Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_006 | Active | Planned | Production unavailability | 2023-05-31T15:15:31+01:00 | 2024-05-17T22:00:00+01:00 | 2024-06-09T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_005 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_004 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:49+00:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_003 | Dismissed | Planned | Production unavailability | 2021-07-28T08:46:33+01:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_002 | Dismissed | Planned | Production unavailability | 2020-11-24T11:00:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-25T00:00:00+00:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_001 | Dismissed | Planned | Production unavailability | 2020-06-15T21:38:47+01:00 | 2024-03-04T00:00:00+00:00 | 2024-03-25T00:00:00+00:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_003 | Inactive | Planned | Production unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_003 | Inactive | Planned | Production unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_002 | Dismissed | Planned | Production unavailability | 2023-05-30T16:25:47+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_002 | Dismissed | Planned | Production unavailability | 2023-05-30T16:24:47+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_001 | Dismissed | Planned | Production unavailability | 2023-05-30T15:28:01+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_001 | Dismissed | Planned | Production unavailability | 2023-05-30T15:25:51+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008148_003 | Inactive | Planned | Production unavailability | 2023-05-31T07:02:32+01:00 | 2023-05-26T12:30:00+01:00 | 2023-05-31T05:59:00+01:00 | MW | 80 | 60 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008148_002 | Dismissed | Planned | Production unavailability | 2023-05-26T09:22:23+01:00 | 2023-05-26T12:30:00+01:00 | 2023-05-31T05:59:00+01:00 | MW | 80 | 60 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008148_001 | Dismissed | Planned | Production unavailability | 2023-05-24T11:35:01+01:00 | 2023-05-28T13:00:00+01:00 | 2023-05-31T05:59:00+01:00 | MW | 80 | 60 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008162_002 | Inactive | Planned | Production unavailability | 2023-05-30T17:32:31+01:00 | 2023-05-30T09:30:00+01:00 | 2023-05-30T16:30:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008162_001 | Dismissed | Planned | Production unavailability | 2023-05-30T09:20:59+01:00 | 2023-05-30T09:30:00+01:00 | 2023-05-30T16:30:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008163_002 | Dismissed | Planned | Production unavailability | 2023-05-30T11:14:28+01:00 | 2023-05-30T10:30:00+01:00 | 2023-05-30T11:00:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008163_001 | Dismissed | Planned | Production unavailability | 2023-05-30T10:27:42+01:00 | 2023-05-30T10:30:00+01:00 | 2023-05-30T11:00:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008161_001 | Active | Planned | Production unavailability | 2023-05-29T16:06:45+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008160_001 | Active | Planned | Production unavailability | 2023-05-29T16:04:29+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_008 | Inactive | Unplanned | Production unavailability | 2023-05-28T13:32:32+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-28T12:29:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_007 | Dismissed | Unplanned | Production unavailability | 2023-05-26T09:15:21+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-28T12:29:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_006 | Dismissed | Unplanned | Production unavailability | 2023-05-24T11:32:42+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-28T12:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_005 | Dismissed | Unplanned | Production unavailability | 2023-05-24T10:03:59+01:00 | 2023-05-16T10:56:00+01:00 | 2023-06-04T12:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_004 | Dismissed | Unplanned | Production unavailability | 2023-05-22T17:49:26+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-25T12:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_003 | Dismissed | Unplanned | Production unavailability | 2023-05-19T17:15:54+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-23T12:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_002 | Dismissed | Unplanned | Production unavailability | 2023-05-16T13:28:00+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_001 | Dismissed | Unplanned | Production unavailability | 2023-05-16T10:56:27+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-17T11:00:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_008 | Inactive | Planned | Production unavailability | 2023-05-26T14:02:32+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_007 | Dismissed | Planned | Production unavailability | 2023-05-26T09:29:08+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_006 | Dismissed | Planned | Production unavailability | 2023-05-24T11:35:23+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-28T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_006 | Inactive | Planned | Production unavailability | 2023-05-26T14:02:32+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_005 | Dismissed | Planned | Production unavailability | 2023-05-26T09:21:06+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_005 | Dismissed | Planned | Production unavailability | 2023-05-24T10:06:56+01:00 | 2023-05-16T13:20:00+01:00 | 2023-06-04T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_004 | Dismissed | Planned | Production unavailability | 2023-05-22T17:47:12+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-25T13:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_004 | Dismissed | Planned | Production unavailability | 2023-05-24T11:33:15+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-28T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_003 | Dismissed | Planned | Production unavailability | 2023-05-24T10:04:35+01:00 | 2023-05-21T12:01:00+01:00 | 2023-06-04T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_003 | Dismissed | Planned | Production unavailability | 2023-05-17T11:50:30+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_002 | Dismissed | Planned | Production unavailability | 2023-05-16T23:12:46+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-18T08:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_002 | Dismissed | Planned | Production unavailability | 2023-05-22T17:48:30+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-25T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_001 | Dismissed | Planned | Production unavailability | 2023-05-19T17:21:03+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-23T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_001 | Dismissed | Planned | Production unavailability | 2023-05-16T13:18:26+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_008 | Inactive | Unplanned | Production unavailability | 2023-05-26T13:32:32+01:00 | 2023-05-16T12:29:00+01:00 | 2023-05-26T12:29:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_007 | Dismissed | Unplanned | Production unavailability | 2023-05-26T09:12:41+01:00 | 2023-05-16T12:29:00+01:00 | 2023-05-26T12:29:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_006 | Dismissed | Unplanned | Production unavailability | 2023-05-24T11:30:29+01:00 | 2023-05-16T10:53:00+01:00 | 2023-05-28T12:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_005 | Dismissed | Unplanned | Production unavailability | 2023-05-24T10:02:16+01:00 | 2023-05-16T10:53:00+01:00 | 2023-06-04T12:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_004 | Dismissed | Unplanned | Production unavailability | 2023-05-22T17:49:56+01:00 | 2023-05-16T10:53:00+01:00 | 2023-05-25T12:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_003 | Dismissed | Unplanned | Production unavailability | 2023-05-19T17:14:23+01:00 | 2023-05-16T10:53:00+01:00 | 2023-05-23T12:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_002 | Dismissed | Unplanned | Production unavailability | 2023-05-16T13:28:25+01:00 | 2023-05-16T10:53:00+01:00 | 2023-05-23T13:59:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |