Last update at: 2024-10-31T10:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Market Participant | Market Participant Code | Unit Location | Unit Name | Message ID | Event Status | Publication Date | Event Start | Event Stop | Remarks |
---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | |||||||||
Other_0000000000000008908_004 | Inactive | 2024-03-18T01:02:32+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_003 | Dismissed | 2024-03-08T11:26:43+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 4-5 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_002 | Dismissed | 2024-03-05T14:03:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified (anticipated to be 2-3 days work). |
||
Keadby |
T_KEAD-2 |
Other_0000000000000008908_001 | Dismissed | 2024-03-04T13:13:31+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-18T00:00:00+00:00 | SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000007786_001 | Dismissed | 2022-12-21T11:51:24+00:00 | 2024-03-01T14:02:00+00:00 | 2024-03-01T14:03:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to NG / Elexon following SSE REMIT File Mover update.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000007786_001 | Dismissed | 2022-12-19T14:04:00+00:00 | 2024-03-01T14:02:00+00:00 | 2024-03-01T14:03:00+00:00 | **Please ignore this Message** This is a test of auto transfer from SSE REMIT to NG / Elexon following SSE REMIT File Mover update.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_001 | Dismissed | 2024-01-23T08:48:33+00:00 | 2024-01-22T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_003 | Dismissed | 2024-01-25T10:06:41+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008783_002 | Dismissed | 2024-01-23T14:55:33+00:00 | 2024-01-16T00:00:00+00:00 | 2024-06-29T00:00:00+01:00 | Kead-2 is subject to an ongoing restriction meaning that following 5 starts the unit will require a period of unavailability.
The date and duration of the unavailability will be reflected in a separate REMIT notification when known. While onload after the 5th start the unit will remain available therefore the start time of the period of unavailability will be determined when the unit is brought below SEL.
|
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000000041_001 | Dismissed | 2022-09-01T16:31:20+01:00 | 2024-01-01T00:00:00+00:00 | 2030-01-01T00:00:00+00:00 | Under Condition 5.17 of the Industrial Emissions Licence granted to Tarbert Generating Station (“Tarbert”) by the Environmental Protection Agency, Tarbert is subject to a limitation on operating hours. Tarbert currently has approximately 3000 running hours remaining for Units 3 and 4 combined. Should these running hours be exhausted before 31st December 2023, Units 3 and 4 will no longer be available to run and any REMIT notifications will be updated accordingly |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_002 | Inactive | 2023-11-22T01:02:36+00:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
KEADBY GEN. LTD |
48X000000000073U | Other_0000000000000008178_001 | Dismissed | 2023-06-07T16:31:26+01:00 | 2023-11-14T00:00:00+00:00 | 2023-11-21T23:59:00+00:00 | Keadby 2 will be subject to approximately one week of hot commissioning following Gas Turbine and generator outage works. REMIT will be updated when commissioning profiles are confirmed. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_007 | Dismissed | 2024-09-27T09:23:17+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_006 | Dismissed | 2024-09-27T09:04:57+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_005 | Dismissed | 2024-09-27T09:04:33+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_004 | Dismissed | 2024-09-27T08:55:31+01:00 | 2023-11-10T12:44:00+00:00 | 2025-06-30T11:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H2 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated.” |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_003 | Dismissed | 2024-06-21T14:22:29+01:00 | 2023-11-10T12:44:00+00:00 | 2025-03-31T00:00:00+01:00 | It is expected that Dogger Bank B commissioning will start in H1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available. As relevant details of the commissioning plans become firmer REMIT will be updated |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_002 | Dismissed | 2024-03-22T16:27:38+00:00 | 2023-11-10T12:44:00+00:00 | 2025-01-30T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in Q1 2025. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available, As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 2 Projco Limited |
48X0000000003121 | Other_0000000000000008538_001 | Dismissed | 2023-11-10T15:42:44+00:00 | 2023-11-10T12:44:00+00:00 | 2024-12-31T00:00:00+00:00 | It is expected that Dogger Bank B commissioning will start in H2 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_002 | Inactive | 2023-10-24T23:47:32+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
SSE Energy Supply Limited |
A0001004V.UK | Other_0000000000000008476_001 | Dismissed | 2023-10-24T22:39:53+01:00 | 2023-10-24T22:36:00+01:00 | 2023-10-24T22:40:00+01:00 | end of outage |
||
Other_0000000000000008475_003 | Inactive | 2024-05-17T23:02:32+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||||
Great Island |
Great Island |
Other_0000000000000008475_002 | Dismissed | 2023-10-02T17:20:09+01:00 | 2023-10-02T17:05:00+01:00 | 2024-05-17T22:00:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
||
Great Island |
Great Island |
Other_0000000000000008475_001 | Dismissed | 2023-10-02T17:06:20+01:00 | 2023-10-02T17:05:00+01:00 | Great Island is available for running on secondary fuel in the event of a gas system emergency |
|||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_006 | Dismissed | 2023-09-22T15:13:14+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times referenced in the comments section in Elexon as requested |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_005 | Dismissed | 2023-09-21T17:33:37+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times referenced in the comments section in Elexon as requested |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_004 | Dismissed | 2023-09-21T17:03:58+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:01:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing. Resubmitted with GMT times in Elexon |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_003 | Dismissed | 2023-09-21T16:48:56+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:01:00+01:00 | T_PEHE-1 Running at Circa 780MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_002 | Dismissed | 2023-09-21T14:26:32+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | T_PEHE-1 Running at Circa 550MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008437_001 | Dismissed | 2023-09-20T08:32:32+01:00 | 2023-09-22T08:00:00+01:00 | 2023-09-22T19:00:00+01:00 | Running at Circa 550MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008436_003 | Dismissed | 2023-09-21T14:38:30+01:00 | 2023-09-21T12:00:00+01:00 | 2023-09-21T19:00:00+01:00 | T_PEHE-1 Running at Circa 300MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008436_002 | Dismissed | 2023-09-21T14:27:09+01:00 | 2023-09-21T12:00:00+01:00 | 2023-09-21T19:00:00+01:00 | T_PEHE-1 Running at Circa 300MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008436_001 | Dismissed | 2023-09-20T08:29:55+01:00 | 2023-09-21T12:00:00+01:00 | 2023-09-21T19:00:00+01:00 | Running at Circa 300MW for statutory testing |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008421_002 | Dismissed | 2023-09-18T12:19:17+01:00 | 2023-09-20T08:00:00+01:00 | 2023-09-20T19:00:00+01:00 | Operating at circa 550MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008421_001 | Dismissed | 2023-09-15T15:02:40+01:00 | 2023-09-20T08:00:00+01:00 | 2023-09-20T19:00:00+01:00 | Operating at circa 550MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008420_002 | Dismissed | 2023-09-18T12:19:36+01:00 | 2023-09-19T10:00:00+01:00 | 2023-09-19T19:00:00+01:00 | Operating at circa 300MW for statutory testing. |
||
Peterhead |
T_PEHE-1 |
Other_0000000000000008420_001 | Dismissed | 2023-09-15T15:01:11+01:00 | 2023-09-19T10:00:00+01:00 | 2023-09-19T19:00:00+01:00 | Operating at circa 300MW for statutory testing. |
||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000008388_002 | Dismissed | 2023-09-07T17:00:31+01:00 | 2023-09-07T14:00:00+01:00 | 2023-09-07T17:00:00+01:00 | SWEL will be carrying out SCADA commissioning / testing on the 07 September 2023 between 1400hrs and 1700hrs. The MW output of the BMU3, 4, 5 and 6 will vary between 0MW and maximum available during this period. |
||
Seagreen Wind Energy Ltd |
48X000000000263P | Other_0000000000000008388_001 | Dismissed | 2023-09-06T16:25:23+01:00 | 2023-09-07T14:00:00+01:00 | 2023-09-07T17:00:00+01:00 | SWEL will be carrying out SCADA commissioning / testing on the 07 September 2023 between 1400hrs and 1700hrs. The MW output of the BMU3, 4, 5 and 6 will vary between 0MW and maximum available during this period. |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_004 | Dismissed | 2023-08-09T14:21:16+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_003 | Dismissed | 2023-08-09T14:15:15+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_002 | Dismissed | 2023-08-09T14:14:24+01:00 | 2023-08-09T14:09:00+01:00 | 2023-08-10T14:14:00+01:00 | This is a test message |
||
SSE Generation Ireland Ltd |
47X0000000000592 | Other_0000000000000008299_001 | Dismissed | 2023-08-09T14:11:02+01:00 | 2023-08-09T14:09:00+01:00 | This is a test message |
|||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_039 | Dismissed | 2023-10-07T21:51:29+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | Other market information message withdrawn with first generation achieved 07/10/23 All REMIT submitted by BMU on SSE Remit portal. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_038 | Dismissed | 2023-10-06T16:23:25+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_037 | Dismissed | 2023-10-06T15:46:32+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-08T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 08th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_036 | Dismissed | 2023-10-06T15:08:54+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.325MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_035 | Dismissed | 2023-10-05T16:49:11+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T19:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_034 | Dismissed | 2023-10-03T16:16:32+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-06T07:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 06th Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |
||
Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | Other_0000000000000008251_033 | Dismissed | 2023-10-03T11:39:12+01:00 | 2023-07-18T13:30:00+01:00 | 2023-10-03T20:00:00+01:00 | It is anticipated that Dogger Bank A commissioning will start on 03rd Oct 2023 and full commercial operation will commence during Q3 of 2024. It is expected that there will be a steady increase in installed capacity with c.250MW by the end of Q4 2023, c.525MW by the end of Q1 2024, c.975MW by the end of Q2 2024 and the total capacity of 1.2GW available during Q3 2024. As relevant details of the commissioning plans become firmer REMIT will be updated. |