SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-02-02T16:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
1 2 3 4 5 >
SSE GENERATION
48X000000000077M
Other_0000000000000010835_002 Active 2026-02-02T16:26:59+00:00 2026-01-30T16:30:00+00:00 2026-02-05T12:00:00+00:00
Due to low reservoir levels at the Sloy scheme, current forecasts indicate that, if conditions continue, remaining available water may be fully utilised pending further inflow. This is expected to result in an aggregate unavailability of 152.5 MW across BMUs M_SLOY 1, T_SLOY 2, T_SLOY 3 and M_SLOY 4, which will be confirmed by MEL submissions.
Yellow River
Yellow River
Other_0000000000000010821_002 Active 2026-01-27T13:14:15+00:00 2026-01-27T10:00:00+00:00 2026-01-27T13:14:00+00:00
Generator Compliance Test (Yellow River WFPS) is expected to commence on 27th of January 2026. During the test, site output may vary between 0–101 MW
Glendoe
T_GLNDO-1
Other_0000000000000010818_001 Active 2026-01-23T16:36:17+00:00 2026-01-26T16:00:00+00:00 2026-01-26T20:00:00+00:00
There is generation testing required at Glendoe (GLNDO-1)on 26th January 16:00 - 20:00.
Foyers
T_FOYE-2
Other_0000000000000010804_004 Active 2026-01-20T16:38:01+00:00 2026-01-21T16:00:00+00:00 2026-01-21T20:00:00+00:00
There is generation testing required at Foyers (FOYE-2) on 21st January 16:00 - 20:00.
Foyers
T_FOYE-1
Other_0000000000000010803_004 Active 2026-01-19T13:23:09+00:00 2026-01-20T16:00:00+00:00 2026-01-20T20:00:00+00:00
There is testing required at Foyers (FOYE-1) on 20th January 16:00 - 20:00.
Yellow River
Yellow River
Other_0000000000000010801_001 Active 2026-01-12T15:02:20+00:00 2026-01-14T08:00:00+00:00 2026-01-14T18:30:00+00:00
Generator Compliance Test (Yellow River WFPS) is expected to commence on 14th of January 2026. During the test, site output may vary between 0–101 MW.
Hadyard Hill
T_HADHW-1
Other_0000000000000010783_002 Active 2026-01-09T15:18:25+00:00 2025-12-19T09:30:00+00:00 2026-03-31T17:00:00+00:00
We are currently experiencing a technical issue at Hadyard Hill Wind Farm, resulting in the site either running at a reduced output or not exporting to the grid. The issue is under investigation, and this notice will be updated as soon as further information becomes available.
SSE Fiddlers Ferry Ltd
48X0000000003966
Other_0000000000000010781_001 Active 2025-12-18T08:46:56+00:00 2025-12-18T08:45:00+00:00 2026-09-04T15:00:00+00:00
Fiddlers Ferry BESS is planned to be energised October 2026 and will commence commissioning during January 2027. Further updates will be published when firm information is available.
SSE Airtricity Energy Supply (NI) Ltd
47X0000000001920
Other_0000000000000010775_001 Active 2025-12-16T14:05:33+00:00 2025-12-16T14:00:00+00:00 2027-06-01T14:00:43+00:00
Derrymeen BESS is planned to be energised June 2027 and will commence commissioning during July 2027. Full commercial operations with 100MW capacity is anticipated September 2027. Further updates will be published when firm information is available
Doggerbank Offshore Wind Farm Project 2 Projco Limited
48X0000000003121
Other_0000000000000010455_002 Active 2025-12-11T08:53:56+00:00 2025-08-29T13:35:00+00:00 2026-12-31T16:00:00+00:00
It is expected that Dogger Bank B commissioning will start in Q1 2026. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available for generation during H1 2027. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000010415_003 Active 2025-12-11T08:52:00+00:00 2025-08-08T11:05:15+00:00 2026-07-01T16:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with 90 out of 95 turbines installed as at 30 November 2025. Installation is expected to complete by the end of December 2025. As at 30 November 2025 approximately 700MW was available and a steady increase is forecast, with the total capacity of 1.2GW being substantially available for generation by the end of Q2 2026. As commissioning progresses the available capacity will continue to be updated within the notices of unavailability on REMIT.
Hadyard Hill
T_HADHW-1
Other_0000000000000010767_002 Active 2025-12-10T13:21:06+00:00 2025-12-10T12:32:00+00:00 2026-01-31T17:00:00+00:00
We are currently experiencing a technical issue at Hadyard Hill Wind Farm, resulting in the site being unable to generate or export electricity to the grid. The issue is under investigation, and this notice will be updated as soon as further information becomes available.
Glendoe
T_GLNDO-1
Other_0000000000000010699_001 Active 2025-11-24T15:24:17+00:00 2025-11-25T08:30:00+00:00 2025-11-27T16:30:00+00:00
There will be intermittent generation at Glendoe (GLNDO-1), 0830-1630 on 25th & 27th, 0730-1930 on 26th, controlled under a Maximum Export Limit, all of which is part of testing and commissioning of plant. The timing of generation output is uncertain but is not expected to exceed 60 mins during each test run on 25th & 27th. On 26th test run will last 12 hours. Glendoe will be REMIT'd to Zero across from 25-27th Nov.
SSE Airtricity Limited
23X--140207ALT-9
Other_0000000000000010696_001 Active 2025-11-22T11:27:06+00:00 2025-11-22T11:25:00+00:00 2027-02-28T11:25:00+00:00
It is expected that Drumnahough commissioning will start in Q2 2027. It is expected that there will be a steady increase in installed capacity through to the total capacity of 58MW being available during Q4 2027. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000010656_002 Active 2025-11-04T19:13:10+00:00 2025-11-24T08:00:00+00:00 2025-11-28T17:00:00+00:00
Rhode PCP will be unable to export due to transmission system Capex works from 24/11/2025 (08:00) to 28/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change.
Other_0000000000000010655_002 Active 2025-11-04T19:11:31+00:00 2025-11-24T08:00:00+00:00 2025-11-28T17:00:00+00:00
Rhode PCP will be unable to export due to transmission system Capex works from 24/11/2025 (08:00) to 28/11/2025 (17:00). Eirgrid have confirmed that both RP1 and RP2 are outturn available for the duration of this outage. For the avoidance of doubt this means that the units are commercially available and can be traded into the market. Dates / times of this outage are subject to the discretion of the TSO and may change.
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010438_001 Active 2025-08-21T10:21:58+00:00 2025-08-21T10:30:00+00:00 2025-12-19T10:00:00+00:00
It is expected that Ferrybridge BESS commissioning will start in August 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 150MW being available during Q4 2025. As relevant details of the commissioning plans become firmer REMIT will be updated
Other_0000000000000009990_001 Active 2025-03-14T13:00:47+00:00 2025-03-14T12:30:39+00:00
Site is not yet operational but is agreed to be available for emergency dispatch if instructed by EirGrid in line with CRU202346
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009881_001 Active 2025-02-04T09:55:51+00:00 2025-02-04T09:55:38+00:00
Tarbert Next Generation biofuel station GU_405790 has now moved to enabling works ahead of construction and commissioning. Planned completion is expected by end of 2027. The unit has received an extension to key CRM milestones from the CRU.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008122_002 Active 2023-08-04T17:30:10+00:00 2023-05-10T08:49:00+00:00
As outlined in the CRU Security of Supply update published in February 2023 Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply SSE has agreed a preliminary works contract for this project with expected delivery September, 24. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008120_001 Active 2023-05-10T08:47:39+00:00 2023-05-10T08:47:00+00:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000008119_001 Active 2023-05-10T08:46:36+00:00 2023-05-10T08:43:00+00:00
As outlined in the CRU Security of Supply update published in February 2023, Tarbert is a designated site for the installation of up to 160MW of temporary emergency generation to support security of supply. SSE have now agreed a preliminary works contract for this project to allow it to progress to targeted delivery. GE as the instructed contractor will complete works at site. Further contracts needed to facilitate this project continue to be negotiated.
SSE GENERATION
48X000000000077M
Other_0000000000000000019_001 Active 2019-04-19T12:04:36+00:00 2019-04-19T12:03:00+00:00
The communication fault between SSE & National Grid has now been resolved and we have returned to normal business operations
SSE GENERATION
48X000000000077M
Other_0000000000000000006_003 Active 2017-12-19T12:08:01+00:00 2018-04-01T00:00:00+00:00
Peterhead TEC has been increased to 1180MW on an enduring basis from 1st April 2018 and will continue operations at 1180MW going forward.
SSE GENERATION
48X000000000077M
Other_0000000000000010835_001 Dismissed 2026-01-30T16:27:00+00:00 2026-01-30T16:30:00+00:00 2026-02-03T08:00:00+00:00
Due to low reservoir levels at the Sloy scheme, current forecasts indicate that, if conditions continue, remaining available water may be fully utilised pending further inflow. This is expected to result in an aggregate unavailability of 152.5 MW across BMUs M_SLOY 1, T_SLOY 2, T_SLOY 3 and M_SLOY 4, which will be confirmed by MEL submissions.
Yellow River
Yellow River
Other_0000000000000010794_001 Dismissed 2026-01-06T16:49:53+00:00 2026-01-29T10:00:00+00:00 2026-01-29T16:00:00+00:00
Generator Testing - Yellow River WFPS: Reactive Power Capability expected to commence on 29 January. During the test, site output may vary between 0 MW and full resource availability.
Yellow River
Yellow River
Other_0000000000000010821_001 Dismissed 2026-01-26T10:03:08+00:00 2026-01-27T10:00:00+00:00 2026-01-27T16:00:00+00:00
Generator Compliance Test (Yellow River WFPS) is expected to commence on 27th of January 2026. During the test, site output may vary between 0–101 MW
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010817_002 Dismissed 2026-01-22T17:44:06+00:00 2026-01-22T17:39:00+00:00 2026-01-22T17:45:00+00:00
Test Message for Monk Fryston Market Participant level
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010817_001 Dismissed 2026-01-22T17:40:39+00:00 2026-01-22T17:39:00+00:00 2026-01-22T17:45:00+00:00
Test Message for Monk Fryston Market Participant level
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010814_002 Dismissed 2026-01-22T17:39:31+00:00 2026-01-22T17:20:00+00:00 2026-01-22T17:25:00+00:00
Test message for Monk Fryston
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010814_001 Dismissed 2026-01-22T17:18:04+00:00 2026-01-22T17:20:00+00:00 2026-01-22T17:25:00+00:00
Test message for Monk Fryston
Monk Fryston
T_MKFRB-1
Other_0000000000000010816_002 Dismissed 2026-01-22T17:39:24+00:00 2026-01-22T17:26:00+00:00 2026-01-22T17:30:00+00:00
Test Messagefor Monk Fryston as BM
Monk Fryston
T_MKFRB-1
Other_0000000000000010816_001 Dismissed 2026-01-22T17:27:40+00:00 2026-01-22T17:26:00+00:00 2026-01-22T17:30:00+00:00
Test Messagefor Monk Fryston as BM
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010815_002 Dismissed 2026-01-22T17:26:43+00:00 2026-01-22T17:25:00+00:00 2026-01-22T17:30:00+00:00
Test Message 2 for MONK Fryston BESS
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010815_001 Dismissed 2026-01-22T17:26:07+00:00 2026-01-22T17:25:00+00:00 2026-01-22T17:30:00+00:00
Test Message 2 for MONK Fryston BESS
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010812_002 Dismissed 2026-01-22T11:48:21+00:00 2026-01-31T12:00:29+00:00 2026-01-31T12:01:49+00:00
Test Message
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010812_001 Dismissed 2026-01-22T11:39:55+00:00 2026-01-31T12:00:29+00:00 2026-01-31T12:01:49+00:00
Test Message
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010811_002 Dismissed 2026-01-22T11:35:55+00:00 2026-01-31T12:00:29+00:00 2026-01-31T12:01:39+00:00
Test message for Ferrybridge BESS BMU1
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010811_001 Dismissed 2026-01-22T11:34:50+00:00 2026-01-31T12:00:29+00:00 2026-01-31T12:01:39+00:00
Test message for Ferrybridge BESS BMU1
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010810_002 Dismissed 2026-01-22T11:03:17+00:00 2026-01-31T11:00:46+00:00 2026-01-31T11:01:05+00:00
Test message Ferrybridge BESS BMU-1
SSE Ferrybridge Battery Limited
48X000000000382H
Other_0000000000000010810_001 Dismissed 2026-01-22T10:52:37+00:00 2026-01-31T11:00:46+00:00 2026-01-31T11:01:05+00:00
Test message Ferrybridge BESS BMU-1
Yellow River
Yellow River
Other_0000000000000010805_002 Dismissed 2026-01-21T14:12:01+00:00 2026-01-21T09:00:00+00:00 2026-01-21T16:30:00+00:00
Generator Compliance Test (Yellow River WFPS) is expected to commence on 21st of January 2026. During the test, site output may vary between 0–101 MW.
Yellow River
Yellow River
Other_0000000000000010805_001 Dismissed 2026-01-19T16:58:07+00:00 2026-01-21T09:00:00+00:00 2026-01-21T16:30:00+00:00
Generator Compliance Test (Yellow River WFPS) is expected to commence on 21st of January 2026. During the test, site output may vary between 0–101 MW.
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010809_002 Dismissed 2026-01-21T11:58:40+00:00 2026-01-21T11:45:00+00:00 2026-01-21T12:00:00+00:00
Test message for Monk Fryston BESS
SSE Battery Monk Fryston Limited
48X0000000004020
Other_0000000000000010809_001 Dismissed 2026-01-21T11:45:00+00:00 2026-01-21T11:45:00+00:00 2026-01-21T12:00:00+00:00
Test message for Monk Fryston BESS
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010808_003 Dismissed 2026-01-21T11:42:49+00:00 2026-01-21T11:30:00+00:00 2026-01-21T12:30:00+00:00
Test Message for Ferrybridge BESS BMU 1
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010808_002 Dismissed 2026-01-21T11:39:35+00:00 2026-01-21T11:30:00+00:00 2026-01-21T12:30:00+00:00
Test Message for Ferrybridge BESS BMU 1
Ferrybridge Battery
T_FERRB-1
Other_0000000000000010808_001 Dismissed 2026-01-21T11:38:50+00:00 2026-01-21T11:30:00+00:00 2026-01-21T12:30:00+00:00
Test Message for Dogger Bank BMU 1
Foyers
T_FOYE-2
Other_0000000000000010804_003 Dismissed 2026-01-19T12:24:37+00:00 2026-01-22T06:00:00+00:00 2026-01-22T18:00:00+00:00
There is generation testing required at Foyers (FOYE-2) on 22nd January 06:00 - 10:00.
Foyers
T_FOYE-2
Other_0000000000000010804_002 Dismissed 2026-01-19T12:22:17+00:00 2026-01-22T06:00:00+00:00 2026-01-22T18:00:00+00:00
There is testing required at Foyers (FOYE-2) on 21st January 06:00 - 18:00. The timing of the generation output is uncertain but is not expected to exceed 4 hours.