Last update at: 2018-06-21T22:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003781_002 Dismissed Planned Production unavailability 2018-05-02T07:52:31+01:00 2018-05-02T09:00:00+01:00 2018-05-02T10:00:00+01:00 MW 240 940 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003781_001 Dismissed Planned Production unavailability 2018-04-27T13:54:51+01:00 2018-05-02T09:00:00+01:00 2018-05-02T10:30:00+01:00 MW 300 880 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003789_002 Dismissed Planned Production unavailability 2018-05-02T10:44:16+01:00 2018-05-03T09:00:00+01:00 2018-05-03T10:30:00+01:00 MW 300 880 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003789_001 Dismissed Planned Production unavailability 2018-04-27T14:12:24+01:00 2018-05-03T09:00:00+01:00 2018-05-03T10:30:00+01:00 MW 300 880 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003786_002 Dismissed Planned Production unavailability 2018-05-02T10:42:56+01:00 2018-05-02T18:30:00+01:00 2018-05-02T19:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003786_001 Dismissed Planned Production unavailability 2018-04-27T14:04:08+01:00 2018-05-02T18:30:00+01:00 2018-05-02T19:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003785_002 Dismissed Planned Production unavailability 2018-05-02T10:38:07+01:00 2018-05-02T17:00:00+01:00 2018-05-02T18:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003785_001 Dismissed Planned Production unavailability 2018-04-27T14:00:52+01:00 2018-05-02T17:00:00+01:00 2018-05-02T18:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003787_002 Dismissed Planned Production unavailability 2018-05-02T10:37:49+01:00 2018-05-02T19:30:00+01:00 2018-05-02T20:00:00+01:00 MW 380 800 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003787_001 Dismissed Planned Production unavailability 2018-04-27T14:05:41+01:00 2018-05-02T19:30:00+01:00 2018-05-02T20:00:00+01:00 MW 380 800 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003779_002 Inactive Planned Production unavailability 2018-05-01T20:16:52+01:00 2018-05-01T18:15:00+01:00 2018-05-01T19:15:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003779_001 Dismissed Planned Production unavailability 2018-04-27T13:46:31+01:00 2018-05-01T18:15:00+01:00 2018-05-01T19:15:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003780_002 Dismissed Planned Production unavailability 2018-05-01T17:16:18+01:00 2018-05-01T20:00:00+01:00 2018-05-02T09:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003780_001 Dismissed Planned Production unavailability 2018-04-27T13:52:56+01:00 2018-05-01T20:00:00+01:00 2018-05-02T09:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003778_002 Dismissed Planned Production unavailability 2018-05-01T17:15:09+01:00 2018-05-01T17:45:00+01:00 2018-05-01T18:15:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003778_001 Dismissed Planned Production unavailability 2018-04-27T13:44:14+01:00 2018-05-01T17:45:00+01:00 2018-05-01T18:15:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003777_002 Inactive Planned Production unavailability 2018-05-01T15:01:52+01:00 2018-05-01T13:00:00+01:00 2018-05-01T14:00:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003777_001 Dismissed Planned Production unavailability 2018-04-27T13:42:15+01:00 2018-05-01T13:00:00+01:00 2018-05-01T14:00:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003776_002 Inactive Planned Production unavailability 2018-05-01T14:01:53+01:00 2018-05-01T12:00:00+01:00 2018-05-01T13:00:00+01:00 MW 250 930 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003776_001 Dismissed Planned Production unavailability 2018-04-27T13:40:45+01:00 2018-05-01T12:00:00+01:00 2018-05-01T13:00:00+01:00 MW 250 930 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003775_002 Inactive Planned Production unavailability 2018-05-01T13:01:52+01:00 2018-05-01T09:00:00+01:00 2018-05-01T12:00:00+01:00 MW 300 880 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003775_001 Dismissed Planned Production unavailability 2018-04-27T13:35:12+01:00 2018-05-01T09:00:00+01:00 2018-05-01T12:00:00+01:00 MW 300 880 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000003716_005 Inactive Planned Production unavailability 2018-04-13T12:46:52+01:00 2018-04-12T08:30:00+01:00 2018-04-13T11:40:00+01:00 MW 100 0 100 Foreseen Maintenance
Commissioning
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000003716_004 Dismissed Planned Production unavailability 2018-04-13T11:39:54+01:00 2018-04-12T08:30:00+01:00 2018-04-13T11:40:00+01:00 MW 100 0 100 Foreseen Maintenance
Commissioning
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000003716_003 Dismissed Planned Production unavailability 2018-04-13T10:59:03+01:00 2018-04-12T08:30:00+01:00 2018-04-13T14:30:00+01:00 MW 100 0 100 Foreseen Maintenance
Commissioning
Hydro Water Reservoir 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003733_004 Inactive Planned Production unavailability 2018-03-28T21:31:52+01:00 2018-03-28T18:45:00+01:00 2018-03-28T20:30:00+01:00 MW 100 1080 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003733_003 Dismissed Planned Production unavailability 2018-03-28T20:22:20+01:00 2018-03-28T18:45:00+01:00 2018-03-28T20:30:00+01:00 MW 100 1080 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003733_002 Dismissed Planned Production unavailability 2018-03-28T19:51:46+01:00 2018-03-28T18:45:00+01:00 2018-03-28T20:20:00+01:00 MW 100 1080 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003733_001 Dismissed Planned Production unavailability 2018-03-28T16:39:44+01:00 2018-03-28T18:45:00+01:00 2018-03-28T19:35:00+01:00 MW 160 1020 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003731_002 Inactive Planned Production unavailability 2018-03-28T19:46:52+01:00 2018-03-28T18:15:00+01:00 2018-03-28T18:45:00+01:00 MW 240 940 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003731_001 Dismissed Planned Production unavailability 2018-03-28T16:37:48+01:00 2018-03-28T18:15:00+01:00 2018-03-28T18:45:00+01:00 MW 240 940 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003730_002 Inactive Planned Production unavailability 2018-03-28T19:16:52+01:00 2018-03-28T17:15:00+01:00 2018-03-28T18:15:00+01:00 MW 330 850 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003730_001 Dismissed Planned Production unavailability 2018-03-28T16:35:02+01:00 2018-03-28T17:15:00+01:00 2018-03-28T18:15:00+01:00 MW 330 850 1180 Failure
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_008 Inactive Planned Production unavailability 2018-03-17T15:31:52+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:30:00+00:00 MW 360 350 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_007 Dismissed Planned Production unavailability 2018-03-17T14:15:00+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:30:00+00:00 MW 360 350 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_006 Dismissed Planned Production unavailability 2018-03-17T14:07:18+00:00 2018-03-17T08:15:00+00:00 2018-03-17T15:00:00+00:00 MW 360 350 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_005 Dismissed Planned Production unavailability 2018-03-17T13:50:56+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:00:00+00:00 MW 360 350 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_004 Dismissed Planned Production unavailability 2018-03-17T12:53:32+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:00:00+00:00 MW 435 275 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_003 Dismissed Planned Production unavailability 2018-03-17T11:42:34+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:00:00+00:00 MW 570 140 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_002 Dismissed Planned Production unavailability 2018-03-17T11:17:36+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:00:00+00:00 MW 630 80 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003696_001 Dismissed Planned Production unavailability 2018-03-17T07:06:45+00:00 2018-03-17T08:15:00+00:00 2018-03-17T14:00:00+00:00 MW 680 30 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003691_003 Inactive Planned Production unavailability 2018-03-17T09:16:52+00:00 2018-03-17T00:00:00+00:00 2018-03-17T08:15:00+00:00 MW 370 340 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003691_002 Dismissed Planned Production unavailability 2018-03-17T07:02:28+00:00 2018-03-17T00:00:00+00:00 2018-03-17T08:15:00+00:00 MW 370 340 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003691_001 Dismissed Planned Production unavailability 2018-03-16T10:22:59+00:00 2018-03-17T00:00:00+00:00 2018-03-17T08:30:00+00:00 MW 370 340 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003690_005 Dismissed Planned Production unavailability 2018-03-16T15:26:54+00:00 2018-03-16T08:31:00+00:00 2018-03-16T22:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003690_004 Dismissed Planned Production unavailability 2018-03-16T14:19:02+00:00 2018-03-16T08:31:00+00:00 2018-03-16T15:05:00+00:00 MW 515 195 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003690_003 Dismissed Planned Production unavailability 2018-03-16T12:40:31+00:00 2018-03-16T08:31:00+00:00 2018-03-16T15:05:00+00:00 MW 610 100 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003690_002 Dismissed Planned Production unavailability 2018-03-16T08:27:46+00:00 2018-03-16T08:31:00+00:00 2018-03-16T15:05:00+00:00 MW 680 30 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003690_001 Dismissed Planned Production unavailability 2018-03-16T07:28:39+00:00 2018-03-16T08:31:00+00:00 2018-03-16T15:05:00+00:00 MW 610 100 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003631_002 Inactive Planned Production unavailability 2018-02-12T12:01:52+00:00 2018-02-12T06:00:00+00:00 2018-02-12T11:00:00+00:00 MW 690 20 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A