This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2026-01-12T11:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010100_002 Dismissed Unplanned Production unavailability 2025-04-29T17:51:38+00:00 2025-04-25T17:00:59+00:00 2025-05-01T09:00:19+00:00 MW 57 29 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010100_001 Dismissed Unplanned Production unavailability 2025-04-29T17:47:35+00:00 2025-04-25T09:00:59+00:00 2025-05-01T09:00:19+00:00 MW 57 29 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010086_002 Inactive Planned Production unavailability 2025-04-29T18:02:33+00:00 2025-04-22T09:00:01+00:00 2025-04-29T17:00:13+00:00 MW 0 117 117 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010086_001 Dismissed Planned Production unavailability 2025-04-22T08:51:52+00:00 2025-04-22T09:00:01+00:00 2025-04-29T17:00:13+00:00 MW 0 117 117 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_008 Inactive Planned Production unavailability 2025-04-28T18:02:32+00:00 2025-03-12T10:50:29+00:00 2025-04-28T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_007 Dismissed Planned Production unavailability 2025-04-17T10:44:45+00:00 2025-03-12T10:50:29+00:00 2025-04-28T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_006 Dismissed Planned Production unavailability 2025-04-11T10:56:29+00:00 2025-03-12T10:50:29+00:00 2025-04-22T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_005 Dismissed Planned Production unavailability 2025-04-04T10:52:27+00:00 2025-03-12T10:50:29+00:00 2025-04-14T17:00:50+00:00 MW 26 52 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_004 Dismissed Planned Production unavailability 2025-03-31T10:43:21+00:00 2025-03-12T10:50:29+00:00 2025-04-04T17:00:50+00:00 MW 26 52 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_003 Dismissed Planned Production unavailability 2025-03-21T10:42:51+00:00 2025-03-12T10:50:29+00:00 2025-03-31T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_002 Dismissed Planned Production unavailability 2025-03-14T11:19:16+00:00 2025-03-12T10:50:29+00:00 2025-03-21T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_001 Dismissed Planned Production unavailability 2025-03-12T12:46:43+00:00 2025-03-12T10:50:29+00:00 2025-03-14T17:00:50+00:00 MW 52 26 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_005 Inactive Planned Production unavailability 2025-04-28T10:02:32+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_004 Dismissed Planned Production unavailability 2025-04-26T08:05:50+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_003 Dismissed Planned Production unavailability 2025-04-25T12:05:08+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 75 11 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_002 Dismissed Planned Production unavailability 2025-04-24T16:51:57+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_001 Dismissed Planned Production unavailability 2025-04-18T11:42:11+00:00 2025-04-22T09:00:00+00:00 2025-04-25T09:00:00+00:00 MW 68 18 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010078_002 Inactive Planned Production unavailability 2025-04-22T10:02:32+00:00 2025-04-19T09:00:00+00:00 2025-04-22T09:00:00+00:00 MW 64 22 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010078_001 Dismissed Planned Production unavailability 2025-04-18T11:37:42+00:00 2025-04-19T09:00:00+00:00 2025-04-22T09:00:00+00:00 MW 64 22 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_016 Inactive Planned Production unavailability 2025-04-19T10:02:32+00:00 2025-04-10T17:41:00+00:00 2025-04-19T09:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_015 Dismissed Planned Production unavailability 2025-04-18T11:37:29+00:00 2025-04-10T17:41:00+00:00 2025-04-19T09:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_014 Dismissed Planned Production unavailability 2025-04-17T20:06:21+00:00 2025-04-10T17:41:00+00:00 2025-04-21T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_013 Dismissed Planned Production unavailability 2025-04-15T19:19:24+00:00 2025-04-10T17:41:00+00:00 2025-04-19T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_012 Dismissed Planned Production unavailability 2025-04-14T15:59:51+00:00 2025-04-10T17:41:00+00:00 2025-04-16T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_011 Dismissed Planned Production unavailability 2025-04-14T10:58:35+00:00 2025-04-10T17:41:00+00:00 2025-04-16T17:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_010 Dismissed Planned Production unavailability 2025-04-11T11:17:09+00:00 2025-04-10T17:41:00+00:00 2025-04-14T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_009 Dismissed Planned Production unavailability 2025-04-10T18:13:31+00:00 2025-04-10T17:41:00+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_008 Dismissed Planned Production unavailability 2025-04-10T18:06:12+00:00 2025-04-10T17:40:00+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_007 Dismissed Planned Production unavailability 2025-04-10T17:57:32+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_006 Dismissed Planned Production unavailability 2025-04-10T17:54:24+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_005 Dismissed Planned Production unavailability 2025-04-10T17:49:35+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_004 Dismissed Planned Production unavailability 2025-04-10T17:46:12+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_003 Dismissed Planned Production unavailability 2025-04-10T17:44:35+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_002 Dismissed Planned Production unavailability 2025-04-10T17:42:23+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_001 Dismissed Planned Production unavailability 2025-04-10T17:41:01+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010048_005 Inactive Unplanned Production unavailability 2025-04-10T18:47:33+00:00 2025-04-09T17:11:48+00:00 2025-04-10T17:39:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010048_004 Dismissed Unplanned Production unavailability 2025-04-10T17:38:41+00:00 2025-04-09T17:11:48+00:00 2025-04-10T17:39:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010048_003 Dismissed Unplanned Production unavailability 2025-04-10T15:34:38+00:00 2025-04-09T17:11:48+00:00 2025-04-10T18:00:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010048_002 Dismissed Unplanned Production unavailability 2025-04-09T18:42:37+00:00 2025-04-09T17:11:48+00:00 2025-04-10T16:00:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010048_001 Dismissed Unplanned Production unavailability 2025-04-09T17:12:27+00:00 2025-04-09T17:11:48+00:00 2025-04-09T20:30:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_006 Inactive Planned Production unavailability 2025-04-09T18:17:32+00:00 2025-04-09T15:20:39+00:00 2025-04-09T17:11:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_005 Dismissed Planned Production unavailability 2025-04-09T17:10:27+00:00 2025-04-09T15:20:39+00:00 2025-04-09T17:11:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_004 Dismissed Planned Production unavailability 2025-04-09T16:26:10+00:00 2025-04-09T15:20:39+00:00 2025-04-09T20:30:00+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_003 Dismissed Planned Production unavailability 2025-04-09T16:21:21+00:00 2025-04-09T15:20:39+00:00 2025-04-09T20:30:47+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_002 Dismissed Planned Production unavailability 2025-04-09T16:07:06+00:00 2025-04-09T15:20:39+00:00 2025-04-09T19:30:47+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010045_001 Dismissed Planned Production unavailability 2025-04-09T16:00:14+00:00 2025-04-09T15:20:39+00:00 2025-04-09T19:30:47+00:00 MW 86 0 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010039_004 Inactive Planned Production unavailability 2025-04-09T15:59:19+00:00 2025-04-05T15:00:22+00:00 2025-04-12T18:00:01+00:00 MW 22 64 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010039_003 Dismissed Planned Production unavailability 2025-04-09T15:59:07+00:00 2025-04-05T15:00:22+00:00 2025-04-12T18:00:01+00:00 MW 22 64 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010039_002 Dismissed Planned Production unavailability 2025-04-09T15:56:55+00:00 2025-04-05T15:00:22+00:00 2025-04-09T17:20:01+00:00 MW 22 64 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010039_001 Dismissed Planned Production unavailability 2025-04-05T18:15:15+00:00 2025-04-05T15:00:22+00:00 2025-04-12T18:00:01+00:00 MW 22 64 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C