Last update at: 2023-09-25T01:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 5 6 7 8 9 > | ||||||||||||||||||
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008228_004 | Dismissed | Planned | Production unavailability | 2023-07-07T02:50:12+01:00 | 2023-07-07T05:00:00+01:00 | 2023-07-07T06:00:00+01:00 | MW | 460 | 250 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008228_003 | Dismissed | Planned | Production unavailability | 2023-07-07T01:48:06+01:00 | 2023-07-07T04:00:00+01:00 | 2023-07-07T05:00:00+01:00 | MW | 460 | 250 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008228_002 | Dismissed | Planned | Production unavailability | 2023-07-06T23:42:46+01:00 | 2023-07-07T03:00:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 460 | 250 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008228_001 | Dismissed | Planned | Production unavailability | 2023-07-06T21:55:31+01:00 | 2023-07-07T05:00:00+01:00 | 2023-07-07T06:00:00+01:00 | MW | 460 | 250 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008227_005 | Inactive | Planned | Production unavailability | 2023-07-07T06:02:31+01:00 | 2023-07-07T04:00:00+01:00 | 2023-07-07T05:00:00+01:00 | MW | 560 | 150 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008227_004 | Dismissed | Planned | Production unavailability | 2023-07-07T02:48:49+01:00 | 2023-07-07T04:00:00+01:00 | 2023-07-07T05:00:00+01:00 | MW | 560 | 150 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008227_003 | Dismissed | Planned | Production unavailability | 2023-07-07T01:45:50+01:00 | 2023-07-07T03:00:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 560 | 150 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008227_002 | Dismissed | Planned | Production unavailability | 2023-07-06T23:42:17+01:00 | 2023-07-07T02:00:00+01:00 | 2023-07-07T03:00:00+01:00 | MW | 560 | 150 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008227_001 | Dismissed | Planned | Production unavailability | 2023-07-06T21:54:15+01:00 | 2023-07-07T04:00:00+01:00 | 2023-07-07T05:00:00+01:00 | MW | 560 | 150 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_007 | Inactive | Planned | Production unavailability | 2023-07-07T05:02:31+01:00 | 2023-07-06T21:50:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 660 | 50 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_006 | Dismissed | Planned | Production unavailability | 2023-07-07T02:47:21+01:00 | 2023-07-06T21:50:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 660 | 50 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_005 | Dismissed | Planned | Production unavailability | 2023-07-07T01:43:35+01:00 | 2023-07-06T21:50:00+01:00 | 2023-07-07T03:00:00+01:00 | MW | 660 | 50 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_004 | Dismissed | Planned | Production unavailability | 2023-07-06T23:41:33+01:00 | 2023-07-06T21:50:00+01:00 | 2023-07-07T02:00:00+01:00 | MW | 660 | 50 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_003 | Dismissed | Planned | Production unavailability | 2023-07-06T21:50:51+01:00 | 2023-07-06T21:50:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 660 | 50 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_002 | Dismissed | Planned | Production unavailability | 2023-07-06T20:23:07+01:00 | 2023-07-06T14:15:00+01:00 | 2023-07-07T04:00:00+01:00 | MW | 610 | 100 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008224_001 | Dismissed | Planned | Production unavailability | 2023-07-05T16:39:33+01:00 | 2023-07-06T14:15:00+01:00 | 2023-07-06T23:00:00+01:00 | MW | 610 | 100 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_007 | Inactive | Planned | Production unavailability | 2023-07-07T01:02:32+01:00 | 2023-05-31T13:00:00+01:00 | 2023-07-07T00:00:00+01:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_006 | Dismissed | Planned | Production unavailability | 2023-07-05T13:40:47+01:00 | 2023-05-31T13:00:00+01:00 | 2023-07-07T00:00:00+01:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_005 | Dismissed | Planned | Production unavailability | 2023-07-04T14:28:04+01:00 | 2023-05-31T13:00:00+01:00 | 2023-07-19T05:59:00+01:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_004 | Dismissed | Planned | Production unavailability | 2023-05-24T11:33:39+01:00 | 2023-05-31T13:00:00+01:00 | 2023-07-16T05:59:00+01:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_003 | Dismissed | Planned | Production unavailability | 2023-05-24T10:06:16+01:00 | 2023-06-04T13:00:00+01:00 | 2023-07-16T05:59:00+01:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_002 | Dismissed | Planned | Production unavailability | 2023-05-22T17:48:10+01:00 | 2023-05-25T13:00:00+01:00 | 2023-06-02T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_001 | Dismissed | Planned | Production unavailability | 2023-05-19T17:22:14+01:00 | 2023-05-23T13:00:00+01:00 | 2023-06-02T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008223_002 | Inactive | Planned | Production unavailability | 2023-07-06T15:17:32+01:00 | 2023-07-06T12:00:00+01:00 | 2023-07-06T14:15:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008223_001 | Dismissed | Planned | Production unavailability | 2023-07-05T16:34:49+01:00 | 2023-07-06T12:00:00+01:00 | 2023-07-06T14:15:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:54:34+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_002 | Dismissed | Planned | Production unavailability | 2023-06-30T16:49:47+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_001 | Dismissed | Planned | Production unavailability | 2023-06-23T19:40:27+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_005 | Dismissed | Planned | Production unavailability | 2023-06-30T16:48:38+01:00 | 2023-07-07T12:01:00+01:00 | 2023-07-16T12:00:00+01:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_004 | Dismissed | Planned | Production unavailability | 2023-06-09T15:36:06+01:00 | 2023-07-07T12:01:00+01:00 | 2023-07-16T12:00:00+01:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_003 | Dismissed | Planned | Production unavailability | 2023-05-24T10:03:35+01:00 | 2023-06-16T06:00:00+01:00 | 2023-07-16T05:59:00+01:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_002 | Dismissed | Planned | Production unavailability | 2023-05-19T17:15:26+01:00 | 2023-06-06T06:00:00+01:00 | 2023-07-16T05:59:00+01:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_001 | Dismissed | Planned | Production unavailability | 2023-04-19T11:55:06+01:00 | 2023-06-06T06:00:00+01:00 | 2023-07-16T05:59:00+01:00 | MW | 70 | 230 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:44:39+01:00 | 2023-06-21T12:00:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_002 | Dismissed | Planned | Production unavailability | 2023-06-09T15:40:56+01:00 | 2023-06-21T12:00:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_001 | Dismissed | Planned | Production unavailability | 2023-05-19T17:46:30+01:00 | 2023-06-16T12:01:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_003 | Inactive | Unplanned | Production unavailability | 2023-06-26T13:02:32+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-26T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_002 | Dismissed | Unplanned | Production unavailability | 2023-06-23T17:23:59+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-26T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_001 | Dismissed | Unplanned | Production unavailability | 2023-06-09T15:46:14+01:00 | 2023-06-03T14:26:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_014 | Inactive | Planned | Production unavailability | 2023-06-21T13:02:33+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_013 | Dismissed | Planned | Production unavailability | 2023-06-09T15:39:50+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_012 | Dismissed | Planned | Production unavailability | 2023-06-03T14:50:10+01:00 | 2023-06-03T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_011 | Dismissed | Planned | Production unavailability | 2023-06-03T14:49:42+01:00 | 2023-05-26T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_010 | Dismissed | Planned | Production unavailability | 2023-05-26T09:29:42+01:00 | 2023-05-26T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_009 | Dismissed | Planned | Production unavailability | 2023-05-24T11:36:21+01:00 | 2023-05-28T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_008 | Dismissed | Planned | Production unavailability | 2023-05-24T10:07:59+01:00 | 2023-06-04T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_007 | Dismissed | Planned | Production unavailability | 2023-05-22T17:47:47+01:00 | 2023-05-25T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_006 | Dismissed | Planned | Production unavailability | 2023-05-19T17:44:54+01:00 | 2023-05-23T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_005 | Dismissed | Planned | Production unavailability | 2023-05-16T13:19:17+01:00 | 2023-05-23T14:00:00+01:00 | 2023-05-29T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_004 | Dismissed | Planned | Production unavailability | 2023-05-15T17:14:06+01:00 | 2023-05-16T00:00:00+01:00 | 2023-05-29T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |