Last update at: 2023-05-31T15:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008129_004 | Inactive | Planned | Production unavailability | 2023-05-23T15:02:32+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008129_003 | Dismissed | Planned | Production unavailability | 2023-05-17T11:43:39+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008129_002 | Dismissed | Planned | Production unavailability | 2023-05-16T23:29:16+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-18T08:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008129_001 | Dismissed | Planned | Production unavailability | 2023-05-16T13:26:05+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008133_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:44:10+01:00 | 2023-05-18T12:01:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008133_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:36:11+01:00 | 2023-05-18T12:01:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008071_004 | Inactive | Planned | Production unavailability | 2023-05-02T13:32:32+01:00 | 2023-04-23T12:01:00+01:00 | 2023-05-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008071_003 | Dismissed | Planned | Production unavailability | 2023-04-22T12:09:01+01:00 | 2023-04-23T12:01:00+01:00 | 2023-05-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008071_002 | Dismissed | Planned | Production unavailability | 2023-04-13T17:38:52+01:00 | 2023-04-23T14:01:00+01:00 | 2023-05-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008071_001 | Dismissed | Planned | Production unavailability | 2023-04-05T16:32:55+01:00 | 2023-04-23T16:01:00+01:00 | 2023-05-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008070_004 | Inactive | Planned | Production unavailability | 2023-04-23T13:02:32+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008070_003 | Dismissed | Planned | Production unavailability | 2023-04-22T12:08:31+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008070_002 | Dismissed | Planned | Production unavailability | 2023-04-13T17:38:06+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T14:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008070_001 | Dismissed | Planned | Production unavailability | 2023-04-05T16:31:14+01:00 | 2023-04-17T08:00:00+01:00 | 2023-04-23T16:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008069_003 | Inactive | Planned | Production unavailability | 2023-04-20T09:02:32+01:00 | 2023-04-06T08:01:00+01:00 | 2023-04-20T07:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008069_002 | Dismissed | Planned | Production unavailability | 2023-04-13T17:37:39+01:00 | 2023-04-06T08:01:00+01:00 | 2023-04-20T07:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008069_001 | Dismissed | Planned | Production unavailability | 2023-04-05T16:29:47+01:00 | 2023-04-06T08:01:00+01:00 | 2023-04-17T07:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_006 | Inactive | Planned | Production unavailability | 2023-04-02T13:32:32+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_005 | Dismissed | Planned | Production unavailability | 2023-03-31T17:41:50+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_004 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:40+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:23:16+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:38:31+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_006 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:27:08+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:40+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:20+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:21:53+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:36:25+00:00 | 2023-03-25T23:59:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_004 | Dismissed | Planned | Production unavailability | 2023-02-24T18:39:23+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_002 | Dismissed | Planned | Production unavailability | 2023-01-12T11:44:47+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000006466_010 | Dismissed | Planned | Production unavailability | 2022-12-22T12:22:51+00:00 | 2023-08-08T00:01:00+01:00 | 2023-11-21T23:59:00+00:00 | MW | 0 | 893 | 893 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_003 | Dismissed | Planned | Production unavailability | 2022-12-21T13:09:15+00:00 | 2023-05-15T06:00:00+01:00 | 2023-06-11T23:59:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_002 | Dismissed | Planned | Production unavailability | 2022-12-19T16:21:58+00:00 | 2023-06-09T06:00:00+01:00 | 2023-06-13T23:59:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_001 | Dismissed | Planned | Production unavailability | 2022-11-04T13:40:19+00:00 | 2023-06-07T06:00:00+01:00 | 2023-06-13T23:59:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007614_006 | Dismissed | Planned | Production unavailability | 2022-12-19T15:36:56+00:00 | 2023-06-13T06:00:00+01:00 | 2023-06-13T20:00:00+01:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000007961_001 | Dismissed | Planned | Production unavailability | 2023-02-17T03:58:40+00:00 | 2023-02-26T17:00:00+00:00 | 2023-02-28T10:30:00+00:00 | MW | 0 | 893 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007484_005 | Dismissed | Planned | Production unavailability | 2022-11-04T13:13:01+00:00 | 2023-03-14T12:00:00+00:00 | 2023-05-10T11:59:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007484_004 | Dismissed | Planned | Production unavailability | 2022-10-17T17:28:10+01:00 | 2023-01-16T06:00:00+00:00 | 2023-05-01T11:59:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007911_014 | Inactive | Unplanned | Production unavailability | 2023-01-29T08:32:32+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 168 | 168 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007911_013 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:31:10+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 168 | 168 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007912_013 | Inactive | Unplanned | Production unavailability | 2023-01-29T08:32:32+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 168 | 168 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007910_013 | Inactive | Unplanned | Production unavailability | 2023-01-29T08:32:32+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007910_012 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:30:45+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007909_012 | Inactive | Unplanned | Production unavailability | 2023-01-29T08:32:32+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007912_012 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:31:34+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 168 | 168 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007911_011 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:28:14+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 168 | 168 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007910_011 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:29:07+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007909_011 | Dismissed | Unplanned | Production unavailability | 2023-01-29T06:30:18+00:00 | 2023-01-25T11:20:00+00:00 | 2023-01-29T07:30:00+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Control System |
Wind Offshore | 10YGB----------A |