SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-01-12T15:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
1 2 3 4 5 >
Other_0000000000000010648_002 Inactive 2025-10-30T19:02:32+00:00 2025-10-30T08:00:00+00:00 2025-10-30T18:00:00+00:00
On Thursday 30th October from 08:00 to 18:00, Keadby 1 is planning to trevi test safety valves on Boiler 1. This will require Keadby 1 to be running somewhere near MEL during this time.
Other_0000000000000010636_005 Inactive 2025-10-29T01:02:32+00:00 2025-10-27T23:00:00+00:00 2025-10-28T23:59:00+00:00
On 27th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing.
Other_0000000000000010636_003 Inactive 2025-10-30T01:02:32+00:00 2025-10-28T23:00:19+00:00 2025-10-29T23:59:48+00:00
On 28th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing.
Other_0000000000000010554_003 Inactive 2025-10-24T18:02:31+00:00 2025-10-16T08:00:00+00:00 2025-10-24T17:00:00+00:00
Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change.
Other_0000000000000010555_003 Inactive 2025-10-24T18:02:31+00:00 2025-10-16T08:00:00+00:00 2025-10-24T17:00:00+00:00
Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change.
Other_0000000000000010609_004 Inactive 2025-10-21T17:32:32+00:00 2025-10-20T08:00:43+00:00 2025-10-21T16:31:13+00:00
T_PEHE-1 running at 1180mw for testing purposes.
Other_0000000000000010607_002 Inactive 2025-10-16T15:02:32+00:00 2025-10-16T10:00:59+00:00 2025-10-16T14:00:34+00:00
T_PEHE-1 running at 1000MW for testing purposes
Other_0000000000000010591_002 Inactive 2025-10-14T21:02:31+00:00 2025-10-13T08:00:11+00:00 2025-10-14T20:00:21+00:00
T_PEHE-1 running at circa 620MW for commissioning purposes.
Other_0000000000000010556_003 Inactive 2025-10-10T17:32:32+00:00 2025-10-08T08:30:00+00:00 2025-10-10T16:30:00+00:00
Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 8th Oct. They'll be periods of inflexibility and slightly reduced load.
Other_0000000000000010561_003 Inactive 2025-10-02T22:02:32+00:00 2025-10-01T10:56:33+00:00 2025-10-02T21:00:44+00:00
Keadby 1 enters a period a hot commissioning following a planned outage. It may run outwith market conditions for periods to facilitate the completion of this task.
Other_0000000000000010465_002 Inactive 2025-09-29T00:02:32+00:00 2025-09-01T23:00:27+00:00 2025-09-28T23:00:44+00:00
T_PEHE-1. Auxiliary boiler out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000010543_002 Inactive 2025-09-26T13:02:32+00:00 2025-09-26T11:40:38+00:00 2025-09-26T12:00:59+00:00
A planned frequency response test will be taking place on BMU6. During this time MW output on BMU6 will fluctuate between 38MW and 358MW. Following 12:00hrs BMU6 will return to normal availability.
Other_0000000000000010516_002 Inactive 2025-09-21T01:02:32+00:00 2025-09-18T00:00:00+00:00 2025-09-20T23:59:59+00:00
Following a planned outage, Keadby 2 is in a commissioning phase prior to a return to commercial operation.
Other_0000000000000010509_002 Inactive 2025-09-20T01:02:32+00:00 2025-09-18T22:00:00+00:00 2025-09-19T23:59:55+00:00
2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2
Other_0000000000000010483_003 Inactive 2025-09-18T05:02:32+00:00 2025-09-16T17:00:00+00:00 2025-09-18T04:00:00+00:00
Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 36hr period prior to return to commercial service.
Other_0000000000000010477_002 Inactive 2025-09-12T20:02:32+00:00 2025-08-12T09:00:00+00:00 2025-09-12T19:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010478_002 Inactive 2025-09-12T10:02:32+00:00 2025-08-12T09:00:00+00:00 2025-09-12T09:00:00+00:00
Rhode PCP is currently unable to export due to transmission system Capex works and Eirgrid has confirmed that both RP1 and RP2 are outturn available until the issue is resolved. For the avoidance of doubt this means that the units are commercially available and can be traded into the market.
Other_0000000000000010037_004 Inactive 2025-09-02T00:02:31+00:00 2025-05-03T23:00:26+00:00 2025-09-01T23:00:44+00:00
T_PEHE-1. Auxiliary boiler being taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000010435_003 Inactive 2025-08-24T18:02:32+00:00 2025-08-20T17:14:21+00:00 2025-08-24T17:00:00+00:00
GI4 experienced a steam turbine fault. This fault is now being repaired
Other_0000000000000010389_002 Inactive 2025-08-01T18:02:33+00:00 2025-07-30T08:00:28+00:00 2025-08-01T17:00:41+00:00
PEHE-1 running at steady loads for commissioning.
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000009473_002 Inactive 2025-07-31T11:02:32+00:00 2024-09-27T09:18:00+00:00 2025-07-31T10:00:00+00:00
It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000010338_002 Inactive 2025-07-04T19:32:32+00:00 2025-07-04T08:00:00+00:00 2025-07-04T18:30:00+00:00
Please be advised that Grid Code testing is scheduled to take place. A significant reduction in MW output is expected at times during the test window due to system requirements and test conditions.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_004 Inactive 2025-06-30T15:02:32+00:00 2024-06-21T14:00:00+00:00 2025-06-30T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X
Other_0000000000000010134_004 Inactive 2025-06-30T13:02:32+00:00 2025-04-18T08:07:55+00:00 2025-06-30T12:00:00+00:00
Unavailability of 294MW at Beatrice Offshore Windfarm Limited at 2025-04-18 08:07:55 expected to last until 2025-08-29 12:00:00
Other_0000000000000010248_002 Inactive 2025-06-20T14:02:32+00:00 2025-06-20T09:00:00+00:00 2025-06-20T13:00:00+00:00
Foyer M1 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Other_0000000000000010247_002 Inactive 2025-06-18T14:02:32+00:00 2025-06-18T09:00:00+00:00 2025-06-18T13:00:00+00:00
Foyer M2 will be carrying out a 4 hour test run of generation capacity (150MW) as part of PDA testing, during this period pump capability will not be available. This information is disclosed in accordance with Article 4 of REMIT.
Other_0000000000000010283_002 Inactive 2025-06-16T18:02:32+00:00 2025-06-12T17:14:46+00:00 2025-06-16T17:00:49+00:00
Foyers M2 will remain out of service while restart assurance activities are completed following the post fault recommissioning of GT2. This information is disclosed in accordance with Article 4 of REMIT.
Other_0000000000000010249_007 Inactive 2025-06-10T04:02:32+00:00 2025-06-09T04:00:00+00:00 2025-06-10T03:00:00+00:00
Unit will be completing testing within the range of 165MW - 464MW following completion of Outage.
Other_0000000000000009284_007 Inactive 2025-06-10T04:02:32+00:00 2024-08-02T00:00:00+00:00 2025-06-10T03:00:00+00:00
Great Island is unavailable to run on oil due to plant fault.
Other_0000000000000010169_003 Inactive 2025-05-28T18:02:32+00:00 2025-05-28T13:15:00+00:00 2025-05-28T17:00:00+00:00
Other Market Information message withdrawn – site commissioning complete.
Other_0000000000000010152_002 Inactive 2025-05-23T00:02:32+00:00 2025-05-20T10:00:25+00:00 2025-05-22T23:00:37+00:00
Medway will be carrying out a full speed no load run on 20/05/2025. On completion NDZ value will increase to 720minutes until the start of our planned outage, 23:00 22/05/2025
Other_0000000000000010142_002 Inactive 2025-05-14T18:02:32+00:00 2025-05-12T16:00:00+00:00 2025-05-14T17:00:00+00:00
#Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude Q2 2025. Anticipated increase to 101MW on 14/05/2025
Other_0000000000000010099_004 Inactive 2025-05-10T01:02:32+00:00 2025-05-08T23:59:00+00:00 2025-05-09T23:59:00+00:00
For the last shutdown that is within 24 hours prior to the start of the planned outage with a commencement time of 23:59hrs on 09/05/2025, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000010123_002 Inactive 2025-05-10T01:02:32+00:00 2025-05-08T23:59:24+00:00 2025-05-10T00:00:56+00:00
T_PEHE-1 running out of merit in 2+1 configuration circa 780MW due to allow recovery from fuel supply issues.
Other_0000000000000009955_002 Inactive 2025-04-02T20:02:32+00:00 2025-03-06T17:02:01+00:00 2025-04-02T19:00:00+00:00
Keadby 2 will be operating with an hour’s restriction of circa 40% load factor, up to next planned outage 2nd April 2025.
Other_0000000000000009850_013 Inactive 2025-03-31T17:02:32+00:00 2025-01-27T09:25:54+00:00 2025-03-31T16:00:00+00:00
#Commissioning# Current capacity 86MW. Commissioning is scheduled to conclude early Q2 2025.
Other_0000000000000009887_002 Inactive 2025-02-07T10:02:32+00:00 2025-02-06T11:00:00+00:00 2025-02-07T09:00:00+00:00
Due to plant fault, unit currently cannot be restarted. REMIT entered for testing and repair works on Friday 7th of Feb 2025
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000009709_002 Inactive 2024-12-13T01:02:32+00:00 2024-12-06T12:55:00+00:00 2024-12-13T00:00:00+00:00
Yellow River Wind Farm is energised and will start generation upto 15MW from December 10th 2024.
SSE GENERATION
48X000000000077M
Other_0000000000000009704_006 Inactive 2024-12-10T10:02:32+00:00 2024-12-05T18:15:00+00:00 2024-12-10T09:00:00+00:00
It is expected that Strathy South Windfarm commissioning will start in Q2 2027
Other_0000000000000009640_003 Inactive 2024-12-10T01:02:32+00:00 2024-12-09T04:00:00+00:00 2024-12-10T00:00:00+00:00
Unit will be completing testing within the range of 165-464 following completion of STMO.
Other_0000000000000009626_002 Inactive 2024-12-03T23:02:32+00:00 2024-12-03T07:00:00+00:00 2024-12-03T22:00:00+00:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 03/12/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000009584_003 Inactive 2024-11-28T18:02:32+00:00 2024-10-31T10:00:00+00:00 2024-11-28T17:00:00+00:00
It is expected that Yellow River commissioning will start in December 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 101MW being available during Q1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000009256_008 Inactive 2024-08-01T04:02:32+00:00 2024-07-31T00:00:00+00:00 2024-08-01T03:00:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008121_005 Inactive 2024-07-23T10:47:32+00:00 2023-05-10T08:47:00+00:00 2024-07-23T09:40:00+00:00
As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market
Other_0000000000000009232_003 Inactive 2024-07-08T22:02:32+00:00 2024-07-08T08:00:00+00:00 2024-07-08T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009202_002 Inactive 2024-07-03T19:02:32+00:00 2024-07-03T13:00:00+00:00 2024-07-03T18:00:00+00:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Viking Energy Wind Farm LLP
48X000000000314Y
Other_0000000000000000039_010 Inactive 2024-07-01T13:02:32+00:00 2022-07-14T17:23:00+00:00 2024-07-01T12:00:00+00:00
Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From June 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from June 24 with an increase towards 300MW mid June 24 and will be subject to various factors including the progress on the HVDC link and associated works.
Other_0000000000000009139_003 Inactive 2024-06-07T13:02:32+00:00 2024-06-06T00:00:00+00:00 2024-06-07T12:00:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009127_004 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.