Last update at: 2024-07-26T12:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 6 7 8 9 10 > | ||||||||||||||||||
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009209_001 | Active | Planned | Production unavailability | 2024-07-03T08:12:36+01:00 | 2024-07-23T08:00:00+01:00 | 2024-07-29T17:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009199_002 | Inactive | Planned | Production unavailability | 2024-07-03T00:02:32+01:00 | 2024-06-30T01:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009199_001 | Dismissed | Planned | Production unavailability | 2024-06-30T00:40:47+01:00 | 2024-06-30T01:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_012 | Dismissed | Planned | Production unavailability | 2024-07-02T08:29:33+01:00 | 2024-05-05T10:00:00+01:00 | 2024-07-02T08:09:00+01:00 | MW | 92 | 65 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_011 | Dismissed | Planned | Production unavailability | 2024-06-27T16:48:13+01:00 | 2024-05-05T10:00:00+01:00 | 2024-07-02T16:00:00+01:00 | MW | 92 | 65 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_010 | Dismissed | Planned | Production unavailability | 2024-06-21T11:24:54+01:00 | 2024-05-05T10:00:00+01:00 | 2024-06-28T16:00:00+01:00 | MW | 92 | 65 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_009 | Dismissed | Planned | Production unavailability | 2024-06-21T11:19:07+01:00 | 2024-05-05T10:00:00+01:00 | 2024-06-28T16:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_008 | Dismissed | Planned | Production unavailability | 2024-06-14T08:48:29+01:00 | 2024-05-05T10:00:00+01:00 | 2024-06-21T16:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_007 | Dismissed | Planned | Production unavailability | 2024-06-07T10:33:45+01:00 | 2024-05-05T10:00:00+01:00 | 2024-06-14T16:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_006 | Dismissed | Planned | Production unavailability | 2024-05-22T10:24:36+01:00 | 2024-05-05T10:00:00+01:00 | 2024-06-07T12:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_005 | Dismissed | Planned | Production unavailability | 2024-05-20T09:06:59+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-22T10:30:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_004 | Dismissed | Planned | Production unavailability | 2024-05-15T08:32:56+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-20T10:30:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_003 | Dismissed | Planned | Production unavailability | 2024-05-10T07:31:39+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-15T12:20:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_002 | Dismissed | Planned | Production unavailability | 2024-05-07T17:19:55+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-10T08:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_001 | Dismissed | Planned | Production unavailability | 2024-05-06T07:50:42+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-08T08:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_003 | Inactive | Planned | Consumption unavailability | 2024-07-02T07:32:32+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T06:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_002 | Dismissed | Planned | Consumption unavailability | 2024-07-02T06:15:39+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T06:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_001 | Dismissed | Planned | Consumption unavailability | 2024-07-02T03:45:16+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T10:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_009 | Inactive | Planned | Production unavailability | 2024-06-30T02:02:32+01:00 | 2024-06-17T08:00:00+01:00 | 2024-06-30T01:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_008 | Dismissed | Planned | Production unavailability | 2024-06-30T00:35:11+01:00 | 2024-06-17T08:00:00+01:00 | 2024-06-30T01:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_007 | Dismissed | Planned | Production unavailability | 2024-06-11T08:47:29+01:00 | 2024-06-17T08:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_006 | Dismissed | Planned | Production unavailability | 2024-06-04T13:37:51+01:00 | 2024-06-12T23:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_005 | Dismissed | Planned | Production unavailability | 2024-05-29T11:55:56+01:00 | 2024-06-09T23:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_004 | Dismissed | Planned | Production unavailability | 2024-04-04T16:16:47+01:00 | 2024-06-01T23:00:00+01:00 | 2024-06-26T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_003 | Dismissed | Planned | Production unavailability | 2023-11-24T14:40:48+00:00 | 2024-05-05T23:00:00+01:00 | 2024-05-10T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_002 | Dismissed | Planned | Production unavailability | 2023-10-20T13:16:57+01:00 | 2024-05-22T23:00:00+01:00 | 2024-05-27T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008504_001 | Dismissed | Planned | Production unavailability | 2023-10-20T08:56:35+01:00 | 2024-05-12T23:00:00+01:00 | 2024-05-15T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009193_005 | Inactive | Planned | Consumption unavailability | 2024-06-29T10:02:32+01:00 | 2024-06-27T15:30:00+01:00 | 2024-06-29T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009193_004 | Dismissed | Planned | Consumption unavailability | 2024-06-29T08:38:02+01:00 | 2024-06-27T15:30:00+01:00 | 2024-06-29T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009193_003 | Dismissed | Planned | Consumption unavailability | 2024-06-28T21:12:06+01:00 | 2024-06-27T15:30:00+01:00 | 2024-06-29T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009193_002 | Dismissed | Planned | Consumption unavailability | 2024-06-27T21:00:20+01:00 | 2024-06-27T15:30:00+01:00 | 2024-06-28T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009193_001 | Dismissed | Planned | Consumption unavailability | 2024-06-27T16:50:27+01:00 | 2024-06-27T15:30:00+01:00 | 2024-06-28T00:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009196_004 | Inactive | Planned | Consumption unavailability | 2024-06-29T09:32:32+01:00 | 2024-06-28T11:35:00+01:00 | 2024-06-29T08:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009196_003 | Dismissed | Planned | Consumption unavailability | 2024-06-29T07:58:54+01:00 | 2024-06-28T11:35:00+01:00 | 2024-06-29T08:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009196_002 | Dismissed | Planned | Consumption unavailability | 2024-06-28T21:13:21+01:00 | 2024-06-28T11:35:00+01:00 | 2024-06-29T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009196_001 | Dismissed | Planned | Consumption unavailability | 2024-06-28T08:38:45+01:00 | 2024-06-28T11:35:00+01:00 | 2024-06-28T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009187_004 | Inactive | Planned | Production unavailability | 2024-06-29T02:32:32+01:00 | 2024-06-27T09:44:00+01:00 | 2024-06-29T01:30:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009187_003 | Dismissed | Planned | Production unavailability | 2024-06-28T20:58:03+01:00 | 2024-06-27T09:44:00+01:00 | 2024-06-29T01:30:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009187_002 | Dismissed | Planned | Production unavailability | 2024-06-27T09:44:48+01:00 | 2024-06-27T09:44:00+01:00 | 2024-06-28T23:59:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009187_001 | Dismissed | Planned | Production unavailability | 2024-06-26T10:59:24+01:00 | 2024-06-27T20:00:00+01:00 | 2024-06-28T23:59:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009198_002 | Inactive | Unplanned | Production unavailability | 2024-06-28T18:02:32+01:00 | 2024-06-28T14:40:00+01:00 | 2024-06-28T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009198_001 | Dismissed | Unplanned | Production unavailability | 2024-06-28T15:29:05+01:00 | 2024-06-28T14:40:00+01:00 | 2024-06-28T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009194_003 | Dismissed | Planned | Production unavailability | 2024-06-28T17:26:11+01:00 | 2024-06-28T15:30:00+01:00 | 2024-06-28T16:30:00+01:00 | MW | 300 | 0 | 300 | Shutdown | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009194_002 | Dismissed | Planned | Production unavailability | 2024-06-28T12:31:12+01:00 | 2024-06-28T15:30:00+01:00 | 2024-06-28T16:30:00+01:00 | MW | 300 | 0 | 300 | Shutdown | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009194_001 | Dismissed | Planned | Production unavailability | 2024-06-27T18:01:59+01:00 | 2024-06-28T15:00:00+01:00 | 2024-06-28T16:00:00+01:00 | MW | 300 | 0 | 300 | Shutdown | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009197_002 | Inactive | Unplanned | Production unavailability | 2024-06-28T16:32:32+01:00 | 2024-06-28T13:00:00+01:00 | 2024-06-28T15:30:00+01:00 | MW | 242 | 58 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009197_001 | Dismissed | Unplanned | Production unavailability | 2024-06-28T13:17:55+01:00 | 2024-06-28T13:00:00+01:00 | 2024-06-28T15:30:00+01:00 | MW | 242 | 58 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009115_007 | Inactive | Planned | Production unavailability | 2024-06-28T13:02:32+01:00 | 2024-06-25T11:00:00+01:00 | 2024-06-28T12:00:00+01:00 | MW | 0 | 112 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009115_006 | Dismissed | Planned | Production unavailability | 2024-06-27T09:41:18+01:00 | 2024-06-25T11:00:00+01:00 | 2024-06-28T12:00:00+01:00 | MW | 0 | 112 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009115_005 | Dismissed | Planned | Production unavailability | 2024-06-25T17:26:46+01:00 | 2024-06-25T07:43:00+01:00 | 2024-06-28T12:00:00+01:00 | MW | 34 | 78 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |