Last update at: 2024-05-17T23:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | |||||||||
Other_0000000000000008475_003 | Inactive | 2024-05-17T23:02:32+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
Other_0000000000000009072_002 | Inactive | 2024-05-17T23:02:32+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||||
Other_0000000000000009044_005 | Inactive | 2024-04-27T01:02:32+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_002 | Inactive | 2024-04-23T01:02:47+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
Other_0000000000000008908_004 | Inactive | 2024-03-18T01:02:32+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||||
Other_0000000000000008899_004 | Inactive | 2024-03-08T01:02:31+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||||
Great Island |
Great Island |
Other_0000000000000008845_002 | Inactive | 2024-02-13T14:47:42+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_004 | Inactive | 2024-01-01T01:02:32+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_002 | Inactive | 2023-11-22T01:02:36+00:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_002 | Inactive | 2023-10-24T23:47:32+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
Other_0000000000000007814_002 | Inactive | 2023-07-06T01:02:32+01:00 | 2022-12-22T17:39:00+00:00 | 2023-07-06T00:00:00+01:00 | Due to a failed Auxiliary transformer at Medway the capability for onload transition from 1 GT and 1 Steam Turbine (1+1) to 2 GT’s and 1 Steam turbine is no longer possible. It is expected this situation will be resolved during the summer outage in 2023 |
||||
Tawnaghmore |
TAWN1 |
Other_0000000000000008024_002 | Inactive | 2023-03-16T09:40:56+00:00 | 2027-03-16T09:39:00+00:00 | 2027-03-16T09:40:00+00:00 | ***TEST ONLY*** Testing publishing Other Market Information at Unit level |
||
Rhode |
RHODE1 |
Other_0000000000000008023_002 | Inactive | 2023-03-16T09:39:01+00:00 | 2027-03-16T09:37:00+00:00 | 2027-03-16T09:38:00+00:00 | ***TEST ONLY*** Testing publishing Other Market Information at Unit level |
||
Tarbert |
TB3 |
Other_0000000000000008022_002 | Inactive | 2023-03-16T09:36:20+00:00 | 2027-03-16T09:33:00+00:00 | 2027-03-16T09:34:00+00:00 | ***TEST ONLY*** Testing publishing Other Market Information at Unit level |
||
Great Island |
Great Island |
Other_0000000000000008021_002 | Inactive | 2023-03-15T13:51:41+00:00 | 2027-03-15T13:47:00+00:00 | 2027-03-15T13:48:00+00:00 | ***TEST ONLY*** Testing publishing Other Market Information at Unit level |
||
Great Island |
Great Island |
Other_0000000000000008020_002 | Inactive | 2023-03-15T12:11:38+00:00 | 2027-03-15T11:45:00+00:00 | 2027-03-15T11:46:00+00:00 | ***TEST ONLY*** Testing publishing Other Market Information at Unit level |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000030_005 | Inactive | 2023-03-15T10:02:32+00:00 | 2022-01-12T00:00:00+00:00 | 2023-03-15T09:00:00+00:00 | It is currently anticipated that Keadby 2 performance validation period which started on 12/01/2022 will finish on 15/03/2023. There will be periods of intermittent generation. As relevant details of the validation plans become firmer REMIT will be updated. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000042_003 | Inactive | 2022-10-17T16:02:33+01:00 | 2022-10-14T15:35:00+01:00 | 2022-10-17T14:48:00+01:00 | GI4 Great Island CCGT. Generator code 47W0000000001024. Emergent plant fault on auxiliary systems has resulted in an unreliable start-up. If unit is dispatched off, it may not be able to be restarted. If unit fails to restart a REMIT declaration will be made. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000040_002 | Inactive | 2022-08-26T09:01:54+01:00 | 2022-08-26T00:00:00+01:00 | 2022-08-26T08:00:00+01:00 | Foyers Power station dam is undergoing testing during the forthcoming station outage. In advance of the outage the water level will be raised to Top water level and this has the potential to incur pumping activity in the hours leading up to the outage. |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000037_002 | Inactive | 2021-05-22T00:01:53+01:00 | 2021-05-19T08:00:00+01:00 | 2021-05-21T23:00:00+01:00 | D-2 non-firm TEC Guidance issued: 0MW non-firm TEC from 08:00 on 19/05/2021 to 23:00 on 21/05/2021 (BST). |
||
SSE GENERATION |
48X000000000077M | Other_0000000000000000036_002 | Inactive | 2021-05-19T09:01:54+01:00 | 2021-05-17T08:00:00+01:00 | 2021-05-19T08:00:00+01:00 | D-2 non-firm TEC Guidance issued: 500MW non-firm TEC from 08:00 on 17/05/2021 to 08:00 on 19/05/2021 (BST). |
||
Great Island |
Great Island |
Other_0000000000000008475_002 | Dismissed | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+01:00 | 2023-10-02T17:05:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||
Great Island |
Great Island |
Other_0000000000000009072_001 | Dismissed | 2024-05-08T10:08:54+01:00 | 2024-05-17T07:00:00+01:00 | 2024-05-17T22:00:00+01:00 | For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009046_001 | Dismissed | 2024-04-25T12:04:26+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-21T23:00:00+01:00 | T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:49+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_005 | Dismissed | 2024-05-16T18:41:53+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_004 | Dismissed | 2024-05-16T18:36:19+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-16T18:37:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_003 | Dismissed | 2024-05-14T08:51:35+01:00 | 2024-05-14T23:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_002 | Dismissed | 2024-05-13T17:15:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running for post outage commissioning works. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000009081_001 | Dismissed | 2024-05-13T11:11:57+01:00 | 2024-05-15T08:00:00+01:00 | 2024-05-17T21:00:00+01:00 | T_PEHE-1 block running at circa 600MW for post outage commissioning works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Dismissed | 2024-04-14T22:58:55+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_004 | Dismissed | 2024-02-13T16:06:55+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_003 | Dismissed | 2023-02-10T11:57:40+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking |
48X000000000314Y | Other_0000000000000000039_002 | Dismissed | 2022-09-20T12:28:17+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_004 | Dismissed | 2024-04-25T10:49:47+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_003 | Dismissed | 2024-04-25T10:23:07+01:00 | 2024-04-26T00:00:00+01:00 | 2024-04-26T23:59:59+01:00 | Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_002 | Dismissed | 2024-04-25T09:44:41+01:00 | 2024-04-26T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024. |
||
Keadby |
T_KEAD-1 |
Other_0000000000000009044_001 | Dismissed | 2024-04-24T19:54:16+01:00 | 2024-04-25T00:00:00+01:00 | 2024-06-06T00:00:00+01:00 | Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+01:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |