This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2022-06-30T01:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_003 Inactive Planned Production unavailability 2022-06-24T20:02:33+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:58:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_002 Dismissed Planned Production unavailability 2022-06-24T10:27:51+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:58:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_001 Dismissed Planned Production unavailability 2022-06-23T23:39:06+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:51:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007325_003 Inactive Planned Production unavailability 2022-06-24T19:02:33+01:00 2022-06-24T17:30:00+01:00 2022-06-24T17:55:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007325_002 Dismissed Planned Production unavailability 2022-06-24T10:27:00+01:00 2022-06-24T17:30:00+01:00 2022-06-24T17:55:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007325_001 Dismissed Planned Production unavailability 2022-06-23T23:34:12+01:00 2022-06-24T17:30:00+01:00 2022-06-24T17:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007324_004 Inactive Planned Production unavailability 2022-06-24T18:02:33+01:00 2022-06-24T16:30:00+01:00 2022-06-24T16:54:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007324_003 Dismissed Planned Production unavailability 2022-06-24T10:26:19+01:00 2022-06-24T16:30:00+01:00 2022-06-24T16:54:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007324_002 Dismissed Planned Production unavailability 2022-06-23T23:32:38+01:00 2022-06-24T16:30:00+01:00 2022-06-24T16:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007324_001 Dismissed Planned Production unavailability 2022-06-23T23:32:20+01:00 2022-06-24T16:30:00+01:00 2022-06-24T16:46:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007224_002 Dismissed Planned Production unavailability 2022-06-24T16:52:46+01:00 2022-06-25T17:30:00+01:00 2022-06-26T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007224_001 Dismissed Planned Production unavailability 2022-06-09T09:20:40+01:00 2022-06-25T17:30:00+01:00 2022-06-26T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007225_003 Dismissed Planned Production unavailability 2022-06-24T16:52:25+01:00 2022-06-26T16:30:00+01:00 2022-06-27T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007225_002 Dismissed Planned Production unavailability 2022-06-13T13:46:58+01:00 2022-06-26T16:30:00+01:00 2022-06-27T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007225_001 Dismissed Planned Production unavailability 2022-06-09T09:22:24+01:00 2022-06-26T16:30:00+01:00 2022-06-27T00:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007323_002 Inactive Planned Production unavailability 2022-06-24T16:47:33+01:00 2022-06-24T15:30:00+01:00 2022-06-24T15:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007323_001 Dismissed Planned Production unavailability 2022-06-23T23:30:49+01:00 2022-06-24T15:30:00+01:00 2022-06-24T15:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007259_003 Dismissed Planned Production unavailability 2022-06-24T16:39:54+01:00 2022-06-29T06:31:00+01:00 2022-06-29T13:30:00+01:00 MW 160 733 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007259_002 Dismissed Planned Production unavailability 2022-06-13T14:40:55+01:00 2022-06-29T06:31:00+01:00 2022-06-29T13:30:00+01:00 MW 160 733 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007259_001 Dismissed Planned Production unavailability 2022-06-13T13:54:09+01:00 2022-06-29T07:00:00+01:00 2022-06-29T13:30:00+01:00 MW 160 733 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007322_003 Inactive Planned Production unavailability 2022-06-24T15:47:32+01:00 2022-06-24T14:15:00+01:00 2022-06-24T14:45:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007322_002 Dismissed Planned Production unavailability 2022-06-24T10:24:46+01:00 2022-06-24T14:15:00+01:00 2022-06-24T14:45:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007322_001 Dismissed Planned Production unavailability 2022-06-23T23:25:33+01:00 2022-06-24T14:30:00+01:00 2022-06-24T14:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_005 Inactive Planned Production unavailability 2022-06-24T08:02:31+01:00 2022-06-23T23:00:00+01:00 2022-06-24T06:53:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_004 Dismissed Planned Production unavailability 2022-06-23T23:22:49+01:00 2022-06-23T23:00:00+01:00 2022-06-24T06:53:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_003 Dismissed Planned Production unavailability 2022-06-23T14:54:11+01:00 2022-06-23T23:00:00+01:00 2022-06-24T09:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_002 Dismissed Planned Production unavailability 2022-06-13T13:40:16+01:00 2022-06-23T20:30:00+01:00 2022-06-24T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_001 Dismissed Planned Production unavailability 2022-06-09T09:14:44+01:00 2022-06-23T21:30:00+01:00 2022-06-24T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007321_003 Inactive Planned Production unavailability 2022-06-24T00:02:31+01:00 2022-06-23T18:18:00+01:00 2022-06-23T23:00:00+01:00 MW 93 800 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007321_002 Dismissed Planned Production unavailability 2022-06-23T19:37:20+01:00 2022-06-23T18:18:00+01:00 2022-06-23T23:00:00+01:00 MW 93 800 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007321_001 Dismissed Planned Production unavailability 2022-06-23T18:18:38+01:00 2022-06-23T18:18:00+01:00 2022-06-23T23:00:00+01:00 MW 123 770 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_009 Inactive Planned Production unavailability 2022-06-23T18:17:33+01:00 2022-06-23T14:30:00+01:00 2022-06-23T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_008 Dismissed Planned Production unavailability 2022-06-23T17:01:48+01:00 2022-06-23T14:30:00+01:00 2022-06-23T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_007 Dismissed Planned Production unavailability 2022-06-23T14:24:30+01:00 2022-06-23T14:30:00+01:00 2022-06-23T17:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_006 Dismissed Planned Production unavailability 2022-06-23T09:06:47+01:00 2022-06-23T15:00:00+01:00 2022-06-23T17:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_005 Dismissed Planned Production unavailability 2022-06-23T07:43:31+01:00 2022-06-23T13:30:00+01:00 2022-06-23T16:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_004 Dismissed Planned Production unavailability 2022-06-21T15:12:08+01:00 2022-06-23T14:00:00+01:00 2022-06-23T15:01:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_003 Dismissed Planned Production unavailability 2022-06-21T14:52:02+01:00 2022-06-23T14:00:00+01:00 2022-06-23T15:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_002 Dismissed Planned Production unavailability 2022-06-21T14:51:30+01:00 2022-06-23T14:00:00+01:00 2022-06-23T16:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_001 Dismissed Planned Production unavailability 2022-06-21T09:31:51+01:00 2022-06-23T14:00:00+01:00 2022-06-23T15:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007320_002 Inactive Planned Production unavailability 2022-06-23T15:32:33+01:00 2022-06-23T11:40:00+01:00 2022-06-23T14:30:00+01:00 MW 123 770 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007320_001 Dismissed Planned Production unavailability 2022-06-23T14:24:02+01:00 2022-06-23T11:40:00+01:00 2022-06-23T14:30:00+01:00 MW 123 770 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007319_002 Inactive Planned Production unavailability 2022-06-23T08:02:31+01:00 2022-06-23T03:00:00+01:00 2022-06-23T07:00:00+01:00 MW 322 571 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007319_001 Dismissed Planned Production unavailability 2022-06-22T19:27:10+01:00 2022-06-23T03:00:00+01:00 2022-06-23T07:00:00+01:00 MW 322 571 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007318_002 Inactive Planned Production unavailability 2022-06-23T04:02:31+01:00 2022-06-22T23:00:00+01:00 2022-06-23T03:00:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007318_001 Dismissed Planned Production unavailability 2022-06-22T19:26:00+01:00 2022-06-22T23:00:00+01:00 2022-06-23T03:00:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007316_002 Inactive Planned Production unavailability 2022-06-23T00:02:30+01:00 2022-06-22T19:00:00+01:00 2022-06-22T23:00:00+01:00 MW 131 762 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007316_001 Dismissed Planned Production unavailability 2022-06-21T19:59:55+01:00 2022-06-22T19:00:00+01:00 2022-06-22T23:00:00+01:00 MW 131 762 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007310_005 Inactive Planned Production unavailability 2022-06-22T18:17:31+01:00 2022-06-22T14:30:00+01:00 2022-06-22T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007310_004 Dismissed Planned Production unavailability 2022-06-22T15:22:18+01:00 2022-06-22T14:30:00+01:00 2022-06-22T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A