Last update at: 2025-11-24T15:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | |||||||||
| Other_0000000000000010099_001 | Dismissed | 2025-04-28T17:31:19+00:00 | 2025-05-01T23:59:00+00:00 | 2025-05-02T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 02/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010099_004 | Inactive | 2025-05-10T01:02:32+00:00 | 2025-05-08T23:59:00+00:00 | 2025-05-09T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010099_003 | Dismissed | 2025-05-01T10:21:43+00:00 | 2025-05-08T23:59:00+00:00 | 2025-05-09T23:59:00+00:00 | For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
| Other_0000000000000010248_002 | Inactive | 2025-06-20T14:02:32+00:00 | 2025-06-20T09:00:00+00:00 | 2025-06-20T13:00:00+00:00 | Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-1 |
Other_0000000000000010248_001 | Dismissed | 2025-05-30T15:59:36+00:00 | 2025-06-20T09:00:00+00:00 | 2025-06-20T13:00:00+00:00 | Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||
| Other_0000000000000010247_002 | Inactive | 2025-06-18T14:02:32+00:00 | 2025-06-18T09:00:00+00:00 | 2025-06-18T13:00:00+00:00 | Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-2 |
Other_0000000000000010247_001 | Dismissed | 2025-05-30T15:58:21+00:00 | 2025-06-18T09:00:00+00:00 | 2025-06-18T13:00:00+00:00 | Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT. |
||
| Other_0000000000000010283_002 | Inactive | 2025-06-16T18:02:32+00:00 | 2025-06-12T17:14:46+00:00 | 2025-06-16T17:00:49+00:00 | Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||||
Foyers |
T_FOYE-2 |
Other_0000000000000010283_001 | Dismissed | 2025-06-12T17:15:23+00:00 | 2025-06-12T17:14:46+00:00 | 2025-06-16T17:00:49+00:00 | Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_001 | Dismissed | 2017-03-23T14:04:44+00:00 | 2018-04-01T00:00:00+00:00 | From the 1st April 2018 we will be reducing the TEC at Peterhead to zero. The cancellation of our TEC at this time is a risk mitigation measure to avoid a substantial cancellation charge if we were to cancel later in the year, once we have completed our review of the stations future, which we announced on 6 February 2017. We will reapply for TEC and subject to receiving a satisfactory offer from NGET, reinstate TEC should our review conclude that the station has an enduring future. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_003 | Inactive | 2025-08-24T18:02:32+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-24T17:00:00+00:00 | GI4 experienced a steam turbine fault. This fault is now being repaired |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_002 | Dismissed | 2025-08-21T16:16:45+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-24T17:00:00+00:00 | GI4 experienced a steam turbine fault. This fault is now being repaired |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_001 | Dismissed | 2022-10-14T15:47:02+00:00 | 2022-10-14T15:35:00+00:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
|||
| Other_0000000000000008475_003 | Inactive | 2024-05-17T23:02:32+00:00 | 2023-10-02T17:05:00+00:00 | 2024-05-17T22:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
| Other_0000000000000008475_002 | Dismissed | 2023-10-02T17:20:09+00:00 | 2023-10-02T17:05:00+00:00 | 2024-05-17T22:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
| Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+00:00 | 2023-10-02T17:05:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_002 | Dismissed | 2024-07-29T14:20:34+00:00 | 2024-07-30T00:00:00+00:00 | 2026-05-01T00:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_001 | Dismissed | 2024-07-26T12:31:36+00:00 | 2024-07-30T00:00:00+00:00 | 2026-05-01T00:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_002 | Dismissed | 2024-07-29T14:19:57+00:00 | 2024-07-30T00:00:00+00:00 | 2026-05-01T00:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_001 | Dismissed | 2024-07-26T12:31:39+00:00 | 2024-07-30T00:00:00+00:00 | 2026-05-01T00:00:00+00:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
| Other_0000000000000009284_007 | Inactive | 2025-06-10T04:02:32+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_006 | Dismissed | 2025-06-09T04:07:03+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T03:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_005 | Dismissed | 2025-06-09T01:48:55+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T09:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_004 | Dismissed | 2025-06-09T00:24:09+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-10T01:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_003 | Dismissed | 2025-05-31T12:59:58+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-09T23:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_002 | Dismissed | 2024-11-11T14:44:45+00:00 | 2024-08-02T00:00:00+00:00 | 2025-06-06T23:59:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
| Other_0000000000000009284_001 | Dismissed | 2024-07-29T14:17:35+00:00 | 2024-08-02T00:00:00+00:00 | 2025-04-30T00:00:00+00:00 | Great Island is unavailable to run on oil due to plant fault. |
||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000010435_001 | Dismissed | 2025-08-20T17:18:49+00:00 | 2025-08-20T17:14:21+00:00 | 2025-08-25T17:00:45+00:00 | If GI4 is desynchronised a steam turbine fault investigation will be required. This would prevent GI4 from restarting for a period of time to be determined. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_005 | Dismissed | 2023-02-10T11:54:13+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_004 | Dismissed | 2022-09-20T12:19:09+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_003 | Dismissed | 2021-11-18T10:21:30+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
Other_0000000000000000038_002 | Dismissed | 2021-11-02T14:08:36+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Dogger Bank A |
Other_0000000000000000038_001 | Dismissed | 2021-11-02T11:32:15+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_006 | Dismissed | 2023-05-12T16:59:23+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_009 | Dismissed | 2023-05-18T13:59:17+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_008 | Dismissed | 2023-05-16T09:17:28+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_007 | Dismissed | 2023-05-16T09:02:22+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000008140_002 | Dismissed | 2023-07-19T13:26:01+00:00 | 2023-05-18T14:01:00+00:00 | 2023-07-23T00:00:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23rd July 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c200MW available by the end of Q3 2023, c500MW by the end of Q4 2023, c700MW by the end of Q1 2024, 950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000008140_001 | Dismissed | 2023-05-18T14:01:15+00:00 | 2023-05-18T14:01:00+00:00 | 2023-07-23T00:00:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23rd July 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c200MW available by the end of Q3 2023, c500MW by the end of Q4 2023, c700MW by the end of Q1 2024, 950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_029 | Dismissed | 2023-09-30T16:22:05+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-02T07:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 02nd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_033 | Dismissed | 2023-10-03T11:39:12+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-03T20:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_032 | Dismissed | 2023-10-03T07:08:50+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-03T12:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_030 | Dismissed | 2023-10-01T17:10:08+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-03T07:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_031 | Dismissed | 2023-10-02T08:51:38+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-03T07:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_035 | Dismissed | 2023-10-05T16:49:11+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-06T19:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_034 | Dismissed | 2023-10-03T16:16:32+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-06T07:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_036 | Dismissed | 2023-10-06T15:08:54+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-06T19:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_038 | Dismissed | 2023-10-06T16:23:25+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-08T19:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_037 | Dismissed | 2023-10-06T15:46:32+00:00 | 2023-07-18T13:30:00+00:00 | 2023-10-08T19:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_014 | Dismissed | 2023-09-05T17:41:03+00:00 | 2023-07-18T13:30:00+00:00 | 2023-09-13T07:00:00+00:00 | It is anticipated that Dogger Bank A commissioning will start on 13th Sept 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.125MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||