Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 2 3 4 5 6 >
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_007 Active Planned Production unavailability 2018-11-23T16:12:07+00:00 2021-12-14T23:00:00+00:00 2021-12-21T23:00:00+00:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_001 Dismissed Planned Production unavailability 2017-11-07T14:47:47+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_007 Active Planned Production unavailability 2018-11-23T16:10:14+00:00 2022-03-11T23:00:00+00:00 2022-03-18T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_001 Dismissed Planned Production unavailability 2017-11-07T14:49:43+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_007 Active Planned Production unavailability 2018-11-23T16:07:21+00:00 2021-08-19T23:00:00+01:00 2021-08-26T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_001 Dismissed Planned Production unavailability 2017-11-07T14:45:38+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_007 Active Planned Production unavailability 2018-11-23T16:03:50+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_001 Dismissed Planned Production unavailability 2017-11-07T14:36:16+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_007 Active Planned Production unavailability 2018-11-23T16:01:48+00:00 2019-10-25T23:00:00+01:00 2019-11-01T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_001 Dismissed Planned Production unavailability 2017-11-07T14:30:32+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_007 Active Planned Production unavailability 2018-11-23T15:58:12+00:00 2019-12-06T23:00:00+00:00 2019-12-13T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_001 Dismissed Planned Production unavailability 2017-11-07T14:32:16+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004017_001 Active Planned Production unavailability 2018-11-22T16:50:13+00:00 2019-04-01T23:00:00+01:00 2019-06-04T14:00:00+01:00 MW 506 0 506 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-3 48W000000FIDL-32
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004016_001 Active Planned Production unavailability 2018-11-22T16:45:43+00:00 2019-04-22T23:00:00+01:00 2019-06-11T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_007 Inactive Unplanned Production unavailability 2018-11-22T12:32:32+00:00 2018-11-22T05:55:00+00:00 2018-11-22T11:30:00+00:00 MW 106 400 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_006 Dismissed Unplanned Production unavailability 2018-11-22T11:28:17+00:00 2018-11-22T05:55:00+00:00 2018-11-22T11:30:00+00:00 MW 106 400 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_005 Dismissed Unplanned Production unavailability 2018-11-22T10:49:27+00:00 2018-11-22T05:55:00+00:00 2018-11-22T12:00:00+00:00 MW 106 400 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_004 Dismissed Unplanned Production unavailability 2018-11-22T10:23:14+00:00 2018-11-22T05:55:00+00:00 2018-11-22T12:00:00+00:00 MW 156 350 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_003 Dismissed Unplanned Production unavailability 2018-11-22T09:43:26+00:00 2018-11-22T05:55:00+00:00 2018-11-22T12:00:00+00:00 MW 206 300 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004015_002 Dismissed Unplanned Production unavailability 2018-11-22T08:48:43+00:00 2018-11-22T05:55:00+00:00 2018-11-22T10:00:00+00:00 MW 266 240 506 Failure
Plant Fault - Turbine
Fossil Hard coal 10YGB----------A