Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 3 4 5 6 7 >
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_008 Dismissed Planned Production unavailability 2024-07-12T08:29:14+01:00 2024-07-09T10:00:00+01:00 2024-07-12T11:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_008 Dismissed Planned Production unavailability 2024-07-12T08:29:39+01:00 2024-07-09T10:00:00+01:00 2024-07-12T11:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_007 Dismissed Planned Production unavailability 2024-07-12T00:53:24+01:00 2024-07-09T10:00:00+01:00 2024-07-12T09:30:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_007 Dismissed Planned Production unavailability 2024-07-12T00:53:45+01:00 2024-07-09T10:00:00+01:00 2024-07-12T09:30:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_007 Dismissed Planned Production unavailability 2024-07-12T00:53:05+01:00 2024-07-09T10:00:00+01:00 2024-07-12T09:30:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_006 Dismissed Planned Production unavailability 2024-07-11T20:43:21+01:00 2024-07-09T10:00:00+01:00 2024-07-12T12:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_006 Dismissed Planned Production unavailability 2024-07-11T20:43:45+01:00 2024-07-09T10:00:00+01:00 2024-07-12T12:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_006 Dismissed Planned Production unavailability 2024-07-11T20:44:22+01:00 2024-07-09T10:00:00+01:00 2024-07-12T12:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_005 Dismissed Planned Production unavailability 2024-07-11T17:34:19+01:00 2024-07-09T10:00:00+01:00 2024-07-11T21:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_005 Dismissed Planned Production unavailability 2024-07-11T17:35:47+01:00 2024-07-09T10:00:00+01:00 2024-07-11T21:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_005 Dismissed Planned Production unavailability 2024-07-11T17:36:20+01:00 2024-07-09T10:00:00+01:00 2024-07-11T21:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_004 Dismissed Planned Production unavailability 2024-07-11T17:30:23+01:00 2024-07-09T10:00:00+01:00 2024-07-11T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_004 Dismissed Planned Production unavailability 2024-07-11T17:31:12+01:00 2024-07-09T10:00:00+01:00 2024-07-11T20:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_004 Dismissed Planned Production unavailability 2024-07-11T17:31:53+01:00 2024-07-09T10:00:00+01:00 2024-07-11T20:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_003 Dismissed Planned Production unavailability 2024-07-11T09:05:49+01:00 2024-07-09T10:00:00+01:00 2024-07-11T18:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_003 Dismissed Planned Production unavailability 2024-07-11T09:03:59+01:00 2024-07-09T10:00:00+01:00 2024-07-11T18:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_003 Dismissed Planned Production unavailability 2024-07-11T09:05:00+01:00 2024-07-09T10:00:00+01:00 2024-07-11T18:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_002 Dismissed Planned Production unavailability 2024-07-05T09:19:47+01:00 2024-07-09T10:00:00+01:00 2024-07-11T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_002 Dismissed Planned Production unavailability 2024-07-05T09:20:40+01:00 2024-07-09T10:00:00+01:00 2024-07-11T17:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_002 Dismissed Planned Production unavailability 2024-07-05T09:18:43+01:00 2024-07-09T10:00:00+01:00 2024-07-11T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009205_001 Dismissed Planned Production unavailability 2024-07-03T07:58:49+01:00 2024-07-08T18:00:00+01:00 2024-07-11T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009207_001 Dismissed Planned Production unavailability 2024-07-03T08:01:09+01:00 2024-07-08T18:00:00+01:00 2024-07-11T17:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009206_001 Dismissed Planned Production unavailability 2024-07-03T07:59:53+01:00 2024-07-08T18:00:00+01:00 2024-07-11T17:00:00+01:00 MW 112 0 112 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_010 Inactive Planned Production unavailability 2024-07-12T13:02:32+01:00 2024-06-06T23:00:00+01:00 2024-07-12T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_009 Dismissed Planned Production unavailability 2024-01-23T15:17:17+00:00 2024-06-06T23:00:00+01:00 2024-07-12T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_008 Dismissed Planned Production unavailability 2023-12-18T11:00:04+00:00 2024-06-06T23:00:00+01:00 2024-08-01T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_007 Dismissed Planned Production unavailability 2023-10-20T18:08:11+01:00 2024-06-08T23:00:00+01:00 2024-08-03T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_006 Dismissed Planned Production unavailability 2023-08-09T12:00:28+01:00 2024-06-06T23:00:00+01:00 2024-07-18T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_005 Dismissed Planned Production unavailability 2022-11-21T12:41:29+00:00 2024-06-06T23:00:00+01:00 2024-06-28T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_004 Dismissed Planned Production unavailability 2022-10-26T16:36:29+01:00 2024-06-07T23:00:00+01:00 2024-06-29T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_003 Dismissed Planned Production unavailability 2022-08-05T15:14:33+01:00 2024-06-07T23:00:00+01:00 2024-06-17T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009239_002 Inactive Planned Production unavailability 2024-07-12T13:02:32+01:00 2024-07-12T10:00:00+01:00 2024-07-12T12:00:00+01:00 MW 0 100 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_002 Dismissed Planned Production unavailability 2022-03-23T10:54:49+00:00 2024-06-07T23:00:00+01:00 2024-06-17T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009239_001 Dismissed Planned Production unavailability 2024-07-11T16:05:04+01:00 2024-07-12T10:00:00+01:00 2024-07-12T12:00:00+01:00 MW 0 100 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000006040_001 Dismissed Planned Production unavailability 2021-05-11T11:49:34+01:00 2024-06-07T23:00:00+01:00 2024-06-17T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009033_003 Inactive Planned Production unavailability 2024-07-12T11:02:32+01:00 2024-07-01T08:00:00+01:00 2024-07-12T10:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009033_002 Dismissed Planned Production unavailability 2024-07-11T16:03:46+01:00 2024-07-01T08:00:00+01:00 2024-07-12T10:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009033_001 Dismissed Planned Production unavailability 2024-04-19T10:31:15+01:00 2024-07-01T08:00:00+01:00 2024-07-12T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009093_005 Inactive Planned Production unavailability 2024-07-09T19:32:32+01:00 2024-07-06T07:00:00+01:00 2024-07-09T18:30:00+01:00 MW 160 0 160 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009094_005 Inactive Planned Production unavailability 2024-07-09T19:32:32+01:00 2024-07-06T07:00:00+01:00 2024-07-09T18:30:00+01:00 MW 140 0 140 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009093_004 Dismissed Planned Production unavailability 2024-07-09T15:27:41+01:00 2024-07-06T07:00:00+01:00 2024-07-09T18:30:00+01:00 MW 160 0 160 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009094_004 Dismissed Planned Production unavailability 2024-07-09T15:28:27+01:00 2024-07-06T07:00:00+01:00 2024-07-09T18:30:00+01:00 MW 140 0 140 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009094_003 Dismissed Planned Production unavailability 2024-07-03T21:35:54+01:00 2024-07-06T07:00:00+01:00 2024-07-10T19:00:00+01:00 MW 140 0 140 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009093_003 Dismissed Planned Production unavailability 2024-07-03T21:34:57+01:00 2024-07-06T07:00:00+01:00 2024-07-10T19:00:00+01:00 MW 160 0 160 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009093_002 Dismissed Planned Production unavailability 2024-05-29T15:52:33+01:00 2024-07-06T07:00:00+01:00 2024-07-11T19:00:00+01:00 MW 160 0 160 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009094_002 Dismissed Planned Production unavailability 2024-05-29T15:53:41+01:00 2024-07-06T07:00:00+01:00 2024-07-11T19:00:00+01:00 MW 140 0 140 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009093_001 Dismissed Planned Production unavailability 2024-05-20T17:13:47+01:00 2024-07-09T09:00:00+01:00 2024-07-12T17:00:00+01:00 MW 160 0 160 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009094_001 Dismissed Planned Production unavailability 2024-05-20T17:17:28+01:00 2024-07-05T09:00:00+01:00 2024-07-08T17:00:00+01:00 MW 140 0 140 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009123_007 Inactive Planned Production unavailability 2024-07-08T22:47:32+01:00 2024-07-02T23:00:00+01:00 2024-07-08T21:40:00+01:00 MW 180 1000 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009123_006 Dismissed Planned Production unavailability 2024-07-08T21:39:12+01:00 2024-07-02T23:00:00+01:00 2024-07-08T21:40:00+01:00 MW 180 1000 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A