Last update at: 2026-01-12T11:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 3 4 5 6 7 > | ||||||||||||||||||
| DBAWO-4 | 48W00000DBAWO-4D | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008255_032 | Dismissed | Planned | Production unavailability | 2024-04-19T13:06:53+00:00 | 2023-07-18T14:00:00+00:00 | 2024-06-05T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-4 | 48W00000DBAWO-4D | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008255_031 | Dismissed | Planned | Production unavailability | 2024-04-19T13:04:52+00:00 | 2023-07-18T14:00:00+00:00 | 2024-06-05T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008254_031 | Dismissed | Planned | Production unavailability | 2024-04-19T13:06:42+00:00 | 2023-07-18T14:00:00+00:00 | 2024-06-13T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008254_030 | Dismissed | Planned | Production unavailability | 2024-04-19T13:05:08+00:00 | 2023-07-18T14:00:00+00:00 | 2024-06-13T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008253_031 | Dismissed | Planned | Production unavailability | 2024-04-19T13:06:21+00:00 | 2023-07-18T14:00:00+00:00 | 2024-05-01T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008253_030 | Dismissed | Planned | Production unavailability | 2024-04-19T13:05:23+00:00 | 2023-07-18T14:00:00+00:00 | 2024-05-01T09:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009024_001 | Dismissed | Planned | Consumption unavailability | 2024-04-17T00:18:12+00:00 | 2024-04-17T00:45:00+00:00 | 2024-04-17T12:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009028_002 | Dismissed | Planned | Production unavailability | 2024-04-17T16:54:52+00:00 | 2024-04-17T16:45:00+00:00 | 2024-04-17T16:50:00+00:00 | MW | 0 | 9 | 9 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_003 | Dismissed | Planned | Production unavailability | 2024-04-16T14:05:58+00:00 | 2024-04-16T13:00:00+00:00 | 2024-04-16T14:00:00+00:00 | MW | 0 | 10 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008884_001 | Dismissed | Planned | Production unavailability | 2024-02-27T08:09:56+00:00 | 2024-03-25T08:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 0 | 126 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008851_002 | Dismissed | Planned | Production unavailability | 2024-02-15T15:39:56+00:00 | 2024-02-15T15:10:00+00:00 | 2024-02-15T15:30:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008851_001 | Dismissed | Planned | Production unavailability | 2024-02-15T15:10:53+00:00 | 2024-02-15T15:10:00+00:00 | 2024-02-15T15:30:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008797_002 | Inactive | Unplanned | Production unavailability | 2024-01-24T18:02:32+00:00 | 2024-01-24T16:00:00+00:00 | 2024-01-24T17:00:00+00:00 | MW | 0 | 160 | 160 | Shutdown | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008797_001 | Dismissed | Unplanned | Production unavailability | 2024-01-24T16:24:14+00:00 | 2024-01-24T16:00:00+00:00 | 2024-01-24T17:00:00+00:00 | MW | 0 | 160 | 160 | Shutdown | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008748_004 | Dismissed | Unplanned | Production unavailability | 2024-01-11T12:31:13+00:00 | 2024-01-11T09:06:00+00:00 | 2024-01-11T12:31:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008748_003 | Dismissed | Unplanned | Production unavailability | 2024-01-11T10:38:26+00:00 | 2024-01-11T09:06:00+00:00 | 2024-01-11T13:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008748_002 | Dismissed | Unplanned | Production unavailability | 2024-01-11T10:00:26+00:00 | 2024-01-11T09:06:00+00:00 | 2024-01-11T11:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008748_001 | Dismissed | Unplanned | Production unavailability | 2024-01-11T09:35:13+00:00 | 2024-01-11T09:06:00+00:00 | 2024-01-11T10:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008732_004 | Inactive | Unplanned | Consumption unavailability | 2024-01-01T17:02:32+00:00 | 2024-01-01T06:05:00+00:00 | 2024-01-01T16:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008733_004 | Inactive | Unplanned | Consumption unavailability | 2024-01-01T17:02:32+00:00 | 2024-01-01T09:22:00+00:00 | 2024-01-01T16:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008733_003 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T14:22:50+00:00 | 2024-01-01T09:22:00+00:00 | 2024-01-01T16:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008732_003 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T14:21:41+00:00 | 2024-01-01T06:05:00+00:00 | 2024-01-01T16:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008732_002 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T13:36:13+00:00 | 2024-01-01T06:05:00+00:00 | 2024-01-01T15:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008733_002 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T13:35:29+00:00 | 2024-01-01T09:22:00+00:00 | 2024-01-01T15:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008733_001 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T09:24:06+00:00 | 2024-01-01T09:22:00+00:00 | 2024-01-01T14:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008732_001 | Dismissed | Unplanned | Consumption unavailability | 2024-01-01T06:05:24+00:00 | 2024-01-01T06:05:00+00:00 | 2024-01-01T14:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008718_001 | Dismissed | Unplanned | Production unavailability | 2023-12-25T19:59:01+00:00 | 2023-12-25T19:48:00+00:00 | 2023-12-25T20:30:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008656_001 | Dismissed | Planned | Production unavailability | 2023-12-04T19:48:18+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T21:00:00+00:00 | MW | 0 | 80 | 80 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008632_002 | Dismissed | Planned | Production unavailability | 2023-12-02T16:41:25+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-05T15:00:00+00:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008568_001 | Dismissed | Planned | Production unavailability | 2023-11-20T00:00:11+00:00 | 2023-11-23T07:00:00+00:00 | 2023-11-23T10:00:00+00:00 | MW | 0 | 126 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_003 | Inactive | Planned | Consumption unavailability | 2023-11-09T17:02:32+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T16:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_002 | Dismissed | Planned | Consumption unavailability | 2023-11-09T09:24:08+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T16:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_001 | Dismissed | Planned | Consumption unavailability | 2023-11-09T05:01:17+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T10:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008453_001 | Dismissed | Planned | Consumption unavailability | 2023-09-28T17:50:33+00:00 | 2023-09-28T18:45:00+00:00 | 2023-09-29T08:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:37:19+00:00 | 2023-09-14T17:31:00+00:00 | 2023-09-29T12:00:00+00:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:35+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:54:18+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_002 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:18+00:00 | 2023-08-31T07:01:00+00:00 | 2023-10-02T08:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:59:51+00:00 | 2023-08-31T07:01:00+00:00 | 2023-10-02T08:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:03+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:48:14+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:24:56+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:44:02+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-09T08:00:00+00:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008379_004 | Dismissed | Planned | Production unavailability | 2023-09-05T11:53:32+00:00 | 2023-09-03T04:00:00+00:00 | 2023-09-29T12:00:00+00:00 | MW | 0 | 300 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008368_004 | Dismissed | Planned | Production unavailability | 2023-09-05T11:52:43+00:00 | 2023-09-02T12:01:00+00:00 | 2023-09-29T12:00:00+00:00 | MW | 0 | 160 | 160 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008385_003 | Dismissed | Planned | Production unavailability | 2023-09-05T11:53:09+00:00 | 2023-09-02T12:01:00+00:00 | 2023-09-29T12:00:00+00:00 | MW | 0 | 140 | 140 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008363_001 | Dismissed | Planned | Consumption unavailability | 2023-08-30T10:46:14+00:00 | 2023-09-01T13:00:00+00:00 | 2023-09-01T17:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |