SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-01-12T15:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status
Market Participant Market Participant Code Unit Location Unit Name Message ID Event Status Publication Date Event Start Event Stop Remarks
< 2 3 4 5 6 >
Other_0000000000000008908_001 Dismissed 2024-03-04T13:13:31+00:00 2024-03-04T00:00:00+00:00 2024-03-18T00:00:00+00:00
SSE Keadby 2 Power Station is currently restricted in it's range of operation due to a technical issue. Additionally, once offload, the plant will be unable to restart until the issue is rectified.
Other_0000000000000008899_004 Inactive 2024-03-08T01:02:31+00:00 2024-03-04T06:00:00+00:00 2024-03-07T23:59:00+00:00
Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads.
Other_0000000000000008899_003 Dismissed 2024-03-05T14:59:17+00:00 2024-03-04T06:00:00+00:00 2024-03-07T23:59:00+00:00
Medway is carrying out emissions testing of both gas turbines. This will require periods of running at MEL and other varying loads.
Other_0000000000000008899_002 Dismissed 2024-02-29T14:00:58+00:00 2024-03-04T06:00:00+00:00 2024-03-07T23:59:00+00:00
Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads.
Other_0000000000000008899_001 Dismissed 2024-02-29T13:41:02+00:00 2024-03-04T06:00:00+00:00 2024-04-04T23:59:00+00:00
Medway is carrying out emission testing of both gas turbines along with RSO testing of all 3 generators. This will require periods of running at MEL and other various loads.
Other_0000000000000009044_001 Dismissed 2024-04-24T19:54:16+00:00 2024-04-25T00:00:00+00:00 2024-06-06T00:00:00+00:00
Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented.
Other_0000000000000009044_005 Inactive 2024-04-27T01:02:32+00:00 2024-04-26T00:00:00+00:00 2024-04-26T23:59:59+00:00
Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented.
Other_0000000000000009044_004 Dismissed 2024-04-25T10:49:47+00:00 2024-04-26T00:00:00+00:00 2024-04-26T23:59:59+00:00
Asset Integrity. Following the KEAD_1 out-of-merit run commencing 26th April ’24, a dynamic data change to 720min NDZ will be implemented.
Other_0000000000000009044_003 Dismissed 2024-04-25T10:23:07+00:00 2024-04-26T00:00:00+00:00 2024-04-26T23:59:59+00:00
Asset Integrity. Following the KEAD_1 out-of-merit run commencing 25th April ’24, a dynamic data change to 720min NDZ will be implemented.
Other_0000000000000009044_002 Dismissed 2024-04-25T09:44:41+00:00 2024-04-26T00:00:00+00:00 2024-06-06T00:00:00+00:00
KEAD_1 10 hour on load run requested for preservation of plant during Friday 26th April 2024.
Other_0000000000000009046_003 Dismissed 2024-06-25T15:31:25+00:00 2024-04-27T23:00:00+00:00 2024-06-28T00:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009046_002 Dismissed 2024-05-17T08:50:18+00:00 2024-04-27T23:00:00+00:00 2024-06-28T00:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009046_001 Dismissed 2024-04-25T12:04:26+00:00 2024-04-27T23:00:00+00:00 2024-05-21T23:00:00+00:00
T_PEHE-1. Auxiliary boiler taken out of service to allow statutory inspection to be completed. While auxiliary boiler is out of service, block in inflexible following shutdown as a period of 37 hours is required to allow sufficient cooling of steam turbine to allow re-start without auxiliary steam.
Other_0000000000000009081_005 Dismissed 2024-05-16T18:41:49+00:00 2024-05-14T23:00:00+00:00 2024-05-16T18:37:00+00:00
T_PEHE-1 block running for post outage commissioning works.
Other_0000000000000009081_005 Dismissed 2024-05-16T18:41:53+00:00 2024-05-14T23:00:00+00:00 2024-05-16T18:37:00+00:00
T_PEHE-1 block running for post outage commissioning works.
Other_0000000000000009081_004 Dismissed 2024-05-16T18:36:19+00:00 2024-05-14T23:00:00+00:00 2024-05-16T18:37:00+00:00
T_PEHE-1 block running for post outage commissioning works.
Other_0000000000000009081_003 Dismissed 2024-05-14T08:51:35+00:00 2024-05-14T23:00:00+00:00 2024-05-17T21:00:00+00:00
T_PEHE-1 block running for post outage commissioning works.
Other_0000000000000009081_002 Dismissed 2024-05-13T17:15:57+00:00 2024-05-15T08:00:00+00:00 2024-05-17T21:00:00+00:00
T_PEHE-1 block running for post outage commissioning works.
Other_0000000000000009081_001 Dismissed 2024-05-13T11:11:57+00:00 2024-05-15T08:00:00+00:00 2024-05-17T21:00:00+00:00
T_PEHE-1 block running at circa 600MW for post outage commissioning works.
Other_0000000000000009072_002 Inactive 2024-05-17T23:02:32+00:00 2024-05-17T07:00:00+00:00 2024-05-17T22:00:00+00:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
Other_0000000000000009072_001 Dismissed 2024-05-08T10:08:54+00:00 2024-05-17T07:00:00+00:00 2024-05-17T22:00:00+00:00
For the last shutdown that is within 15 hours prior to the start of the planned outage with a commencement time of 22:00hrs on 17/05/2024, a maintenance shutdown is required. This shutdown should commence from a turbine output of 205MW, have a reduced ramp rate and the expected duration until off load is approximately 3 hours.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_002 Inactive 2024-05-24T16:25:24+00:00 2024-05-24T00:00:00+00:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009108_001 Dismissed 2024-05-24T16:24:36+00:00 2024-05-24T00:00:00+00:00
**** PLEASE IGNORE ***** Test publication to check SSE REMIT app functioning correctly after update. Market Participant Level
Other_0000000000000009127_004 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Dismissed 2024-06-03T16:49:21+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 720 mins.
Other_0000000000000009127_003 Inactive 2024-06-04T01:02:31+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Other_0000000000000009127_002 Dismissed 2024-06-03T08:32:07+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Other_0000000000000009127_002 Dismissed 2024-06-03T08:32:16+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity 2 + 1 SEL run. Dynamic data NDZ value will become 360 mins.
Other_0000000000000009127_001 Dismissed 2024-05-31T09:03:01+00:00 2024-06-03T00:00:00+00:00 2024-06-03T23:59:00+00:00
Asset integrity station on load run. Once out of merit run is complete our dynamic data NDZ value will become 360 mins.
Other_0000000000000009139_003 Inactive 2024-06-07T13:02:32+00:00 2024-06-06T00:00:00+00:00 2024-06-07T12:00:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009139_002 Dismissed 2024-06-06T17:30:33+00:00 2024-06-06T00:00:00+00:00 2024-06-07T12:00:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Other_0000000000000009139_001 Dismissed 2024-06-04T15:45:42+00:00 2024-06-06T00:00:00+00:00 2024-06-06T23:59:00+00:00
T_KEAD-1 2+1 run required for post outage commissioning works.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_004 Inactive 2025-06-30T15:02:32+00:00 2024-06-21T14:00:00+00:00 2025-06-30T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113
Other_0000000000000009175_003 Dismissed 2024-09-27T08:57:17+00:00 2024-06-21T14:00:00+00:00 2025-06-30T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.300MW of installed capacity as at 26 September 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H2 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_002 Dismissed 2024-06-21T14:23:06+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Dogger Bank A
48X0000000003113
Other_0000000000000009175_001 Dismissed 2024-06-21T14:21:28+00:00 2024-06-21T14:00:00+00:00 2025-03-31T14:00:00+00:00
Dogger Bank A is currently in the commissioning phase, with c.200MW of installed capacity as at 1 June 2024. It is expected that there will be a steady increase in installed capacity through to the total capacity of 1.2 GW being available during H1 2025. As relevant details of the commissioning plans become firmer REMIT will be updated.
Other_0000000000000009202_002 Inactive 2024-07-03T19:02:32+00:00 2024-07-03T13:00:00+00:00 2024-07-03T18:00:00+00:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Other_0000000000000009202_001 Dismissed 2024-07-02T09:06:48+00:00 2024-07-03T13:00:00+00:00 2024-07-03T18:00:00+00:00
T_PEHE-1 running for post outage commissioning at circa 600MW.
Other_0000000000000009232_003 Inactive 2024-07-08T22:02:32+00:00 2024-07-08T08:00:00+00:00 2024-07-08T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009232_002 Dismissed 2024-07-05T16:16:03+00:00 2024-07-08T08:00:00+00:00 2024-07-08T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009232_001 Dismissed 2024-07-05T14:44:07+00:00 2024-07-08T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009233_003 Dismissed 2024-07-08T21:43:03+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 370MW.
Other_0000000000000009233_002 Dismissed 2024-07-08T09:37:04+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 370MW.
Other_0000000000000009233_001 Dismissed 2024-07-05T16:18:45+00:00 2024-07-09T08:00:00+00:00 2024-07-09T21:00:00+00:00
T_PEHE-1 commissioning run at circa 1000MW.
Other_0000000000000009256_001 Dismissed 2024-07-18T16:02:07+00:00 2024-07-28T00:00:00+00:00 2024-07-29T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
Other_0000000000000009256_002 Dismissed 2024-07-27T20:37:44+00:00 2024-07-29T00:00:00+00:00 2024-07-30T23:59:00+00:00
Unit will be completing testing within the range of 0-464MW following completion of centreline outage.
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_002 Dismissed 2024-07-29T14:20:34+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009279_001 Dismissed 2024-07-26T12:31:36+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_002 Dismissed 2024-07-29T14:19:57+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency
SSE Generation Ireland Ltd
47X0000000000592
Other_0000000000000009280_001 Dismissed 2024-07-26T12:31:39+00:00 2024-07-30T00:00:00+00:00 2026-05-01T00:00:00+00:00
Great Island is available for running on secondary fuel in the event of a gas system emergency