Last update at: 2024-04-25T18:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Asset or Unit | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date/Time | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Reason Of Unavailability | Remarks | Balancing Zone | Affected Asset or Unit EIC Code | Market Participant | Market Participant Code |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | |||||||||||||||||
Aldbrough | ALD_000000000000000000698_005 | Inactive | Planned | Withdrawal unavailability | 2022-11-04T00:57:46+00:00 | 2022-10-22T05:00:00+01:00 | 2022-11-04T00:57:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000698_004 | Dismissed | Planned | Withdrawal unavailability | 2022-10-30T09:47:15+00:00 | 2022-10-22T05:00:00+01:00 | 2022-11-04T18:00:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000698_003 | Dismissed | Planned | Withdrawal unavailability | 2022-10-30T01:21:29+00:00 | 2022-10-22T05:00:00+01:00 | 2022-10-30T11:00:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000698_002 | Dismissed | Planned | Withdrawal unavailability | 2022-10-27T13:27:45+01:00 | 2022-10-22T05:00:00+01:00 | 2022-10-30T05:00:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000698_001 | Dismissed | Planned | Withdrawal unavailability | 2022-10-15T16:29:04+01:00 | 2022-10-22T05:00:00+01:00 | 2022-10-29T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000695_002 | Inactive | Unplanned | Withdrawal unavailability | 2022-10-05T16:52:04+01:00 | 2022-10-05T10:15:00+01:00 | 2022-10-05T16:30:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000695_001 | Dismissed | Unplanned | Withdrawal unavailability | 2022-10-05T10:54:29+01:00 | 2022-10-05T10:15:00+01:00 | 2022-10-05T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000675_002 | Inactive | Unplanned | Withdrawal unavailability | 2022-06-28T22:24:03+01:00 | 2022-06-24T22:23:00+01:00 | 2022-06-28T22:23:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000675_001 | Dismissed | Unplanned | Withdrawal unavailability | 2022-06-24T22:32:08+01:00 | 2022-06-24T22:23:00+01:00 | 2022-07-01T19:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000467_004 | Inactive | Planned | Withdrawal unavailability | 2022-06-17T19:05:25+01:00 | 2022-06-04T05:00:00+01:00 | 2022-06-17T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000467_003 | Dismissed | Planned | Withdrawal unavailability | 2022-05-02T03:13:47+01:00 | 2022-06-04T05:00:00+01:00 | 2022-06-19T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000467_002 | Dismissed | Planned | Withdrawal unavailability | 2021-10-06T22:33:43+01:00 | 2022-06-04T05:00:00+01:00 | 2022-06-19T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000467_001 | Dismissed | Planned | Withdrawal unavailability | 2020-07-11T15:46:33+01:00 | 2022-05-20T05:00:00+01:00 | 2022-06-19T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000468_004 | Inactive | Planned | Withdrawal unavailability | 2022-05-22T19:02:31+01:00 | 2022-05-01T05:00:00+01:00 | 2022-05-22T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000468_003 | Dismissed | Planned | Withdrawal unavailability | 2022-05-02T03:11:33+01:00 | 2022-05-01T05:00:00+01:00 | 2022-05-22T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000468_002 | Dismissed | Planned | Withdrawal unavailability | 2021-10-06T22:34:05+01:00 | 2022-05-01T05:00:00+01:00 | 2022-05-22T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000468_001 | Dismissed | Planned | Withdrawal unavailability | 2020-07-11T15:50:13+01:00 | 2022-05-06T05:00:00+01:00 | 2022-05-20T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000668_001 | Dismissed | Unplanned | Withdrawal unavailability | 2022-04-22T13:52:16+01:00 | 2022-04-22T13:00:00+01:00 | 2022-05-01T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | Production T1 |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000666_002 | Inactive | Planned | Withdrawal unavailability | 2022-04-14T19:01:52+01:00 | 2022-04-10T05:00:00+01:00 | 2022-04-14T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000666_001 | Dismissed | Planned | Withdrawal unavailability | 2022-04-06T13:37:59+01:00 | 2022-04-10T05:00:00+01:00 | 2022-04-14T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000629_004 | Inactive | Unplanned | Withdrawal unavailability | 2021-12-20T13:20:35+00:00 | 2021-12-19T23:30:00+00:00 | 2021-12-20T13:20:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000629_003 | Dismissed | Unplanned | Withdrawal unavailability | 2021-12-20T11:54:39+00:00 | 2021-12-19T23:30:00+00:00 | 2021-12-20T16:00:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000629_002 | Dismissed | Unplanned | Withdrawal unavailability | 2021-12-19T23:15:09+00:00 | 2021-12-19T23:30:00+00:00 | 2021-12-20T12:00:00+00:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000609_003 | Inactive | Planned | Withdrawal unavailability | 2021-10-16T01:02:32+01:00 | 2021-10-12T05:00:00+01:00 | 2021-10-16T00:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Adsorber valve fault |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000609_002 | Dismissed | Planned | Withdrawal unavailability | 2021-10-15T15:08:26+01:00 | 2021-10-12T05:00:00+01:00 | 2021-10-16T00:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Adsorber valve fault |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000609_001 | Dismissed | Planned | Withdrawal unavailability | 2021-10-04T13:11:02+01:00 | 2021-10-12T05:00:00+01:00 | 2021-10-15T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Adsorber valve fault |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000461_002 | Inactive | Planned | Withdrawal unavailability | 2021-06-15T18:14:00+01:00 | 2021-06-01T05:00:00+01:00 | 2021-06-15T15:30:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000461_001 | Dismissed | Planned | Withdrawal unavailability | 2020-07-11T13:55:44+01:00 | 2021-06-01T05:00:00+01:00 | 2021-06-15T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 2 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000586_003 | Inactive | Unplanned | Withdrawal unavailability | 2021-05-19T11:34:23+01:00 | 2021-05-17T17:01:00+01:00 | 2021-05-19T11:35:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000586_002 | Dismissed | Unplanned | Withdrawal unavailability | 2021-05-18T17:07:23+01:00 | 2021-05-17T17:01:00+01:00 | 2021-05-19T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000586_001 | Dismissed | Unplanned | Withdrawal unavailability | 2021-05-17T17:24:59+01:00 | 2021-05-17T17:01:00+01:00 | 2021-05-18T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | 21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK | |
Aldbrough | ALD_000000000000000000585_002 | Inactive | Unplanned | Withdrawal unavailability | 2021-05-17T05:40:28+01:00 | 2021-05-16T18:00:00+01:00 | 2021-05-17T06:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | Train 1 Leak test. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000585_001 | Dismissed | Unplanned | Withdrawal unavailability | 2021-05-16T17:58:28+01:00 | 2021-05-16T18:00:00+01:00 | 2021-05-17T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Failure | Train 1 Leak test. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_006 | Inactive | Planned | Withdrawal unavailability | 2021-05-08T06:01:53+01:00 | 2021-04-29T13:00:00+01:00 | 2021-05-08T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage. Then into main site outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_005 | Dismissed | Planned | Withdrawal unavailability | 2021-04-29T12:14:48+01:00 | 2021-04-29T13:00:00+01:00 | 2021-05-08T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage. Then into main site outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_004 | Dismissed | Planned | Withdrawal unavailability | 2021-03-12T10:30:05+00:00 | 2021-05-01T05:00:00+01:00 | 2021-05-08T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage. Then into main site outage. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_003 | Dismissed | Planned | Withdrawal unavailability | 2020-12-01T10:21:49+00:00 | 2021-05-02T05:00:00+01:00 | 2021-05-08T05:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage. Then into main site outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_002 | Dismissed | Planned | Withdrawal unavailability | 2020-11-27T12:01:09+00:00 | 2021-05-02T05:00:00+01:00 | 2021-05-08T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage. Then into main site outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000460_001 | Dismissed | Planned | Withdrawal unavailability | 2020-07-11T13:51:55+01:00 | 2021-05-06T05:00:00+01:00 | 2021-05-20T18:00:00+01:00 | GWh/d | 121.5 | 220.8 | 342.3 | Planned Outage | Prod Train 1 Outage |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000699_002 | Inactive | Unplanned | Injection unavailability | 2022-10-19T15:10:48+01:00 | 2022-10-19T11:10:00+01:00 | 2022-10-19T15:10:00+01:00 | GWh/d | 100.27 | 211.29 | 311.56 | Failure | GC-2 booster pump failure |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000699_001 | Dismissed | Unplanned | Injection unavailability | 2022-10-19T12:05:19+01:00 | 2022-10-19T11:10:00+01:00 | 2022-10-19T18:00:00+01:00 | GWh/d | 100.27 | 211.29 | 311.56 | Failure | GC-2 booster pump failure |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000911_002 | Inactive | Unplanned | Injection unavailability | 2024-04-18T15:39:27+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T15:37:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. NG 908. rev 5702. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000911_001 | Dismissed | Unplanned | Injection unavailability | 2024-04-18T13:57:40+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-19T18:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. NG 908. rev 5702. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000908_002 | Inactive | Unplanned | Injection unavailability | 2024-04-18T13:02:32+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T12:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000908_001 | Dismissed | Unplanned | Injection unavailability | 2024-04-15T13:21:20+01:00 | 2024-04-15T13:20:00+01:00 | 2024-04-18T12:00:00+01:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Injection Comp 2 - 2nd Stage cooling failure. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000893_002 | Inactive | Unplanned | Injection unavailability | 2024-02-26T18:27:54+00:00 | 2024-02-26T17:45:00+00:00 | 2024-02-26T18:30:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Compressor 2 unavailable |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000893_001 | Dismissed | Unplanned | Injection unavailability | 2024-02-26T17:45:57+00:00 | 2024-02-26T17:45:00+00:00 | 2024-02-26T22:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Failure | Compressor 2 unavailable |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000892_002 | Inactive | Planned | Injection unavailability | 2024-02-14T18:16:49+00:00 | 2024-02-14T05:00:00+00:00 | 2024-02-14T18:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Planned Outage | GC-1 HP BD valve replacement |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000892_001 | Dismissed | Planned | Injection unavailability | 2024-02-13T15:01:09+00:00 | 2024-02-14T05:00:00+00:00 | 2024-02-14T18:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Planned Outage | GC-1 HP BD valve replacement |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |
Aldbrough | ALD_000000000000000000887_002 | Dismissed | Planned | Injection unavailability | 2024-02-08T03:16:10+00:00 | 2024-02-08T05:00:00+00:00 | 2024-02-08T18:00:00+00:00 | GWh/d | 111.02 | 200.54 | 311.56 | Planned Outage | GC-2 blow down valve change. |
21YGB-UKGASGRIDW | 55WALDBOROUGH00H | SSE Hornsea Ltd |
A0001033U.UK |