Last update at: 2024-07-26T13:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | |||||||||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000000029_004 | Dismissed | 2021-11-30T10:14:00+00:00 | 2021-03-09T13:33:00+00:00 | It is anticipated that Seagreen commissioning period will start 06/03/22 subject to the Offshore Substation being installed January 2022 and circuit 1 complete and commissioned by 06/03/22. Full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be 270MW available by the early Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated |
|||
Seagreen Wind Energy Ltd |
Other_0000000000000000029_003 | Dismissed | 2021-08-16T12:27:40+01:00 | 2021-03-09T13:33:00+00:00 | It is anticipated that Seagreen commissioning period will start 06/03/22 subject to the Offshore Substation being installed January 2022 and circuit 1 complete and commissioned by 06/03/22. Full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be 270MW available by the early Q2, 600MW by early Q3 2022 and the total capacity of 1075MW available by the end of 2022. As relevant details of the commissioning plans become firmer REMIT will be updated |
||||
Seagreen Wind Energy Ltd |
Other_0000000000000000029_002 | Dismissed | 2021-03-09T13:55:35+00:00 | 2021-03-09T13:33:00+00:00 | It is currently anticipated that Seagreen commissioning period will start on 01/12/2021 & full commercial operation will commence by the end of 2022. It is expected that over 2022 there will be a steady increase in installed capacity with approximately 270MW available by the end of Q1 2022, 600MW by the end of Q2 2022 and the total capacity of 1075MW available by the end of 2022.As relevant details of the commissioning plans become firmer REMIT will be updated. |
||||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_002 | Inactive | 2023-10-24T23:47:32+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_001 | Dismissed | 2023-10-24T22:39:53+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000040_002 | Inactive | 2022-08-26T09:01:54+01:00 | 2022-08-26T00:00:00+01:00 | 2022-08-26T08:00:00+01:00 | Foyers Power station dam is undergoing testing during the forthcoming station outage. In advance of the outage the water level will be raised to Top water level and this has the potential to incur pumping activity in the hours leading up to the outage. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000040_001 | Dismissed | 2022-08-17T16:13:32+01:00 | 2022-08-26T00:00:00+01:00 | 2022-08-26T08:00:00+01:00 | Foyers Power station dam is undergoing testing during the forthcoming station outage. In advance of the outage the water level will be raised to Top water level and this has the potential to incur pumping activity in the hours leading up to the outage. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_006 | Dismissed | 2021-05-31T17:01:14+01:00 | 2021-05-12T17:00:00+01:00 | 2021-08-20T23:00:00+01:00 | Update: Start date of non-firm TEC period changed to 17:00 on 12 May 2021. End date of 20 August 2021 remains unchanged. Original:We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_005 | Dismissed | 2021-05-10T13:01:06+01:00 | 2021-05-12T17:00:00+01:00 | 2021-08-20T23:00:00+01:00 | Update: Start date of non-firm TEC period changed to 17:00 on 12 May 2021. End date of 20 August 2021 remains unchanged. Original:We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_004 | Dismissed | 2021-05-05T20:53:41+01:00 | 2021-05-12T00:01:00+01:00 | 2021-08-20T23:59:00+01:00 | Update: Start date of non-firm TEC period changed to 12 May 2021. End date of 20 August 2021 remains unchanged. Original: We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_003 | Dismissed | 2021-05-04T10:57:17+01:00 | 2021-05-11T00:01:00+01:00 | 2021-08-20T23:59:00+01:00 | Update: Start date of non-firm TEC period changed to 11 May 2021. End date of 20 August 2021 remains unchanged. Original Remarks: We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_002 | Dismissed | 2021-04-20T11:44:37+01:00 | 2021-05-07T00:01:00+01:00 | 2021-08-20T23:59:00+01:00 | We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000031_001 | Dismissed | 2021-04-20T11:32:25+01:00 | 2021-05-07T00:01:00+01:00 | 2021-08-20T23:59:00+01:00 | We have been notified by National Grid ESO that, pending completion of network reinforcement works being conducted by SHETL in the nearby area, TEC in excess of 400MW at Peterhead Power Station will be non-firm in the period between 7 May 2021 and 20 August 2021. From time to time in this period, Peterhead’s output may be constrained by the limited availability of TEC. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000018_002 | Dismissed | 2019-04-19T12:04:54+01:00 | 2019-04-19T09:08:00+01:00 | SSE is currently experiencing a communication fault with National Grid, and are therefore unable to submit Physical Notifications. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000018_001 | Dismissed | 2019-04-19T09:10:02+01:00 | 2019-04-19T09:08:00+01:00 | SSE is currently experiencing a communication fault with National Grid, and are therefore unable to submit Physical Notifications. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000019_001 | Active | 2019-04-19T12:04:36+01:00 | 2019-04-19T12:03:00+01:00 | The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000017_002 | Dismissed | 2019-04-19T09:08:42+01:00 | 2019-04-18T19:00:00+01:00 | The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000017_001 | Dismissed | 2019-04-18T19:00:28+01:00 | 2019-04-18T19:00:00+01:00 | The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_003 | Active | 2017-12-19T12:08:01+00:00 | 2018-04-01T00:00:00+01:00 | Peterhead TEC has been increased to 1180MW on an enduring basis from 1st April 2018 and will continue operations at 1180MW going forward. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_002 | Dismissed | 2017-11-07T13:55:07+00:00 | 2018-04-01T00:00:00+01:00 | Subject to CMP268 not being legally challenged, we intend to increase TEC at Peterhead to 1180MW on an enduring basis commencing 1st April 2018 and continue operations at 1180MW going forward. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_001 | Dismissed | 2017-03-23T14:04:44+00:00 | 2018-04-01T00:00:00+01:00 | From the 1st April 2018 we will be reducing the TEC at Peterhead to zero. The cancellation of our TEC at this time is a risk mitigation measure to avoid a substantial cancellation charge if we were to cancel later in the year, once we have completed our review of the stations future, which we announced on 6 February 2017. We will reapply for TEC and subject to receiving a satisfactory offer from NGET, reinstate TEC should our review conclude that the station has an enduring future. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009280_001 | Active | 2024-07-26T12:31:39+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009279_001 | Active | 2024-07-26T12:31:36+01:00 | 2024-07-30T00:00:00+01:00 | 2026-05-01T00:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_005 | Inactive | 2024-07-23T10:47:32+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_004 | Dismissed | 2024-07-23T09:37:42+01:00 | 2023-05-10T08:47:00+01:00 | 2024-07-23T09:40:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Dismissed | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_002 | Dismissed | 2023-08-04T17:37:40+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE has agreed a preliminary works contract for this project with expected delivery Sept 24 GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_001 | Dismissed | 2023-05-10T08:49:10+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_002 | Inactive | 2024-05-24T16:25:24+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009108_001 | Dismissed | 2024-05-24T16:24:36+01:00 | 2024-05-24T00:00:00+01:00 | **** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_004 | Inactive | 2024-01-01T01:02:32+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_003 | Dismissed | 2023-02-28T10:01:18+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_002 | Dismissed | 2022-09-02T09:34:18+01:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_001 | Dismissed | 2022-09-01T16:31:20+01:00 | 2024-01-01T00:00:00+00:00 | 2030-01-01T00:00:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_004 | Dismissed | 2023-08-09T14:21:16+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_003 | Dismissed | 2023-08-09T14:15:15+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_002 | Dismissed | 2023-08-09T14:14:24+01:00 | 2023-08-09T14:09:00+01:00 | 2023-08-10T14:14:00+01:00 | This is a test message |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_001 | Dismissed | 2023-08-09T14:11:02+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_002 | Active | 2023-08-04T17:30:10+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_001 | Dismissed | 2023-05-10T08:50:25+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery GE as the instructed contractor will complete works at site Further contracts needed to facilitate this project continue to be negotiated |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008120_001 | Active | 2023-05-10T08:47:39+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008119_001 | Active | 2023-05-10T08:46:36+01:00 | 2023-05-10T08:43:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000007750_001 | Dismissed | 2022-12-01T11:33:28+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000007750_001 | Dismissed | 2022-12-01T11:36:04+00:00 | 2022-12-01T12:00:00+00:00 | 2022-12-01T12:01:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to Nordpool following SSE REMIT File Mover update.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_003 | Inactive | 2022-10-17T16:02:33+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_002 | Dismissed | 2022-10-17T14:46:02+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_001 | Dismissed | 2022-10-14T15:47:02+01:00 | 2022-10-14T15:35:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
|||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_002 | Inactive | 2024-04-23T01:02:47+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000008909_002 | Dismissed | 2024-03-05T15:33:12+00:00 | 2024-03-04T16:37:00+00:00 | Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead |