Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | |||||||||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_001 | Dismissed | 2024-01-23T08:48:33+00:00 | 2024-01-22T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_002 | Dismissed | 2024-01-23T14:55:33+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_003 | Dismissed | 2024-01-25T10:06:41+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
Great Island |
Great Island |
Other_0000000000000008845_001 | Dismissed | 2024-02-13T14:42:10+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
Great Island |
Great Island |
Other_0000000000000008845_002 | Inactive | 2024-02-13T14:47:42+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+01:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||
Other_0000000000000008899_004 | Inactive | 2024-03-08T01:02:31+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Other_0000000000000008908_004 | Inactive | 2024-03-18T01:02:32+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000008909_001 | Dismissed | 2024-03-04T16:40:26+00:00 | 2024-03-04T16:37:00+00:00 | Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead |
|||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000008909_002 | Dismissed | 2024-03-05T15:33:12+00:00 | 2024-03-04T16:37:00+00:00 | Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead |
|||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_002 | Inactive | 2024-04-23T01:02:47+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_001 | Dismissed | 2024-04-24T19:54:16+01:00 | 2024-04-25T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+01:00 | 2024-04-26T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_003 | Dismissed | 2024-04-25T10:23:07+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_004 | Dismissed | 2024-04-25T10:49:47+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_001 | Dismissed | 2024-04-25T12:04:26+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-21T23:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_002 | Dismissed | 2024-05-17T08:50:18+01:00 | 2024-04-27T23:00:00+01:00 | 2024-06-28T00:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_003 | Dismissed | 2024-06-25T15:31:25+01:00 | 2024-04-27T23:00:00+01:00 | 2024-06-28T00:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Great Island |
Great Island |
Other_0000000000000009072_001 | Dismissed | 2024-05-08T10:08:54+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||
Other_0000000000000009072_002 | Inactive | 2024-05-17T23:02:32+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_001 | Dismissed | 2024-05-13T11:11:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running at circa 600MW for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_002 | Dismissed | 2024-05-13T17:15:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_003 | Dismissed | 2024-05-14T08:51:35+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_004 | Dismissed | 2024-05-16T18:36:19+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:49+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:53+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Great Island |
Great Island |
Other_0000000000000009107_001 | Dismissed | 2024-05-24T16:18:52+01:00 | 2029-12-24T16:19:00+00:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Unit Level. |
|||
Great Island |
Great Island |
Other_0000000000000009107_002 | Inactive | 2024-05-24T16:22:43+01:00 | 2029-12-24T16:19:00+00:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Unit Level. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_001 | Dismissed | 2024-05-24T16:24:36+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_002 | Inactive | 2024-05-24T16:25:24+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
Medway |
T_MEDP-1 |
Other_0000000000000009127_001 | Dismissed | 2024-05-31T09:03:01+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity station on load run. Once out of merit run is complete our dynamic data NDZ value will become 360 mins. |
||
Medway |
T_MEDP-1 |
Other_0000000000000009127_002 | Dismissed | 2024-06-03T08:32:07+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||
Medway |
T_MEDP-1 |
Other_0000000000000009127_002 | Dismissed | 2024-06-03T08:32:16+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||
Medway |
T_MEDP-1 |
Other_0000000000000009127_003 | Dismissed | 2024-06-03T16:49:21+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins. |
||
Other_0000000000000009127_003 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins. |
||||
Other_0000000000000009127_004 | Inactive | 2024-06-04T01:02:31+01:00 | 2024-06-03T00:00:00+01:00 | 2024-06-03T23:59:00+01:00 | Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins. |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009139_001 | Dismissed | 2024-06-04T15:45:42+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-06T23:59:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009139_002 | Dismissed | 2024-06-06T17:30:33+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-07T12:00:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||
Other_0000000000000009139_003 | Inactive | 2024-06-07T13:02:32+01:00 | 2024-06-06T00:00:00+01:00 | 2024-06-07T12:00:00+01:00 | T_KEAD-1 2+1 run required for post outage commissioning works. |
||||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_001 | Dismissed | 2024-06-21T14:21:28+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009175_002 | Active | 2024-06-21T14:23:06+01:00 | 2024-06-21T14:00:00+01:00 | 2025-03-31T14:00:00+01:00 | Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009202_001 | Dismissed | 2024-07-02T09:06:48+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||
Other_0000000000000009202_002 | Inactive | 2024-07-03T19:02:32+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |