:00+01:00 | Operating at circa 550MW for statutory testing. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_039 | Dismissed | 2023-10-07T21:51:29+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | Other market information message withdrawn with first generation achieved 07/10/23 All REMIT submitted by BMU on SSE Remit portal. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_002 | Inactive | 2024-04-23T01:02:47+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_003 | Active | 2017-12-19T12:08:01+00:00 | 2018-04-01T00:00:00+01:00 | Peterhead TEC has been increased to 1180MW on an enduring basis from 1st April 2018 and will continue operations at 1180MW going forward. |
|||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_002 | Inactive | 2024-07-15T19:02:32+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
MEDWAY POWER LTD |
48X000000000076O | Other_0000000000000009241_001 | Dismissed | 2024-07-12T10:10:34+01:00 | 2024-07-15T02:01:00+01:00 | 2024-07-15T18:00:00+01:00 | Post outage out of merit commission/testing run. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008436_001 | Dismissed | 2023-09-20T08:29:55+01:00 | 2023-09-21T12:00:00+01:00 | 2023-09-21T19:00:00+01:00 | Running at Circa 300MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_001 | Dismissed | 2023-09-20T08:32:32+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | Running at Circa 550MW for statutory testing |
||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_012 | Dismissed | 2022-06-17T11:53:11+01:00 | 2021-03-09T13:33:00+00:00 | Seagreen commissioning has commenced and is ongoing, with circuit 1 forecast complete and commissioned by Late-July 2022. Full commercial operation is expected to commence Mid-April 2023. It is expected that over 2022 there will be 500MW October, 720MW December and the total capacity of 1075MW available by April 2023. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_013 | Dismissed | 2022-07-21T17:11:40+01:00 | 2021-03-09T13:33:00+00:00 | Seagreen commissioning is ongoing, with circuit 1 forecast complete and commissioned by End-July 2022. Full commercial operation is expected to commence End-April 2023. It is expected that First Generation will be Early-Aug, with 100MW by End-Aug, 500MW Oct, 720MW December 2022 and the total capacity of 1075MW available by April 2023. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_011 | Dismissed | 2022-04-27T13:19:42+01:00 | 2021-03-09T13:33:00+00:00 | Seagreen commissioning period started late March 2022, with circuit 1 forecast complete and commissioned by mid-July 2022. Full commercial operation is expected to commence Mid-April 2023. It is expected that over 2022 there will be 500MW September, 720MW December and the total capacity of 1075MW available by April 2023. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_010 | Dismissed | 2022-03-29T16:49:45+01:00 | 2021-03-09T13:33:00+00:00 | Seagreen commissioning period started late March 2022, with the Offshore Substation being installed early March 2022 and circuit 1 complete and commissioned by mid-July 2022. Full commercial operation is expected to commence March 2023. It is expected that over 2022 there will be 270MW available August 2022, 600MW by late Q3 and the total capacity of 1075MW available by late Q1 2023. |
|||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_016 | Dismissed | 2022-09-20T14:16:02+01:00 | 2021-03-09T13:33:00+00:00 | Seagreen first export achieved 22 Aug with full availability expected by Apr 23. As generation becomes available, this will be reported via the portal. |