| Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| 1 2 3 4 5 > | |||||||||
Glendoe |
T_GLNDO-1 |
Other_0000000000000010699_001 | Active | 2025-11-24T15:24:17+00:00 | 2025-11-25T08:30:00+00:00 | 2025-11-27T16:30:00+00:00 | There will be intermittent generation at Glendoe (GLNDO-1), 0830-1630 on 25th & 27th, 0730-1930 on 26th, controlled under a Maximum Export Limit, all of which is part of testing and commissioning of plant. The timing of generation output is uncertain but is not expected to exceed 60 mins during each test run on 25th & 27th. On 26th test run will last 12 hours. Glendoe will be REMIT'd to Zero across from 25-27th Nov. |
||
SSE Airtricity Limited |
23X--140207ALT-9 | Other_0000000000000010696_001 | Active | 2025-11-22T11:27:06+00:00 | 2025-11-22T11:25:00+00:00 | 2027-02-28T11:25:00+00:00 | It is expected that Drumnahough commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 58MW being available during Q4 2027. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
| Other_0000000000000010656_002 | Active | 2025-11-04T19:13:10+00:00 | 2025-11-24T08:00:00+00:00 | 2025-11-28T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 24/11/2025 (08:00) to 28/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
| Other_0000000000000010655_002 | Active | 2025-11-04T19:11:31+00:00 | 2025-11-24T08:00:00+00:00 | 2025-11-28T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 24/11/2025 (08:00) to 28/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000010455_001 | Active | 2025-08-29T13:38:33+00:00 | 2025-08-29T13:35:00+00:00 | 2026-03-31T16:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2026. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000010415_002 | Active | 2025-08-29T13:29:23+00:00 | 2025-08-08T11:05:15+00:00 | 2025-12-31T16:00:00+00:00 | • Dogger Bank A is currently in the commissioning phase, with 832MW of installed capacity as at 31 July 2025. It is expected that there will be a steady increase in installed capacity with installation expected to complete by the end of 2025 and the total capacity of 1.2 GW being substantially all available by the end of Q4 2025. |
||
SSE Ferrybridge Battery Limited |
48X000000000382H | Other_0000000000000010438_001 | Active | 2025-08-21T10:21:58+00:00 | 2025-08-21T10:30:00+00:00 | 2025-12-19T10:00:00+00:00 | It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
| Other_0000000000000009990_001 | Active | 2025-03-14T13:00:47+00:00 | 2025-03-14T12:30:39+00:00 | Site is not yet operational but is agreed to be available for emergency dispatch if instructed by EirGrid in line with CRU202346 |
|||||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000009881_001 | Active | 2025-02-04T09:55:51+00:00 | 2025-02-04T09:55:38+00:00 | Tarbert Next Generation biofuel station GU_405790 has now moved to enabling works ahead of construction and commissioning. Planned completion is expected by end of 2027. The unit has received an extension to key CRM milestones from the CRU. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008122_002 | Active | 2023-08-04T17:30:10+00:00 | 2023-05-10T08:49:00+00:00 | As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008120_001 | Active | 2023-05-10T08:47:39+00:00 | 2023-05-10T08:47:00+00:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008119_001 | Active | 2023-05-10T08:46:36+00:00 | 2023-05-10T08:43:00+00:00 | As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated. |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000019_001 | Active | 2019-04-19T12:04:36+00:00 | 2019-04-19T12:03:00+00:00 | The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations |
|||
SSE GENERATION |
48X000000000077M | Other_0000000000000000006_003 | Active | 2017-12-19T12:08:01+00:00 | 2018-04-01T00:00:00+00:00 | Peterhead TEC has been increased to 1180MW on an enduring basis from 1st April 2018 and will continue operations at 1180MW going forward. |
|||
SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | Other_0000000000000010697_002 | Dismissed | 2025-11-24T13:34:11+00:00 | 2025-11-24T13:30:00+00:00 | 2025-11-24T13:35:00+00:00 | Test message for Derrymeen BESS. |
||
SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | Other_0000000000000010697_001 | Dismissed | 2025-11-24T13:31:07+00:00 | 2025-11-24T13:30:00+00:00 | 2025-11-24T13:35:00+00:00 | Test message for Derrymeen BESS. |
||
| Other_0000000000000010656_001 | Dismissed | 2025-10-29T20:30:13+00:00 | 2025-11-10T08:00:00+00:00 | 2025-11-14T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 10/11/2025 (08:00) to 14/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
| Other_0000000000000010655_001 | Dismissed | 2025-10-29T20:20:38+00:00 | 2025-11-10T08:00:00+00:00 | 2025-11-14T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 10/11/2025 (08:00) to 14/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
| Other_0000000000000010648_001 | Dismissed | 2025-10-28T13:37:15+00:00 | 2025-10-30T08:00:00+00:00 | 2025-10-30T18:00:00+00:00 | On Thursday 30th October from 08:00 to 18:00, Keadby 1 is planning to trevi test safety valves on Boiler 1. This will require Keadby 1 to be running somewhere near MEL during this time. |
||||
| Other_0000000000000010636_004 | Dismissed | 2025-10-27T14:44:07+00:00 | 2025-10-27T23:00:00+00:00 | 2025-10-28T23:59:00+00:00 | On 27th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010636_003 | Dismissed | 2025-10-27T14:40:46+00:00 | 2025-10-27T23:00:00+00:00 | 2025-10-28T23:59:00+00:00 | On 28th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010636_002 | Dismissed | 2025-10-27T09:08:52+00:00 | 2025-10-28T23:00:19+00:00 | 2025-10-29T23:59:48+00:00 | On 28th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010636_002 | Dismissed | 2025-10-27T09:08:58+00:00 | 2025-10-28T23:00:19+00:00 | 2025-10-29T23:59:48+00:00 | On 28th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010636_001 | Dismissed | 2025-10-22T11:59:24+00:00 | 2025-10-27T23:00:19+00:00 | 2025-10-28T23:59:48+00:00 | On 27th October Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010554_002 | Dismissed | 2025-10-16T09:49:03+00:00 | 2025-10-16T08:00:00+00:00 | 2025-10-24T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
| Other_0000000000000010554_001 | Dismissed | 2025-09-29T17:40:08+00:00 | 2025-10-16T08:00:00+00:00 | 2025-10-24T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010555_002 | Dismissed | 2025-10-16T09:50:21+00:00 | 2025-10-16T08:00:00+00:00 | 2025-10-24T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change. |
||||
| Other_0000000000000010555_001 | Dismissed | 2025-09-29T17:46:48+00:00 | 2025-10-16T08:00:00+00:00 | 2025-10-24T17:00:00+00:00 | Rhode PCP will be unable to export due to transmission system Capex works from 16/10/2025 (08:00) to 24/10/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. |
||||
| Other_0000000000000010609_003 | Dismissed | 2025-10-21T14:30:23+00:00 | 2025-10-20T08:00:43+00:00 | 2025-10-21T16:31:13+00:00 | T_PEHE-1 running at 1180mw for testing purposes. |
||||
| Other_0000000000000010609_002 | Dismissed | 2025-10-18T10:47:17+00:00 | 2025-10-20T08:00:43+00:00 | 2025-10-21T18:00:13+00:00 | T_PEHE-1 running at 1180mw for testing purposes. |
||||
| Other_0000000000000010609_001 | Dismissed | 2025-10-16T16:00:27+00:00 | 2025-10-21T08:00:43+00:00 | 2025-10-22T18:00:13+00:00 | T_PEHE-1 running at 1180mw for testing purposes. |
||||
| Other_0000000000000010625_002 | Dismissed | 2025-10-20T08:54:50+00:00 | 2025-10-20T00:00:00+00:00 | 2025-10-20T23:59:59+00:00 | On 20th Oct Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010625_001 | Dismissed | 2025-10-19T09:37:54+00:00 | 2025-10-20T00:00:00+00:00 | 2025-10-20T23:59:59+00:00 | On 20th Oct Keadby 1 Power Station will run a reduced MZT and increased SEL to facilitate post outage recommissioning testing. |
||||
| Other_0000000000000010607_001 | Dismissed | 2025-10-15T09:01:29+00:00 | 2025-10-16T10:00:59+00:00 | 2025-10-16T14:00:34+00:00 | T_PEHE-1 running at 1000MW for testing purposes |
||||
| Other_0000000000000010591_001 | Dismissed | 2025-10-10T10:57:16+00:00 | 2025-10-13T08:00:11+00:00 | 2025-10-14T20:00:21+00:00 | T_PEHE-1 running at circa 620MW for commissioning purposes. |
||||
| Other_0000000000000010579_003 | Dismissed | 2025-10-11T16:29:41+00:00 | 2025-10-06T13:00:32+00:00 | 2025-10-12T23:00:43+00:00 | T_PEHE-1 Auxiliary boiler being taken out of service for repair to instrumentation. While out of service block will be inflexible following shutdown, as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without aux steam supply |
||||
| Other_0000000000000010579_002 | Dismissed | 2025-10-10T13:04:33+00:00 | 2025-10-06T13:00:32+00:00 | 2025-10-12T23:00:43+00:00 | T_PEHE-1 Auxiliary boiler being taken out of service for repair to instrumentation. While out of service block will be inflexible following shutdown, as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without aux steam supply |
||||
| Other_0000000000000010579_001 | Dismissed | 2025-10-06T12:28:16+00:00 | 2025-10-06T13:00:32+00:00 | 2025-10-10T23:00:43+00:00 | T_PEHE-1 Auxiliary boiler being taken out of service for repair to instrumentation. While out of service block will be inflexible following shutdown, as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without aux steam supply |
||||
| Other_0000000000000010556_002 | Dismissed | 2025-10-06T08:48:13+00:00 | 2025-10-08T08:30:00+00:00 | 2025-10-10T16:30:00+00:00 | Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 8th Oct. They'll be periods of inflexibility and slightly reduced load. |
||||
| Other_0000000000000010556_001 | Dismissed | 2025-09-30T14:56:12+00:00 | 2025-10-06T08:30:00+00:00 | 2025-10-08T16:30:00+00:00 | Keadby 2 will be completing statutory pressure parts onload testing over 3 days starting 6th Oct. They'll be periods of inflexibility and slightly reduced load. |
||||
| Other_0000000000000010561_002 | Dismissed | 2025-10-01T11:00:01+00:00 | 2025-10-01T10:56:33+00:00 | 2025-10-02T21:00:44+00:00 | Keadby 1 enters a period a hot commissioning following a planned outage. It may run outwith market conditions for periods to facilitate the completion of this task. |
||||
| Other_0000000000000010561_001 | Dismissed | 2025-10-01T10:59:39+00:00 | 2025-10-01T10:56:33+00:00 | 2025-10-02T21:00:44+00:00 | Keadby 1 enters a period a hot commissioning following a planned outage. A may run outwith market conditions for periods to facilitate the completion of this task. |
||||
| Other_0000000000000010465_001 | Dismissed | 2025-09-05T09:55:20+00:00 | 2025-09-01T23:00:27+00:00 | 2025-09-28T23:00:44+00:00 | T_PEHE-1. Auxiliary boiler out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam. |
||||
Seagreen |
T_SGRWO-6 |
Other_0000000000000010543_001 | Dismissed | 2025-09-23T16:16:20+00:00 | 2025-09-26T11:40:38+00:00 | 2025-09-26T12:00:59+00:00 | A planned frequency response test will be taking place on BMU6. During this time MW output on BMU6 will fluctuate between 38MW and 358MW. Following 12:00hrs BMU6 will return to normal availability. |
||
| Other_0000000000000010516_001 | Dismissed | 2025-09-18T10:06:01+00:00 | 2025-09-18T00:00:00+00:00 | 2025-09-20T23:59:59+00:00 | Following a planned outage, Keadby 2 is in a commissioning phase prior to a return to commercial operation. |
||||
| Other_0000000000000010509_001 | Dismissed | 2025-09-16T16:52:24+00:00 | 2025-09-18T22:00:00+00:00 | 2025-09-19T23:59:55+00:00 | 2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2 |
||||
| Other_0000000000000010483_002 | Dismissed | 2025-09-11T10:30:16+00:00 | 2025-09-16T17:00:00+00:00 | 2025-09-18T04:00:00+00:00 | Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 36hr period prior to return to commercial service. |
||||
| Other_0000000000000010483_001 | Dismissed | 2025-09-11T10:29:06+00:00 | 2025-09-16T17:00:00+00:00 | 2025-09-18T04:00:00+00:00 | Following completion of it's planned outage, Keadby 2 Power Station will be performing a hot recommissioning program over an indicative 48hr period prior to return to commercial service. |
||||
| Other_0000000000000010484_002 | Dismissed | 2025-09-15T19:21:26+00:00 | 2025-09-16T22:00:00+00:00 | 2025-09-17T23:59:00+00:00 | 2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2. |
||||
| Other_0000000000000010484_001 | Dismissed | 2025-09-11T10:37:18+00:00 | 2025-09-16T22:00:00+00:00 | 2025-09-17T23:59:00+00:00 | 2+1 on load run at MEL is required to carry out statutory safety valve testing on HRSG 1+2. |
||||