Last update at: 2024-07-26T15:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Asset or Unit | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date/Time | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Reason Of Unavailability | Remarks | Balancing Zone | Affected Asset or Unit EIC Code | Market Participant | Market Participant Code |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | |||||||||||||||||
Atwick | ATW_000000000000000000825_003 | Inactive | Planned | Injection unavailability | 2024-07-23T11:25:03+01:00 | 2024-06-28T05:00:00+01:00 | 2024-07-23T11:24:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | Full site outage |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000825_002 | Dismissed | Planned | Injection unavailability | 2024-07-22T15:58:49+01:00 | 2024-06-28T05:00:00+01:00 | 2024-07-23T12:00:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | Full site outage |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000825_001 | Dismissed | Planned | Injection unavailability | 2023-10-20T20:09:26+01:00 | 2024-06-28T05:00:00+01:00 | 2024-07-23T05:00:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | Full site outage |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000945_002 | Inactive | Planned | Injection unavailability | 2024-07-16T13:29:25+01:00 | 2024-07-16T11:30:00+01:00 | 2024-07-16T13:30:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | PCS Download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000945_001 | Dismissed | Planned | Injection unavailability | 2024-07-16T11:04:29+01:00 | 2024-07-16T11:30:00+01:00 | 2024-07-16T13:30:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | PCS Download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000935_002 | Inactive | Planned | Injection unavailability | 2024-06-27T14:45:38+01:00 | 2024-06-27T08:00:00+01:00 | 2024-06-27T13:50:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | . |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000935_001 | Dismissed | Planned | Injection unavailability | 2024-06-18T13:06:51+01:00 | 2024-06-27T08:00:00+01:00 | 2024-06-27T16:00:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | . |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000933_002 | Inactive | Planned | Injection unavailability | 2024-06-26T16:05:36+01:00 | 2024-06-26T12:00:00+01:00 | 2024-06-26T16:00:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | . |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Atwick | ATW_000000000000000000933_001 | Dismissed | Planned | Injection unavailability | 2024-06-18T13:04:04+01:00 | 2024-06-26T12:00:00+01:00 | 2024-06-26T16:00:00+01:00 | GWh/d | 30 | 0 | 30 | Planned Outage | . |
21YGB-UKGASGRIDW | 55WATWICK-SSE00J | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000931_002 | Inactive | Unplanned | Injection unavailability | 2024-06-13T13:40:03+01:00 | 2024-06-12T17:00:00+01:00 | 2024-06-13T13:35:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | C2 Control Issues |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000931_001 | Dismissed | Unplanned | Injection unavailability | 2024-06-12T17:52:27+01:00 | 2024-06-12T17:00:00+01:00 | 2024-06-13T17:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | C2 Control Issues |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000929_002 | Inactive | Unplanned | Injection unavailability | 2024-06-12T16:11:30+01:00 | 2024-06-07T15:00:00+01:00 | 2024-06-12T16:10:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Harmonic Filter Failure |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000929_001 | Dismissed | Unplanned | Injection unavailability | 2024-06-07T15:31:04+01:00 | 2024-06-07T15:00:00+01:00 | 2024-06-12T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Harmonic Filter Failure |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000909_004 | Inactive | Planned | Injection unavailability | 2024-06-11T16:28:11+01:00 | 2024-06-11T12:00:00+01:00 | 2024-06-11T16:15:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | A4z software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000909_003 | Dismissed | Planned | Injection unavailability | 2024-06-11T16:13:50+01:00 | 2024-06-11T12:00:00+01:00 | 2024-06-11T16:15:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | A4z software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000909_002 | Dismissed | Planned | Injection unavailability | 2024-05-13T13:54:49+01:00 | 2024-06-11T12:00:00+01:00 | 2024-06-11T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | A4z software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000909_001 | Dismissed | Planned | Injection unavailability | 2024-04-17T14:43:14+01:00 | 2024-06-05T10:00:00+01:00 | 2024-06-05T14:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | A4z software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000927_002 | Inactive | Unplanned | Injection unavailability | 2024-05-25T19:37:23+01:00 | 2024-05-24T15:30:00+01:00 | 2024-05-25T19:30:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Loss of Comp 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000927_001 | Dismissed | Unplanned | Injection unavailability | 2024-05-24T15:35:01+01:00 | 2024-05-24T15:30:00+01:00 | 2024-05-29T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Loss of Comp 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000926_002 | Inactive | Unplanned | Injection unavailability | 2024-05-24T15:30:04+01:00 | 2024-05-24T10:58:00+01:00 | 2024-05-29T15:30:00+01:00 | GWh/d | 211.29 | 100.27 | 311.56 | Failure | Loss of Comp 1 & 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000926_001 | Dismissed | Unplanned | Injection unavailability | 2024-05-24T11:01:23+01:00 | 2024-05-24T10:58:00+01:00 | 2024-05-29T18:00:00+01:00 | GWh/d | 211.29 | 100.27 | 311.56 | Failure | Loss of Comp 1 & 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000925_002 | Inactive | Planned | Injection unavailability | 2024-05-24T10:57:58+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-24T10:57:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | ALD_00000479_010 - Updated in error showing total availability For Outage. This Remit has been published to reflect total Injection unavailability. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000925_001 | Dismissed | Planned | Injection unavailability | 2024-05-24T10:57:01+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-24T10:57:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | ALD_00000479_010 - Updated in error showing total availability For Outage. This Remit has been published to reflect total Injection unavailability. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_010 | Inactive | Planned | Injection unavailability | 2024-05-24T10:49:22+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-29T07:30:00+01:00 | GWh/d | 0 | 311.56 | 311.56 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000479_009 | Dismissed | Planned | Injection unavailability | 2024-05-24T07:47:29+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-29T18:00:00+01:00 | GWh/d | 211.29 | 100.27 | 311.56 | Planned Outage | Loss of Comp 1 & 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_008 | Dismissed | Planned | Injection unavailability | 2024-05-22T08:57:54+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-29T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full injection outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_007 | Dismissed | Planned | Injection unavailability | 2024-02-26T13:07:00+00:00 | 2024-05-12T05:00:00+01:00 | 2024-05-24T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_006 | Dismissed | Planned | Injection unavailability | 2024-02-26T12:31:03+00:00 | 2024-05-12T05:00:00+01:00 | 2024-05-23T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_005 | Dismissed | Planned | Injection unavailability | 2023-11-01T08:19:18+00:00 | 2024-05-12T05:00:00+01:00 | 2024-05-26T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_004 | Dismissed | Planned | Injection unavailability | 2023-07-25T08:42:49+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-21T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_003 | Dismissed | Planned | Injection unavailability | 2020-09-20T09:03:10+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-21T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_002 | Dismissed | Planned | Injection unavailability | 2020-09-20T08:57:21+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-21T09:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000479_001 | Dismissed | Planned | Injection unavailability | 2020-07-11T16:25:45+01:00 | 2024-05-12T05:00:00+01:00 | 2024-05-24T18:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Full Site Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000924_002 | Dismissed | Unplanned | Injection unavailability | 2024-05-22T09:29:47+01:00 | 2024-05-24T18:00:00+01:00 | 2024-05-26T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Comp 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000924_001 | Dismissed | Unplanned | Injection unavailability | 2024-05-21T14:43:53+01:00 | 2024-05-24T18:00:00+01:00 | 2024-05-26T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Comp 3 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000911_002 | Inactive | Unplanned | Injection unavailability | 2024-04-18T15:39:27+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T15:37:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. NG 908. rev 5702. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000911_001 | Dismissed | Unplanned | Injection unavailability | 2024-04-18T13:57:40+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-19T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. NG 908. rev 5702. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000908_002 | Inactive | Unplanned | Injection unavailability | 2024-04-18T13:02:32+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T12:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000908_001 | Dismissed | Unplanned | Injection unavailability | 2024-04-15T13:21:20+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T12:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000902_002 | Inactive | Planned | Injection unavailability | 2024-04-03T15:02:32+01:00 | 2024-04-03T10:00:00+01:00 | 2024-04-03T14:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Software download. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000902_001 | Dismissed | Planned | Injection unavailability | 2024-03-28T15:26:14+00:00 | 2024-04-03T10:00:00+01:00 | 2024-04-03T14:00:00+01:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Software download. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000899_002 | Inactive | Unplanned | Injection unavailability | 2024-03-27T16:02:47+00:00 | 2024-03-27T14:35:00+00:00 | 2024-03-27T16:00:00+00:00 | GWh/d | 311.56 | 0 | 311.56 | Failure | ESD fault |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000899_001 | Dismissed | Unplanned | Injection unavailability | 2024-03-27T14:34:28+00:00 | 2024-03-27T14:35:00+00:00 | 2024-03-27T17:00:00+00:00 | GWh/d | 311.56 | 0 | 311.56 | Failure | ESD fault |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000894_002 | Inactive | Planned | Injection unavailability | 2024-03-27T15:02:31+00:00 | 2024-03-27T08:00:00+00:00 | 2024-03-27T14:00:00+00:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000894_001 | Dismissed | Planned | Injection unavailability | 2024-03-04T08:24:29+00:00 | 2024-03-27T08:00:00+00:00 | 2024-03-27T14:00:00+00:00 | GWh/d | 311.56 | 0 | 311.56 | Planned Outage | Software download |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000893_002 | Inactive | Unplanned | Injection unavailability | 2024-02-26T18:27:54+00:00 | 2024-02-26T17:45:00+00:00 | 2024-02-26T18:30:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Compressor 2 unavailable |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000893_001 | Dismissed | Unplanned | Injection unavailability | 2024-02-26T17:45:57+00:00 | 2024-02-26T17:45:00+00:00 | 2024-02-26T22:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Compressor 2 unavailable |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000892_002 | Inactive | Planned | Injection unavailability | 2024-02-14T18:16:49+00:00 | 2024-02-14T05:00:00+00:00 | 2024-02-14T18:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Planned Outage | GC-1 HP BD valve replacement |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000892_001 | Dismissed | Planned | Injection unavailability | 2024-02-13T15:01:09+00:00 | 2024-02-14T05:00:00+00:00 | 2024-02-14T18:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Planned Outage | GC-1 HP BD valve replacement |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000890_002 | Inactive | Unplanned | Injection unavailability | 2024-02-13T12:58:21+00:00 | 2024-02-13T06:30:00+00:00 | 2024-02-13T13:00:00+00:00 | GWh/d | 311.56 | 0 | 311.56 | Failure | Site Trip |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |