Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | |||||||||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_007 | Active | 2024-04-14T22:58:55+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From May 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from May 24 with an increase towards 300MW late May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Active | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Great Island |
Great Island |
Other_0000000000000008475_002 | Active | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008121_003 | Active | 2023-08-04T18:05:35+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update of Feb 23, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation. SSE has agreed a PWA for this project with expected delivery Sept 24. GE is the instructed contractor for the works at site. Further contracts to facilitate the project continue to be negotiated. As of Apr 23, the TSO has confirmed that this unit will operate outside the wholesale market |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_002 | Active | 2023-08-04T17:30:10+01:00 | 2023-05-10T08:49:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008120_001 | Active | 2023-05-10T08:47:39+01:00 | 2023-05-10T08:47:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008119_001 | Active | 2023-05-10T08:46:36+01:00 | 2023-05-10T08:43:00+01:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000024_001 | Active | 2019-06-13T12:30:13+01:00 | 2019-06-13T12:30:00+01:00 | Fiddler’s Ferry Units 2, 3 and 4 (BMU IDs: T_FIDL-2, T_FIDL-3, T_FIDL-4) are expected to close with effect from 31 March 2020. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000019_001 | Active | 2019-04-19T12:04:36+01:00 | 2019-04-19T12:03:00+01:00 | The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations |
|||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000000015_001 | Active | 2019-03-19T14:46:49+00:00 | 2019-03-19T12:55:00+00:00 | T_FIDL-1 - With immediate effect, unit 1 will be withdrawn from service. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_003 | Active | 2017-12-19T12:08:01+00:00 | 2018-04-01T00:00:00+01:00 | Peterhead TEC has been increased to 1180MW on an enduring basis from 1st April 2018 and will continue operations at 1180MW going forward. |
|||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000009038_001 | Dismissed | 2024-04-19T14:29:07+01:00 | 2024-04-22T00:01:00+01:00 | 2024-04-22T23:59:00+01:00 | Peterhead 12 hour on load run requested of GT 11 and 12 for preservation of plant during Monday 22nd of April 2024. |
||
Dogger Bank A |
48X0000000003113 | Other_0000000000000009040_001 | Dismissed | 2024-04-22T09:04:24+01:00 | 2024-04-19T09:00:00+01:00 | 2025-01-06T00:00:00+00:00 | Dogger Bank A is in the commissioning phase and it is expected that there will be a steady increase in installed capacity with c. 400MW available by the end of Q2 2024, c.800MW by the end of Q3 2024, c.1050MW by the end of Q4 2024 and the total capacity of 1.2GW available during Q1 2025. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_006 | Dismissed | 2024-04-03T10:47:47+01:00 | 2022-07-14T17:23:00+01:00 | 2024-07-01T12:00:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation from late April 24 with an increase towards 300MW in May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_005 | Dismissed | 2024-03-07T14:58:39+00:00 | 2022-07-14T17:23:00+01:00 | Its anticipated Viking Windfarm will be fully commissioned July 24, with over 400MW being exported to the Grid. From April 24 Viking will generate at the required level to commission the windfarm, to provide the power required to support commissioning of SSEN HVDC link. The commissioning profile will have low levels of generation until late April 24 with an increase towards 300MW in early May 24 and will be subject to various factors including the progress on the HVDC link and associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_004 | Dismissed | 2024-02-13T16:06:55+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. From April 2024 Viking will generate at the required MW levels to commission the windfarm to provide the power required to support commissioning of the SSEN HVDC link to the mainland. The commissioning profile of Viking will be subject to a number of factors, including the progress on the HVDC link as well as any associated works. |
|||
Viking Energy Wind Farm LLP |
48X000000000314Y | Other_0000000000000000039_003 | Dismissed | 2023-02-10T11:57:40+00:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking |
48X000000000314Y | Other_0000000000000000039_002 | Dismissed | 2022-09-20T12:28:17+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
|||
Viking Wind Farm |
Other_0000000000000000039_001 | Dismissed | 2022-07-14T17:25:58+01:00 | 2022-07-14T17:23:00+01:00 | It is anticipated that Viking Windfarm on Shetland will be fully commissioned by July 2024, with over 400MW being exported to the National Grid. It is likely that up to approximately 100MW will be available from April 2024. This is subject to a number of factors including weather conditions and the progress on the separate 600MW HVDC link project to Shetland, as well as any associated works |
||||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_003 | Dismissed | 2024-03-05T14:59:17+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_002 | Dismissed | 2024-02-29T14:00:58+00:00 | 2024-03-04T06:00:00+00:00 | 2024-03-07T23:59:00+00:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
Medway |
T_MEDP-1 |
Other_0000000000000008899_001 | Dismissed | 2024-02-29T13:41:02+00:00 | 2024-03-04T06:00:00+00:00 | 2024-04-04T23:59:00+01:00 | Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads. |
||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000008909_002 | Dismissed | 2024-03-05T15:33:12+00:00 | 2024-03-04T16:37:00+00:00 | Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead |
|||
SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | Other_0000000000000008909_001 | Dismissed | 2024-03-04T16:40:26+00:00 | 2024-03-04T16:37:00+00:00 | Subject to contract, discussions are ongoing with regards a multi-week 0MW contract at Peterhead. During the contract period there would be no output from Peterhead |
|||
Great Island |
Great Island |
Other_0000000000000008845_001 | Dismissed | 2024-02-13T14:42:10+00:00 | 2030-02-13T14:40:00+00:00 | 2030-02-13T14:41:00+00:00 | This is a test of SSE REMIT application functionality only. No action should be taken. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_003 | Dismissed | 2024-01-25T10:06:41+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_002 | Dismissed | 2024-01-23T14:55:33+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_001 | Dismissed | 2024-01-23T08:48:33+00:00 | 2024-01-22T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_003 | Dismissed | 2023-02-28T10:01:18+00:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the EPA, Tarbert is subject to a limitation on operating hours. Should these hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly. For the avoidance of doubt, all units at the station are required to close by 31st December 2023 at the latest under Condition 5.17 referenced above. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_002 | Dismissed | 2022-09-02T09:34:18+01:00 | 2022-09-01T00:00:00+01:00 | 2023-12-31T23:59:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_001 | Dismissed | 2022-09-01T16:31:20+01:00 | 2024-01-01T00:00:00+00:00 | 2030-01-01T00:00:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_001 | Dismissed | 2023-06-07T16:31:26+01:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_001 | Dismissed | 2023-10-24T22:39:53+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_039 | Dismissed | 2023-10-07T21:51:29+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | Other market information message withdrawn with first generation achieved 07/10/23 All REMIT submitted by BMU on SSE Remit portal. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_038 | Dismissed | 2023-10-06T16:23:25+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_037 | Dismissed | 2023-10-06T15:46:32+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_036 | Dismissed | 2023-10-06T15:08:54+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_035 | Dismissed | 2023-10-05T16:49:11+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_034 | Dismissed | 2023-10-03T16:16:32+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T07:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_033 | Dismissed | 2023-10-03T11:39:12+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-03T20:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_032 | Dismissed | 2023-10-03T07:08:50+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-03T12:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_031 | Dismissed | 2023-10-02T08:51:38+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-03T07:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_030 | Dismissed | 2023-10-01T17:10:08+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-03T07:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_029 | Dismissed | 2023-09-30T16:22:05+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-02T07:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 02nd OCT 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_028 | Dismissed | 2023-09-29T16:49:18+01:00 | 2023-07-18T13:30:00+01:00 | 2023-09-30T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 30th Sept 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_027 | Dismissed | 2023-09-28T14:32:16+01:00 | 2023-07-18T13:30:00+01:00 | 2023-09-29T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 29th Sept 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.25MW available by the end of Q3 2023, c.300MW by the end of Q4 2023, c.575MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |