Last update at: 2024-04-27T01:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | |||||||||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_009 | Dismissed | 2023-08-18T09:18:00+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-23T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 23rd Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_008 | Dismissed | 2023-08-14T14:39:29+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-20T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 20th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_007 | Dismissed | 2023-08-09T17:31:28+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-15T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 15th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.900MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_006 | Dismissed | 2023-08-04T15:49:36+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-11T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 11th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.900MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_005 | Dismissed | 2023-08-01T14:41:23+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-07T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.600MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_004 | Dismissed | 2023-07-28T16:16:25+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-02T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.150MW available by the end of Q3 2023, c.400MW by the end of Q4 2023, c.600MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_003 | Dismissed | 2023-07-28T16:14:41+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-02T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 7th Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.200MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_002 | Dismissed | 2023-07-24T13:53:38+01:00 | 2023-07-18T13:30:00+01:00 | 2023-08-02T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 2nd Aug 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.200MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_001 | Dismissed | 2023-07-18T13:28:20+01:00 | 2023-07-18T13:30:00+01:00 | 2023-07-28T07:00:00+01:00 | It is anticipated that DoggerBank A commissioning will start on 28th July 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.200MW available by the end of Q3 2023, c.450MW by the end of Q4 2023, c.650MW by the end of Q1 2024, c.950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_009 | Dismissed | 2023-05-18T13:59:17+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_008 | Dismissed | 2023-05-16T09:17:28+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_007 | Dismissed | 2023-05-16T09:02:22+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q2 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_006 | Dismissed | 2023-05-12T16:59:23+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q2 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000000038_005 | Dismissed | 2023-02-10T11:54:13+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009040_002 | Inactive | 2024-04-22T10:37:32+01:00 | 2024-04-19T09:00:00+01:00 | 2025-01-06T00:00:00+00:00 | Dogger Bank A is in the commissioning phase and it is expected that there will be a steady increase in installed capacity with c. 400MW available by the end of Q2 2024, c.800MW by the end of Q3 2024, c.1050MW by the end of Q4 2024 and the total capacity of 1.2GW available during Q1 2025. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009040_001 | Dismissed | 2024-04-22T09:04:24+01:00 | 2024-04-19T09:00:00+01:00 | 2025-01-06T00:00:00+00:00 | Dogger Bank A is in the commissioning phase and it is expected that there will be a steady increase in installed capacity with c. 400MW available by the end of Q2 2024, c.800MW by the end of Q3 2024, c.1050MW by the end of Q4 2024 and the total capacity of 1.2GW available during Q1 2025. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000008140_002 | Dismissed | 2023-07-19T13:26:01+01:00 | 2023-05-18T14:01:00+01:00 | 2023-07-23T00:00:00+01:00 | It is anticipated that Dogger Bank A commissioning period will start on 23rd July 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c200MW available by the end of Q3 2023, c500MW by the end of Q4 2023, c700MW by the end of Q1 2024, 950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000008140_001 | Dismissed | 2023-05-18T14:01:15+01:00 | 2023-05-18T14:01:00+01:00 | 2023-07-23T00:00:00+01:00 | It is anticipated that Dogger Bank A commissioning period will start on 23rd July 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c200MW available by the end of Q3 2023, c500MW by the end of Q4 2023, c700MW by the end of Q1 2024, 950MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_004 | Dismissed | 2022-09-20T12:19:09+01:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
48X0000000003113 | Other_0000000000000000038_003 | Dismissed | 2021-11-18T10:21:30+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
|||
Dogger Bank A |
Other_0000000000000000038_002 | Dismissed | 2021-11-02T14:08:36+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Dogger Bank A |
Other_0000000000000000038_001 | Dismissed | 2021-11-02T11:32:15+00:00 | 2021-02-11T11:31:00+00:00 | It is anticipated that Dogger Bank A commissioning period will start on 23/07/2023 with 300MW to be installed by this date and full commercial operation will commence by end of Q1 of 2024. It is expected that there will be a steady increase in installed capacity with approximately 790MW available by the end of Q3 2023, 1050MW by the end of Q4 2023 and the total capacity of 1.2GW available by the end of Q1 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_004 | Dismissed | 2024-04-25T10:49:47+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_003 | Dismissed | 2024-04-25T10:23:07+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+01:00 | 2024-04-26T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_001 | Dismissed | 2024-04-24T19:54:16+01:00 | 2024-04-25T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_001 | Active | 2024-04-25T12:04:26+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-21T23:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Other_0000000000000008908_004 | Inactive | 2024-03-18T01:02:32+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |
||
Other_0000000000000008899_004 | Inactive | 2024-03-08T01:02:31+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
Medway |
T_MEDP-1 |
Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+01:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Great Island |
Great Island |
Other_0000000000000008845_002 | Inactive | 2024-02-13T14:47:42+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
Great Island |
Great Island |
Other_0000000000000008845_001 | Dismissed | 2024-02-13T14:42:10+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
Great Island |
Great Island |
Other_0000000000000008475_002 | Active | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+01:00 | 2023-10-02T17:05:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||
Great Island |
Great Island |
Other_0000000000000008203_004 | Dismissed | 2023-10-02T17:07:15+01:00 | 2023-06-19T10:07:00+01:00 | 2024-05-17T22:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_003 | Dismissed | 2023-07-27T12:34:51+01:00 | 2023-06-19T10:07:00+01:00 | 2024-05-17T22:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_002 | Dismissed | 2023-06-19T10:34:59+01:00 | 2023-06-19T10:07:00+01:00 | 2023-07-28T10:00:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
||
Great Island |
Great Island |
Other_0000000000000008203_001 | Dismissed | 2023-06-19T10:13:07+01:00 | 2023-06-19T10:07:00+01:00 | Due to plant fault, unit is not available to run on distillate oil. Gas running is not affected |
|||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_006 | Dismissed | 2023-09-22T15:13:14+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times referenced in the comments section in Elexon as requested |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_005 | Dismissed | 2023-09-21T17:33:37+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times referenced in the comments section in Elexon as requested |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_004 | Dismissed | 2023-09-21T17:03:58+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:01:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times in Elexon |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_003 | Dismissed | 2023-09-21T16:48:56+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:01:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_002 | Dismissed | 2023-09-21T14:26:32+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 550MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_001 | Dismissed | 2023-09-20T08:32:32+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | Running at Circa 550MW for statutory testing |