This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-01-12T11:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 2 3 4 5 6 >
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009733_002 Dismissed Unplanned Production unavailability 2024-12-13T11:37:33+00:00 2024-12-13T11:32:00+00:00 2024-12-13T11:36:00+00:00 MW 0 15 15 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009733_001 Dismissed Unplanned Production unavailability 2024-12-13T11:33:17+00:00 2024-12-13T11:32:00+00:00 2024-12-13T11:36:00+00:00 MW 1 14 15 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_007 Inactive Planned Production unavailability 2024-11-22T18:02:35+00:00 2024-10-18T12:21:00+00:00 2024-11-22T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_007 Inactive Planned Production unavailability 2024-11-22T18:02:35+00:00 2024-10-18T12:18:00+00:00 2024-11-22T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_006 Dismissed Planned Production unavailability 2024-11-15T10:41:50+00:00 2024-10-18T12:21:00+00:00 2024-11-22T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_006 Dismissed Planned Production unavailability 2024-11-15T10:42:04+00:00 2024-10-18T12:18:00+00:00 2024-11-22T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_005 Dismissed Planned Production unavailability 2024-11-08T10:49:21+00:00 2024-10-18T12:18:00+00:00 2024-11-15T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_005 Dismissed Planned Production unavailability 2024-11-08T10:49:36+00:00 2024-10-18T12:21:00+00:00 2024-11-15T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_004 Dismissed Planned Production unavailability 2024-11-04T14:22:05+00:00 2024-10-18T12:21:00+00:00 2024-11-08T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_004 Dismissed Planned Production unavailability 2024-11-04T14:22:05+00:00 2024-10-18T12:18:00+00:00 2024-11-08T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_003 Dismissed Planned Production unavailability 2024-11-01T11:20:09+00:00 2024-10-18T12:18:00+00:00 2024-11-08T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_003 Dismissed Planned Production unavailability 2024-11-01T11:19:58+00:00 2024-10-18T12:21:00+00:00 2024-11-08T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_002 Dismissed Planned Production unavailability 2024-10-25T10:58:49+00:00 2024-10-18T12:21:00+00:00 2024-11-01T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_002 Dismissed Planned Production unavailability 2024-10-25T10:58:20+00:00 2024-10-18T12:18:00+00:00 2024-11-01T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_001 Dismissed Planned Production unavailability 2024-10-22T12:16:33+00:00 2024-10-18T12:18:00+00:00 2024-10-25T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009558_001 Dismissed Planned Production unavailability 2024-10-22T12:15:12+00:00 2024-10-18T12:21:00+00:00 2024-10-25T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009566_003 Inactive Planned Production unavailability 2024-10-28T18:02:32+00:00 2024-10-28T16:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009566_002 Dismissed Planned Production unavailability 2024-10-28T08:15:28+00:00 2024-10-28T16:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009566_001 Dismissed Planned Production unavailability 2024-10-25T10:06:27+00:00 2024-10-28T15:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009565_003 Inactive Planned Production unavailability 2024-10-28T17:02:32+00:00 2024-10-28T15:00:00+00:00 2024-10-28T16:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009565_002 Dismissed Planned Production unavailability 2024-10-28T08:16:34+00:00 2024-10-28T15:00:00+00:00 2024-10-28T16:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009565_001 Dismissed Planned Production unavailability 2024-10-25T10:00:50+00:00 2024-10-28T15:00:00+00:00 2024-10-28T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009563_002 Dismissed Planned Production unavailability 2024-10-25T14:01:33+00:00 2024-10-25T15:00:00+00:00 2024-10-25T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009563_001 Dismissed Planned Production unavailability 2024-10-25T09:51:31+00:00 2024-10-25T15:00:00+00:00 2024-10-25T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009564_002 Dismissed Planned Production unavailability 2024-10-25T14:00:29+00:00 2024-10-25T15:00:00+00:00 2024-10-25T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009564_001 Dismissed Planned Production unavailability 2024-10-25T09:55:32+00:00 2024-10-25T15:00:00+00:00 2024-10-25T17:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_008 Inactive Planned Production unavailability 2024-10-18T18:02:32+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_007 Inactive Planned Production unavailability 2024-10-18T18:02:32+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_007 Dismissed Planned Production unavailability 2024-10-11T14:00:34+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_006 Dismissed Planned Production unavailability 2024-10-04T11:30:37+00:00 2024-09-20T23:00:00+00:00 2024-10-11T17:00:00+00:00 MW 66 91 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_006 Dismissed Planned Production unavailability 2024-10-11T14:00:14+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_005 Dismissed Planned Production unavailability 2024-10-04T11:31:54+00:00 2024-09-20T23:00:00+00:00 2024-10-11T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_005 Dismissed Planned Production unavailability 2024-10-03T12:19:37+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_004 Dismissed Planned Production unavailability 2024-10-01T10:55:08+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_004 Dismissed Planned Production unavailability 2024-10-03T12:19:37+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_003 Dismissed Planned Production unavailability 2024-09-27T12:35:26+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_003 Dismissed Planned Production unavailability 2024-09-27T12:35:15+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 105 52 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_002 Dismissed Planned Production unavailability 2024-09-20T13:59:06+00:00 2024-09-20T23:00:00+00:00 2024-09-27T17:00:00+00:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_002 Dismissed Planned Production unavailability 2024-09-20T13:58:44+00:00 2024-09-20T23:00:00+00:00 2024-09-27T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_001 Dismissed Planned Production unavailability 2024-09-20T10:49:52+00:00 2024-09-20T20:00:00+00:00 2024-09-27T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009453_001 Dismissed Planned Production unavailability 2024-09-20T10:48:35+00:00 2024-09-20T20:00:00+00:00 2024-09-27T17:00:00+00:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009527_001 Dismissed Planned Production unavailability 2024-10-09T07:19:12+00:00 2024-10-10T08:00:00+00:00 2024-10-11T18:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_011 Inactive Planned Production unavailability 2024-09-20T09:02:32+00:00 2024-07-24T17:00:00+00:00 2024-09-20T08:00:00+00:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_010 Dismissed Planned Production unavailability 2024-09-20T07:56:54+00:00 2024-07-24T17:00:00+00:00 2024-09-20T08:00:00+00:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_009 Dismissed Planned Production unavailability 2024-09-13T15:45:45+00:00 2024-07-24T17:00:00+00:00 2024-09-20T17:00:00+00:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_008 Dismissed Planned Production unavailability 2024-09-06T09:51:15+00:00 2024-07-24T17:00:00+00:00 2024-09-13T17:00:00+00:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_008 Inactive Planned Production unavailability 2024-09-20T09:02:32+00:00 2024-08-09T11:29:00+00:00 2024-09-20T08:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_007 Dismissed Planned Production unavailability 2024-09-20T07:57:21+00:00 2024-08-09T11:29:00+00:00 2024-09-20T08:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_007 Dismissed Planned Production unavailability 2024-08-22T10:33:49+00:00 2024-07-24T17:00:00+00:00 2024-09-06T17:00:00+00:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_006 Dismissed Planned Production unavailability 2024-08-16T10:41:40+00:00 2024-07-24T17:00:00+00:00 2024-08-23T17:00:00+00:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A