Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 2 3 4 5 6 >
Peterhead
T_PEHE-1
Other_0000000000000009046_001 Dismissed 2024-04-25T12:04:26+01:00 2024-04-27T23:00:00+01:00 2024-05-21T23:00:00+01:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Peterhead
T_PEHE-1
Other_0000000000000009081_005 Dismissed 2024-05-16T18:41:49+01:00 2024-05-14T23:00:00+01:00 2024-05-16T18:37:00+01:00
T_PEHE-1 block running for post outage commissioning works.
Peterhead
T_PEHE-1
Other_0000000000000009081_005 Dismissed 2024-05-16T18:41:53+01:00 2024-05-14T23:00:00+01:00 2024-05-16T18:37:00+01:00
T_PEHE-1 block running for post outage commissioning works.
Peterhead
T_PEHE-1
Other_0000000000000009081_004 Dismissed 2024-05-16T18:36:19+01:00 2024-05-14T23:00:00+01:00 2024-05-16T18:37:00+01:00
T_PEHE-1 block running for post outage commissioning works.
Peterhead
T_PEHE-1
Other_0000000000000009081_003 Dismissed 2024-05-14T08:51:35+01:00 2024-05-14T23:00:00+01:00 2024-05-17T21:00:00+01:00
T_PEHE-1 block running for post outage commissioning works.
Peterhead
T_PEHE-1
Other_0000000000000009081_002 Dismissed 2024-05-13T17:15:57+01:00 2024-05-15T08:00:00+01:00 2024-05-17T21:00:00+01:00
T_PEHE-1 block running for post outage commissioning works.
Peterhead
T_PEHE-1
Other_0000000000000009081_001 Dismissed 2024-05-13T11:11:57+01:00 2024-05-15T08:00:00+01:00 2024-05-17T21:00:00+01:00
T_PEHE-1 block running at circa 600MW for post outage commissioning works.
Other_0000000000000009072_002 Inactive 2024-05-17T23:02:32+01:00 2024-05-17T07:00:00+01:00 2024-05-17T22:00:00+01:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Great Island
Great Island
Other_0000000000000009072_001 Dismissed 2024-05-08T10:08:54+01:00 2024-05-17T07:00:00+01:00 2024-05-17T22:00:00+01:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_002 Inactive 2024-05-24T16:25:24+01:00 2024-05-24T00:00:00+01:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_001 Dismissed 2024-05-24T16:24:36+01:00 2024-05-24T00:00:00+01:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
Other_0000000000000009127_004 Inactive 2024-06-04T01:02:31+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Medway
T_MEDP-1
Other_0000000000000009127_003 Dismissed 2024-06-03T16:49:21+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Inactive 2024-06-04T01:02:31+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Medway
T_MEDP-1
Other_0000000000000009127_002 Dismissed 2024-06-03T08:32:07+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Medway
T_MEDP-1
Other_0000000000000009127_002 Dismissed 2024-06-03T08:32:16+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Medway
T_MEDP-1
Other_0000000000000009127_001 Dismissed 2024-05-31T09:03:01+01:00 2024-06-03T00:00:00+01:00 2024-06-03T23:59:00+01:00
Asset integrity station on load run. Once out of merit run is complete our dynamic data NDZ value will become 360 mins.
Other_0000000000000009139_003 Inactive 2024-06-07T13:02:32+01:00 2024-06-06T00:00:00+01:00 2024-06-07T12:00:00+01:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Keadby
T_KEAD-1
Other_0000000000000009139_002 Dismissed 2024-06-06T17:30:33+01:00 2024-06-06T00:00:00+01:00 2024-06-07T12:00:00+01:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Keadby
T_KEAD-1
Other_0000000000000009139_001 Dismissed 2024-06-04T15:45:42+01:00 2024-06-06T00:00:00+01:00 2024-06-06T23:59:00+01:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_003 Active 2024-09-27T08:57:17+01:00 2024-06-21T14:00:00+01:00 2025-06-30T14:00:00+01:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_002 Dismissed 2024-06-21T14:23:06+01:00 2024-06-21T14:00:00+01:00 2025-03-31T14:00:00+01:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_001 Dismissed 2024-06-21T14:21:28+01:00 2024-06-21T14:00:00+01:00 2025-03-31T14:00:00+01:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000009202_002 Inactive 2024-07-03T19:02:32+01:00 2024-07-03T13:00:00+01:00 2024-07-03T18:00:00+01:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Peterhead
T_PEHE-1
Other_0000000000000009202_001 Dismissed 2024-07-02T09:06:48+01:00 2024-07-03T13:00:00+01:00 2024-07-03T18:00:00+01:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Other_0000000000000009232_003 Inactive 2024-07-08T22:02:32+01:00 2024-07-08T08:00:00+01:00 2024-07-08T21:00:00+01:00
T_PEHE-1 commissioning run at circa 1000MW.
Peterhead
T_PEHE-1
Other_0000000000000009232_002 Dismissed 2024-07-05T16:16:03+01:00 2024-07-08T08:00:00+01:00 2024-07-08T21:00:00+01:00
T_PEHE-1 commissioning run at circa 1000MW.
Peterhead
T_PEHE-1
Other_0000000000000009232_001 Dismissed 2024-07-05T14:44:07+01:00 2024-07-08T08:00:00+01:00 2024-07-09T21:00:00+01:00
T_PEHE-1 commissioning run at circa 1000MW.
Peterhead
T_PEHE-1
Other_0000000000000009233_003 Dismissed 2024-07-08T21:43:03+01:00 2024-07-09T08:00:00+01:00 2024-07-09T21:00:00+01:00
T_PEHE-1 commissioning run at circa 370MW.
Peterhead
T_PEHE-1
Other_0000000000000009233_002 Dismissed 2024-07-08T09:37:04+01:00 2024-07-09T08:00:00+01:00 2024-07-09T21:00:00+01:00
T_PEHE-1 commissioning run at circa 370MW.
Peterhead
T_PEHE-1
Other_0000000000000009233_001 Dismissed 2024-07-05T16:18:45+01:00 2024-07-09T08:00:00+01:00 2024-07-09T21:00:00+01:00
T_PEHE-1 commissioning run at circa 1000MW.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009241_002 Inactive 2024-07-15T19:02:32+01:00 2024-07-15T02:01:00+01:00 2024-07-15T18:00:00+01:00
Post outage out of merit commission/testing run.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009241_001 Dismissed 2024-07-12T10:10:34+01:00 2024-07-15T02:01:00+01:00 2024-07-15T18:00:00+01:00
Post outage out of merit commission/testing run.
Great Island
Great Island
Other_0000000000000009256_001 Dismissed 2024-07-18T16:02:07+01:00 2024-07-28T00:00:00+01:00 2024-07-29T23:59:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_002 Dismissed 2024-07-27T20:37:44+01:00 2024-07-29T00:00:00+01:00 2024-07-30T23:59:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_002 Dismissed 2024-07-29T14:20:34+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_001 Dismissed 2024-07-26T12:31:36+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_002 Dismissed 2024-07-29T14:19:57+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_001 Dismissed 2024-07-26T12:31:39+01:00 2024-07-30T00:00:00+01:00 2026-05-01T00:00:00+01:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
Other_0000000000000009256_008 Inactive 2024-08-01T04:02:32+01:00 2024-07-31T00:00:00+01:00 2024-08-01T03:00:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_007 Dismissed 2024-07-31T21:10:48+01:00 2024-07-31T00:00:00+01:00 2024-08-01T03:00:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_006 Dismissed 2024-07-31T21:07:31+01:00 2024-07-31T00:00:00+01:00 2024-08-01T00:03:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_005 Dismissed 2024-07-30T15:59:06+01:00 2024-07-31T00:00:00+01:00 2024-07-31T23:59:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_003 Dismissed 2024-07-28T16:25:13+01:00 2024-07-31T00:00:00+01:00 2024-08-01T23:59:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009256_004 Dismissed 2024-07-29T14:03:08+01:00 2024-08-01T00:00:00+01:00 2024-08-01T23:59:00+01:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Great Island
Great Island
Other_0000000000000009284_001 Active 2024-07-29T14:17:35+01:00 2024-08-02T00:00:00+01:00 2025-04-30T00:00:00+01:00
Great Island is unavailable to run on oil due to plant fault.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009354_003 Inactive 2024-09-13T01:02:32+01:00 2024-09-10T00:01:00+01:00 2024-09-12T23:59:00+01:00
Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009354_002 Dismissed 2024-09-09T09:01:48+01:00 2024-09-10T00:01:00+01:00 2024-09-12T23:59:00+01:00
Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 11th and 12th of September 2024.
MEDWAY POWER LTD
48X000000000076O
Other_0000000000000009354_001 Dismissed 2024-08-23T14:04:31+01:00 2024-09-10T00:01:00+01:00 2024-09-12T23:59:00+01:00
Medway will be required to run 2+1 to allow national gas to undertake pipeline inspections. This testing will take place between 09:00-18:00 on the 10th,11th and 12th of September 2024.
Keadby
T_KEAD-1
Other_0000000000000009350_002 Dismissed 2024-08-22T14:45:18+01:00 2024-09-22T00:00:00+01:00 2024-09-22T00:00:01+01:00
This is a test publication following the automation of SSE REMIT admin app.