Last update at: 2024-10-03T15:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | |||||||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_001 | Dismissed | 2024-07-26T12:31:39+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_005 | Inactive | 2024-07-23T10:47:32+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_004 | Dismissed | 2024-07-23T09:37:42+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Dismissed | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_002 | Dismissed | 2023-08-04T17:37:40+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_001 | Dismissed | 2023-05-10T08:49:10+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_002 | Inactive | 2024-05-24T16:25:24+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_001 | Dismissed | 2024-05-24T16:24:36+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_004 | Inactive | 2024-01-01T01:02:32+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_003 | Dismissed | 2023-02-28T10:01:18+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_002 | Dismissed | 2022-09-02T09:34:18+01:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_001 | Dismissed | 2022-09-01T16:31:20+01:00 | 2024-01-01T00:00:00+00:00 | 2030-01-01T00:00:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_004 | Dismissed | 2023-08-09T14:21:16+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_003 | Dismissed | 2023-08-09T14:15:15+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_002 | Dismissed | 2023-08-09T14:14:24+01:00 | 2023-08-09T14:09:00+01:00 | 2023-08-10T14:14:00+01:00 | This is a test message |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_001 | Dismissed | 2023-08-09T14:11:02+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_002 | Active | 2023-08-04T17:30:10+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_001 | Dismissed | 2023-05-10T08:50:25+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery GE as the instructed contractor will complete works at site Further contracts needed to facilitate this project continue to be negotiated |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008120_001 | Active | 2023-05-10T08:47:39+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008119_001 | Active | 2023-05-10T08:46:36+01:00 | 2023-05-10T08:43:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000007750_001 | Dismissed | 2022-12-01T11:33:28+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000007750_001 | Dismissed | 2022-12-01T11:36:04+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_003 | Inactive | 2022-10-17T16:02:33+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_002 | Dismissed | 2022-10-17T14:46:02+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_001 | Dismissed | 2022-10-14T15:47:02+01:00 | 2022-10-14T15:35:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
|||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_004 | Dismissed | 2024-10-01T16:28:19+01:00 | 2024-10-07T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 1 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_003 | Dismissed | 2024-09-25T09:07:21+01:00 | 2024-10-07T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 1 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_002 | Dismissed | 2024-09-23T16:12:25+01:00 | 2024-09-30T09:00:00+01:00 | 2024-10-13T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 2 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009457_001 | Dismissed | 2024-09-23T15:52:48+01:00 | 2024-09-30T09:00:00+01:00 | 2024-10-06T18:00:00+01:00 | T_PEHE-1, Upcoming pipeline pigging operations. Planned 4 runs over 2 week period with each run requiring 3+1 operation (circa 920 MW) for approximately 6 hours. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009350_002 | Dismissed | 2024-08-22T14:45:18+01:00 | 2024-09-22T00:00:00+01:00 | 2024-09-22T00:00:01+01:00 | This is a test publication following the automation of SSE REMIT admin app. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009350_001 | Dismissed | 2024-08-22T14:41:23+01:00 | 2024-09-22T00:00:00+01:00 | 2024-09-22T00:00:01+01:00 | This is a test publication following the automation of SSE REMIT admin app. |
||
Other_0000000000000009256_008 | Inactive | 2024-08-01T04:02:32+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T03:00:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||||
Great Island |
Great Island |
Other_0000000000000009256_007 | Dismissed | 2024-07-31T21:10:48+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T03:00:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_006 | Dismissed | 2024-07-31T21:07:31+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T00:03:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_005 | Dismissed | 2024-07-30T15:59:06+01:00 | 2024-07-31T00:00:00+01:00 | 2024-07-31T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_004 | Dismissed | 2024-07-29T14:03:08+01:00 | 2024-08-01T00:00:00+01:00 | 2024-08-01T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_003 | Dismissed | 2024-07-28T16:25:13+01:00 | 2024-07-31T00:00:00+01:00 | 2024-08-01T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_002 | Dismissed | 2024-07-27T20:37:44+01:00 | 2024-07-29T00:00:00+01:00 | 2024-07-30T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009256_001 | Dismissed | 2024-07-18T16:02:07+01:00 | 2024-07-28T00:00:00+01:00 | 2024-07-29T23:59:00+01:00 | Unit will be completing testing within the range of 0-464MW following completion of centreline outage. |
||
Great Island |
Great Island |
Other_0000000000000009284_001 | Active | 2024-07-29T14:17:35+01:00 | 2024-08-02T00:00:00+01:00 | 2025-04-30T00:00:00+01:00 | Great Island is unavailable to run on oil due to plant fault. |
||
Other_0000000000000009232_003 | Inactive | 2024-07-08T22:02:32+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-08T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009232_002 | Dismissed | 2024-07-05T16:16:03+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-08T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009232_001 | Dismissed | 2024-07-05T14:44:07+01:00 | 2024-07-08T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_003 | Dismissed | 2024-07-08T21:43:03+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 370MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_002 | Dismissed | 2024-07-08T09:37:04+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 370MW. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009233_001 | Dismissed | 2024-07-05T16:18:45+01:00 | 2024-07-09T08:00:00+01:00 | 2024-07-09T21:00:00+01:00 | T_PEHE-1 commissioning run at circa 1000MW. |
||
Other_0000000000000009202_002 | Inactive | 2024-07-03T19:02:32+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009202_001 | Dismissed | 2024-07-02T09:06:48+01:00 | 2024-07-03T13:00:00+01:00 | 2024-07-03T18:00:00+01:00 | T_PEHE-1 running for post outage commissioning at circa 600MW. |
||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_003 | Dismissed | 2024-06-25T15:31:25+01:00 | 2024-04-27T23:00:00+01:00 | 2024-06-28T00:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |