Last update at: 2023-09-26T18:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | ||||||||||||||||||
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_005 | Dismissed | Planned | Production unavailability | 2023-08-07T15:55:56+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-30T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_004 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:24+00:00 | 2024-07-01T08:00:00+01:00 | 2024-07-19T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_003 | Dismissed | Planned | Production unavailability | 2022-02-18T14:33:53+00:00 | 2024-07-01T08:00:00+01:00 | 2024-07-19T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_002 | Dismissed | Planned | Production unavailability | 2022-01-12T15:20:50+00:00 | 2024-07-01T08:00:00+01:00 | 2024-08-09T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_001 | Dismissed | Planned | Production unavailability | 2021-05-24T19:40:13+01:00 | 2024-07-01T08:00:00+01:00 | 2024-07-31T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000006073_003 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2024-06-03T08:00:00+01:00 | 2024-06-21T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000006073_002 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:24+00:00 | 2024-06-03T08:00:00+01:00 | 2024-06-21T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000006073_001 | Dismissed | Planned | Production unavailability | 2021-05-24T19:47:30+01:00 | 2024-06-03T08:00:00+01:00 | 2024-06-21T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_013 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_012 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:24+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_011 | Dismissed | Planned | Production unavailability | 2020-11-24T10:59:58+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_010 | Dismissed | Planned | Production unavailability | 2019-01-25T14:03:35+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_009 | Dismissed | Planned | Production unavailability | 2018-10-26T09:01:14+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_008 | Dismissed | Planned | Production unavailability | 2018-10-05T07:46:17+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_007 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:18+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_006 | Dismissed | Planned | Production unavailability | 2018-03-02T12:09:30+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_005 | Dismissed | Planned | Production unavailability | 2017-11-17T09:21:19+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_004 | Dismissed | Planned | Production unavailability | 2017-11-17T09:14:32+00:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_003 | Dismissed | Planned | Production unavailability | 2017-07-20T15:44:43+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_002 | Dismissed | Planned | Production unavailability | 2015-05-20T06:40:00+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_014 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_013 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:24+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_012 | Dismissed | Planned | Production unavailability | 2020-11-24T10:59:58+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_011 | Dismissed | Planned | Production unavailability | 2019-01-25T14:03:35+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_010 | Dismissed | Planned | Production unavailability | 2018-10-26T09:01:14+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_009 | Dismissed | Planned | Production unavailability | 2018-10-05T07:46:17+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_008 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:18+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_007 | Dismissed | Planned | Production unavailability | 2018-03-02T12:09:30+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_006 | Dismissed | Planned | Production unavailability | 2017-11-17T09:21:19+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_005 | Dismissed | Planned | Production unavailability | 2017-11-17T09:14:32+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_004 | Dismissed | Planned | Production unavailability | 2017-07-20T15:43:47+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_003 | Dismissed | Planned | Production unavailability | 2016-02-17T12:41:04+00:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_002 | Dismissed | Planned | Production unavailability | 2015-05-20T06:42:19+01:00 | 2016-03-31T23:59:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_018 | Active | Planned | Production unavailability | 2023-09-25T11:12:05+01:00 | 2023-06-03T14:26:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_017 | Dismissed | Planned | Production unavailability | 2023-07-19T17:39:26+01:00 | 2023-06-03T14:26:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_016 | Dismissed | Planned | Production unavailability | 2023-06-23T17:20:51+01:00 | 2023-06-03T14:26:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_015 | Dismissed | Planned | Production unavailability | 2023-06-10T02:58:24+01:00 | 2023-06-03T14:26:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_014 | Dismissed | Planned | Production unavailability | 2023-06-09T15:32:19+01:00 | 2023-06-03T14:00:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_013 | Dismissed | Planned | Production unavailability | 2023-06-03T14:22:21+01:00 | 2023-06-03T14:00:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_012 | Dismissed | Planned | Production unavailability | 2023-06-03T14:15:37+01:00 | 2023-06-03T14:00:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_011 | Dismissed | Planned | Production unavailability | 2023-05-26T09:13:37+01:00 | 2023-05-26T12:30:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_010 | Dismissed | Planned | Production unavailability | 2023-05-24T11:32:12+01:00 | 2023-05-28T13:00:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_009 | Dismissed | Planned | Production unavailability | 2023-05-24T10:03:14+01:00 | 2023-06-04T00:00:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_008 | Dismissed | Planned | Production unavailability | 2023-05-22T17:49:42+01:00 | 2023-05-25T13:00:00+01:00 | 2023-06-06T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_007 | Dismissed | Planned | Production unavailability | 2023-05-19T17:14:47+01:00 | 2023-05-23T13:00:00+01:00 | 2023-06-06T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_006 | Dismissed | Planned | Production unavailability | 2023-05-16T13:29:32+01:00 | 2023-05-23T14:00:00+01:00 | 2023-06-06T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_005 | Dismissed | Planned | Production unavailability | 2023-04-22T12:05:33+01:00 | 2023-04-23T12:01:00+01:00 | 2023-06-06T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_004 | Dismissed | Planned | Production unavailability | 2023-04-19T11:50:16+01:00 | 2023-04-23T14:01:00+01:00 | 2023-06-06T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_003 | Dismissed | Planned | Production unavailability | 2023-04-13T17:36:27+01:00 | 2023-04-23T14:01:00+01:00 | 2023-05-11T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_002 | Dismissed | Planned | Production unavailability | 2023-04-05T16:27:14+01:00 | 2023-04-23T16:01:00+01:00 | 2023-05-11T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |