Last update at: 2026-01-12T11:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 2 3 4 5 6 > | ||||||||||||||||||
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009733_002 | Dismissed | Unplanned | Production unavailability | 2024-12-13T11:37:33+00:00 | 2024-12-13T11:32:00+00:00 | 2024-12-13T11:36:00+00:00 | MW | 0 | 15 | 15 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009733_001 | Dismissed | Unplanned | Production unavailability | 2024-12-13T11:33:17+00:00 | 2024-12-13T11:32:00+00:00 | 2024-12-13T11:36:00+00:00 | MW | 1 | 14 | 15 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_007 | Inactive | Planned | Production unavailability | 2024-11-22T18:02:35+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_007 | Inactive | Planned | Production unavailability | 2024-11-22T18:02:35+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_006 | Dismissed | Planned | Production unavailability | 2024-11-15T10:41:50+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_006 | Dismissed | Planned | Production unavailability | 2024-11-15T10:42:04+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_005 | Dismissed | Planned | Production unavailability | 2024-11-08T10:49:21+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-15T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_005 | Dismissed | Planned | Production unavailability | 2024-11-08T10:49:36+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-15T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_004 | Dismissed | Planned | Production unavailability | 2024-11-04T14:22:05+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_004 | Dismissed | Planned | Production unavailability | 2024-11-04T14:22:05+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_003 | Dismissed | Planned | Production unavailability | 2024-11-01T11:20:09+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_003 | Dismissed | Planned | Production unavailability | 2024-11-01T11:19:58+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_002 | Dismissed | Planned | Production unavailability | 2024-10-25T10:58:49+00:00 | 2024-10-18T12:21:00+00:00 | 2024-11-01T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_002 | Dismissed | Planned | Production unavailability | 2024-10-25T10:58:20+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-01T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_001 | Dismissed | Planned | Production unavailability | 2024-10-22T12:16:33+00:00 | 2024-10-18T12:18:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009558_001 | Dismissed | Planned | Production unavailability | 2024-10-22T12:15:12+00:00 | 2024-10-18T12:21:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009566_003 | Inactive | Planned | Production unavailability | 2024-10-28T18:02:32+00:00 | 2024-10-28T16:00:00+00:00 | 2024-10-28T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009566_002 | Dismissed | Planned | Production unavailability | 2024-10-28T08:15:28+00:00 | 2024-10-28T16:00:00+00:00 | 2024-10-28T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009566_001 | Dismissed | Planned | Production unavailability | 2024-10-25T10:06:27+00:00 | 2024-10-28T15:00:00+00:00 | 2024-10-28T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009565_003 | Inactive | Planned | Production unavailability | 2024-10-28T17:02:32+00:00 | 2024-10-28T15:00:00+00:00 | 2024-10-28T16:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009565_002 | Dismissed | Planned | Production unavailability | 2024-10-28T08:16:34+00:00 | 2024-10-28T15:00:00+00:00 | 2024-10-28T16:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009565_001 | Dismissed | Planned | Production unavailability | 2024-10-25T10:00:50+00:00 | 2024-10-28T15:00:00+00:00 | 2024-10-28T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009563_002 | Dismissed | Planned | Production unavailability | 2024-10-25T14:01:33+00:00 | 2024-10-25T15:00:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009563_001 | Dismissed | Planned | Production unavailability | 2024-10-25T09:51:31+00:00 | 2024-10-25T15:00:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009564_002 | Dismissed | Planned | Production unavailability | 2024-10-25T14:00:29+00:00 | 2024-10-25T15:00:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009564_001 | Dismissed | Planned | Production unavailability | 2024-10-25T09:55:32+00:00 | 2024-10-25T15:00:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_008 | Inactive | Planned | Production unavailability | 2024-10-18T18:02:32+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_007 | Inactive | Planned | Production unavailability | 2024-10-18T18:02:32+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_007 | Dismissed | Planned | Production unavailability | 2024-10-11T14:00:34+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_006 | Dismissed | Planned | Production unavailability | 2024-10-04T11:30:37+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-11T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_006 | Dismissed | Planned | Production unavailability | 2024-10-11T14:00:14+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_005 | Dismissed | Planned | Production unavailability | 2024-10-04T11:31:54+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-11T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_005 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_004 | Dismissed | Planned | Production unavailability | 2024-10-01T10:55:08+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_004 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:26+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:15+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 105 | 52 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:59:06+00:00 | 2024-09-20T23:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:58:44+00:00 | 2024-09-20T23:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:49:52+00:00 | 2024-09-20T20:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:48:35+00:00 | 2024-09-20T20:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009527_001 | Dismissed | Planned | Production unavailability | 2024-10-09T07:19:12+00:00 | 2024-10-10T08:00:00+00:00 | 2024-10-11T18:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_011 | Inactive | Planned | Production unavailability | 2024-09-20T09:02:32+00:00 | 2024-07-24T17:00:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_010 | Dismissed | Planned | Production unavailability | 2024-09-20T07:56:54+00:00 | 2024-07-24T17:00:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_009 | Dismissed | Planned | Production unavailability | 2024-09-13T15:45:45+00:00 | 2024-07-24T17:00:00+00:00 | 2024-09-20T17:00:00+00:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_008 | Dismissed | Planned | Production unavailability | 2024-09-06T09:51:15+00:00 | 2024-07-24T17:00:00+00:00 | 2024-09-13T17:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_008 | Inactive | Planned | Production unavailability | 2024-09-20T09:02:32+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_007 | Dismissed | Planned | Production unavailability | 2024-09-20T07:57:21+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_007 | Dismissed | Planned | Production unavailability | 2024-08-22T10:33:49+00:00 | 2024-07-24T17:00:00+00:00 | 2024-09-06T17:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009277_006 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:40+00:00 | 2024-07-24T17:00:00+00:00 | 2024-08-23T17:00:00+00:00 | MW | 107 | 50 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |