Last update at: 2023-05-31T15:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | ||||||||||||||||||
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008049_002 | Dismissed | Planned | Production unavailability | 2023-03-28T14:13:50+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:33:31+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_002 | Dismissed | Planned | Production unavailability | 2022-12-19T16:19:53+00:00 | 2023-04-13T06:00:00+01:00 | 2023-06-09T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_001 | Dismissed | Planned | Production unavailability | 2022-11-04T13:38:12+00:00 | 2023-04-09T06:00:00+01:00 | 2023-06-07T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:43:51+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-17T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008049_001 | Dismissed | Planned | Production unavailability | 2023-03-28T11:55:54+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_006 | Inactive | Planned | Production unavailability | 2023-04-02T13:32:32+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_005 | Dismissed | Planned | Production unavailability | 2023-03-31T17:41:50+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_004 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:40+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:23:16+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:38:31+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008030_002 | Dismissed | Planned | Production unavailability | 2023-04-01T01:12:20+01:00 | 2023-04-02T12:00:00+01:00 | 2023-04-29T11:59:00+01:00 | MW | 210 | 148 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008030_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:52:16+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-29T11:59:00+01:00 | MW | 210 | 148 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 278 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_006 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:42+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 278 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_006 | Dismissed | Planned | Production unavailability | 2023-03-28T14:25:51+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_006 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:27:08+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:23:13+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:26:46+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:13:05+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:57+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:40+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:20+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_003 | Dismissed | Planned | Production unavailability | 2023-03-28T11:54:03+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:14:57+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:31:41+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_002 | Dismissed | Planned | Production unavailability | 2023-03-20T15:22:24+00:00 | 2023-03-21T09:00:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:21:53+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:36:25+00:00 | 2023-03-25T23:59:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:49:30+00:00 | 2023-03-21T10:01:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:42:21+00:00 | 2023-03-21T10:01:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_007 | Inactive | Planned | Production unavailability | 2023-03-26T02:02:31+01:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_006 | Dismissed | Planned | Production unavailability | 2023-03-17T20:33:45+00:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_005 | Dismissed | Planned | Production unavailability | 2023-03-14T16:21:02+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-29T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_004 | Dismissed | Planned | Production unavailability | 2023-02-24T18:39:23+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_003 | Dismissed | Planned | Production unavailability | 2023-01-23T14:21:55+00:00 | 2023-01-01T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_002 | Dismissed | Planned | Production unavailability | 2023-01-12T11:44:47+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_001 | Dismissed | Planned | Production unavailability | 2022-12-21T13:27:53+00:00 | 2023-02-18T06:00:00+00:00 | 2023-03-25T05:59:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_006 | Inactive | Planned | Production unavailability | 2023-03-21T11:02:32+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_005 | Dismissed | Planned | Production unavailability | 2023-03-17T20:40:25+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_004 | Dismissed | Planned | Production unavailability | 2023-03-15T15:06:54+00:00 | 2023-03-16T14:51:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_003 | Dismissed | Planned | Production unavailability | 2023-03-14T14:38:55+00:00 | 2023-03-16T13:01:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_002 | Dismissed | Planned | Production unavailability | 2023-02-25T07:32:19+00:00 | 2023-03-19T13:01:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_006 | Inactive | Planned | Production unavailability | 2023-03-21T10:02:32+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T09:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_005 | Dismissed | Planned | Production unavailability | 2023-03-20T15:20:49+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T09:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_004 | Dismissed | Planned | Production unavailability | 2023-03-17T20:47:37+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |