Last update at: 2026-01-12T11:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 2 3 4 5 6 > | ||||||||||||||||||
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009713_002 | Dismissed | Unplanned | Production unavailability | 2024-12-07T14:25:44+00:00 | 2024-12-07T13:52:00+00:00 | 2024-12-07T23:59:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009713_001 | Dismissed | Unplanned | Production unavailability | 2024-12-07T13:53:45+00:00 | 2024-12-07T13:52:00+00:00 | 2024-12-07T17:01:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009705_001 | Dismissed | Planned | Consumption unavailability | 2024-12-06T09:38:32+00:00 | 2024-12-06T09:30:00+00:00 | 2024-12-06T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009692_001 | Dismissed | Planned | Consumption unavailability | 2024-12-03T16:06:55+00:00 | 2024-12-04T14:00:00+00:00 | 2024-12-04T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009699_002 | Inactive | Unplanned | Production unavailability | 2024-12-04T20:11:13+00:00 | 2024-12-04T17:08:00+00:00 | 2024-12-04T20:15:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009699_001 | Dismissed | Unplanned | Production unavailability | 2024-12-04T17:10:20+00:00 | 2024-12-04T17:08:00+00:00 | 2024-12-04T20:15:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009690_003 | Dismissed | Planned | Consumption unavailability | 2024-12-03T15:59:27+00:00 | 2024-12-03T13:55:00+00:00 | 2024-12-04T14:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009690_002 | Dismissed | Planned | Consumption unavailability | 2024-12-03T15:44:13+00:00 | 2024-12-03T13:55:00+00:00 | 2024-12-03T18:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009690_001 | Dismissed | Planned | Consumption unavailability | 2024-12-03T14:00:13+00:00 | 2024-12-03T13:55:00+00:00 | 2024-12-03T16:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009680_002 | Inactive | Planned | Consumption unavailability | 2024-11-29T16:02:32+00:00 | 2024-11-29T10:00:00+00:00 | 2024-11-29T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009680_001 | Dismissed | Planned | Consumption unavailability | 2024-11-29T09:29:02+00:00 | 2024-11-29T10:00:00+00:00 | 2024-11-29T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009622_003 | Inactive | Unplanned | Production unavailability | 2024-11-14T20:02:32+00:00 | 2024-11-14T16:09:00+00:00 | 2024-11-14T19:00:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009622_002 | Dismissed | Unplanned | Production unavailability | 2024-11-14T18:52:42+00:00 | 2024-11-14T16:09:00+00:00 | 2024-11-14T19:00:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009622_001 | Dismissed | Unplanned | Production unavailability | 2024-11-14T16:10:42+00:00 | 2024-11-14T16:09:00+00:00 | 2024-11-14T20:00:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009538_001 | Inactive | Unplanned | Production unavailability | 2024-10-10T20:39:17+00:00 | 2024-10-10T19:00:00+00:00 | 2024-10-10T19:30:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009463_003 | Inactive | Unplanned | Production unavailability | 2024-09-26T09:02:33+00:00 | 2024-09-26T07:30:00+00:00 | 2024-09-26T08:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009463_002 | Dismissed | Unplanned | Production unavailability | 2024-09-26T07:57:52+00:00 | 2024-09-26T07:30:00+00:00 | 2024-09-26T08:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009463_001 | Dismissed | Unplanned | Production unavailability | 2024-09-26T07:43:27+00:00 | 2024-09-26T07:30:00+00:00 | 2024-09-26T08:30:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009409_001 | Dismissed | Planned | Production unavailability | 2024-09-12T13:26:43+00:00 | 2024-09-24T08:00:00+00:00 | 2024-09-25T17:00:00+00:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009410_001 | Dismissed | Planned | Production unavailability | 2024-09-12T13:27:59+00:00 | 2024-09-24T08:00:00+00:00 | 2024-09-25T17:00:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009408_001 | Dismissed | Planned | Production unavailability | 2024-09-12T13:25:01+00:00 | 2024-09-24T08:00:00+00:00 | 2024-09-25T17:00:00+00:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009412_001 | Dismissed | Planned | Consumption unavailability | 2024-09-12T16:14:25+00:00 | 2024-09-13T09:00:00+00:00 | 2024-09-13T13:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009300_002 | Inactive | Planned | Production unavailability | 2024-08-30T17:02:32+00:00 | 2024-08-29T08:00:00+00:00 | 2024-08-30T16:00:00+00:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009300_001 | Dismissed | Planned | Production unavailability | 2024-08-02T18:40:40+00:00 | 2024-08-29T08:00:00+00:00 | 2024-08-30T16:00:00+00:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009319_002 | Dismissed | Planned | Production unavailability | 2024-08-05T11:53:35+00:00 | 2024-09-07T09:42:00+00:00 | 2024-09-07T09:43:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009319_001 | Dismissed | Planned | Production unavailability | 2024-08-05T11:37:33+00:00 | 2024-09-07T09:42:00+00:00 | 2024-09-07T09:43:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009307_002 | Dismissed | Planned | Production unavailability | 2024-08-05T11:45:25+00:00 | 2024-08-29T08:00:00+00:00 | 2024-08-30T16:00:00+00:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009307_001 | Dismissed | Planned | Production unavailability | 2024-08-03T08:29:45+00:00 | 2024-08-29T08:00:00+00:00 | 2024-08-30T16:00:00+00:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009314_002 | Inactive | Unplanned | Production unavailability | 2024-08-03T17:32:32+00:00 | 2024-08-03T16:14:00+00:00 | 2024-08-03T16:25:00+00:00 | MW | 0 | 165 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009314_001 | Dismissed | Unplanned | Production unavailability | 2024-08-03T16:15:29+00:00 | 2024-08-03T16:14:00+00:00 | 2024-08-03T16:25:00+00:00 | MW | 0 | 165 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009294_001 | Dismissed | Planned | Production unavailability | 2024-08-02T14:49:31+00:00 | 2024-08-29T08:00:00+00:00 | 2024-08-30T16:00:00+00:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_003 | Inactive | Planned | Production unavailability | 2024-07-19T10:17:32+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-19T09:07:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_002 | Dismissed | Planned | Production unavailability | 2024-07-19T08:30:15+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-19T09:07:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_001 | Dismissed | Planned | Production unavailability | 2024-07-18T09:22:35+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-25T00:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009239_002 | Inactive | Planned | Production unavailability | 2024-07-12T13:02:32+00:00 | 2024-07-12T10:00:00+00:00 | 2024-07-12T12:00:00+00:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009239_001 | Dismissed | Planned | Production unavailability | 2024-07-11T16:05:04+00:00 | 2024-07-12T10:00:00+00:00 | 2024-07-12T12:00:00+00:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009236_001 | Dismissed | Unplanned | Consumption unavailability | 2024-07-09T22:54:26+00:00 | 2024-07-09T22:39:00+00:00 | 2024-07-09T23:30:00+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009115_007 | Inactive | Planned | Production unavailability | 2024-06-28T13:02:32+00:00 | 2024-06-25T11:00:00+00:00 | 2024-06-28T12:00:00+00:00 | MW | 0 | 112 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009115_006 | Dismissed | Planned | Production unavailability | 2024-06-27T09:41:18+00:00 | 2024-06-25T11:00:00+00:00 | 2024-06-28T12:00:00+00:00 | MW | 0 | 112 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_003 | Dismissed | Planned | Production unavailability | 2024-05-24T15:29:43+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-27T18:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_002 | Dismissed | Planned | Production unavailability | 2024-05-24T13:41:57+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-07T18:30:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009120_003 | Inactive | Planned | Production unavailability | 2024-05-28T22:02:32+00:00 | 2024-05-28T17:00:00+00:00 | 2024-05-28T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009120_002 | Dismissed | Planned | Production unavailability | 2024-05-27T16:45:57+00:00 | 2024-05-28T17:00:00+00:00 | 2024-05-28T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009120_001 | Dismissed | Planned | Production unavailability | 2024-05-27T16:34:18+00:00 | 2024-05-28T17:00:00+00:00 | 2024-05-28T19:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009074_002 | Inactive | Planned | Consumption unavailability | 2024-05-09T16:02:32+00:00 | 2024-05-09T07:25:00+00:00 | 2024-05-09T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009074_001 | Dismissed | Planned | Consumption unavailability | 2024-05-09T07:21:18+00:00 | 2024-05-09T07:25:00+00:00 | 2024-05-09T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_034 | Dismissed | Planned | Production unavailability | 2024-04-19T13:07:03+00:00 | 2023-07-18T14:00:00+00:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_033 | Dismissed | Planned | Production unavailability | 2024-04-19T13:04:31+00:00 | 2023-07-18T14:00:00+00:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_032 | Dismissed | Planned | Production unavailability | 2024-04-19T13:03:21+00:00 | 2023-07-18T14:00:00+00:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 138 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_031 | Dismissed | Planned | Production unavailability | 2024-04-19T13:02:21+00:00 | 2023-07-18T14:00:00+00:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |