Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003823_002 Inactive Planned Production unavailability 2018-06-09T00:01:52+01:00 2018-06-06T23:00:00+01:00 2018-06-08T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003823_001 Dismissed Planned Production unavailability 2018-06-04T13:03:28+01:00 2018-06-06T23:00:00+01:00 2018-06-08T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_011 Inactive Planned Production unavailability 2018-06-08T19:01:52+01:00 2018-06-07T20:00:00+01:00 2018-06-08T18:01:00+01:00 MW 80 1100 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_010 Dismissed Planned Production unavailability 2018-06-08T18:00:19+01:00 2018-06-07T20:00:00+01:00 2018-06-08T18:01:00+01:00 MW 80 1100 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_009 Dismissed Planned Production unavailability 2018-06-08T17:21:56+01:00 2018-06-07T20:00:00+01:00 2018-06-08T18:30:00+01:00 MW 80 1100 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_008 Dismissed Planned Production unavailability 2018-06-08T16:24:02+01:00 2018-06-07T20:00:00+01:00 2018-06-08T17:45:00+01:00 MW 180 1000 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_007 Dismissed Planned Production unavailability 2018-06-08T15:42:48+01:00 2018-06-07T20:00:00+01:00 2018-06-08T16:45:00+01:00 MW 180 1000 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_006 Dismissed Planned Production unavailability 2018-06-08T15:37:34+01:00 2018-06-07T20:00:00+01:00 2018-06-08T15:45:00+01:00 MW 280 900 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_005 Dismissed Planned Production unavailability 2018-06-08T15:23:37+01:00 2018-06-07T20:00:00+01:00 2018-06-08T15:40:00+01:00 MW 280 900 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_004 Dismissed Planned Production unavailability 2018-06-08T12:52:02+01:00 2018-06-07T20:00:00+01:00 2018-06-08T15:30:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_003 Dismissed Planned Production unavailability 2018-06-07T18:48:34+01:00 2018-06-07T20:00:00+01:00 2018-06-08T22:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_002 Dismissed Planned Production unavailability 2018-06-07T18:29:11+01:00 2018-06-07T19:00:00+01:00 2018-06-08T22:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003828_001 Dismissed Planned Production unavailability 2018-06-07T16:58:40+01:00 2018-06-07T22:00:00+01:00 2018-06-08T22:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_008 Inactive Planned Production unavailability 2018-06-07T21:01:52+01:00 2018-06-07T16:30:00+01:00 2018-06-07T20:00:00+01:00 MW 805 375 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_007 Dismissed Planned Production unavailability 2018-06-07T18:48:12+01:00 2018-06-07T16:30:00+01:00 2018-06-07T20:00:00+01:00 MW 805 375 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_006 Dismissed Planned Production unavailability 2018-06-07T18:28:28+01:00 2018-06-07T16:30:00+01:00 2018-06-07T19:00:00+01:00 MW 805 375 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_005 Dismissed Planned Production unavailability 2018-06-07T16:56:53+01:00 2018-06-07T16:30:00+01:00 2018-06-07T22:00:00+01:00 MW 805 375 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_004 Dismissed Planned Production unavailability 2018-06-07T16:15:40+01:00 2018-06-07T16:30:00+01:00 2018-06-08T20:00:00+01:00 MW 805 375 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_003 Dismissed Planned Production unavailability 2018-06-07T12:53:31+01:00 2018-06-07T14:00:00+01:00 2018-06-07T17:00:00+01:00 MW 600 580 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_002 Dismissed Planned Production unavailability 2018-06-07T10:40:19+01:00 2018-06-07T14:00:00+01:00 2018-06-07T17:00:00+01:00 MW 200 980 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003824_001 Dismissed Planned Production unavailability 2018-06-07T08:31:11+01:00 2018-06-07T11:30:00+01:00 2018-06-07T14:30:00+01:00 MW 200 980 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003827_002 Dismissed Planned Production unavailability 2018-06-07T16:17:01+01:00 2018-06-07T17:00:00+01:00 2018-06-07T23:59:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003827_001 Dismissed Planned Production unavailability 2018-06-07T13:00:25+01:00 2018-06-07T17:00:00+01:00 2018-06-07T23:59:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003825_002 Dismissed Planned Production unavailability 2018-06-07T16:16:35+01:00 2018-06-07T20:00:00+01:00 2018-06-08T08:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003825_001 Dismissed Planned Production unavailability 2018-06-07T08:41:50+01:00 2018-06-07T20:00:00+01:00 2018-06-08T08:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000001464_012 Inactive Planned Production unavailability 2018-05-21T19:01:52+01:00 2018-04-29T07:00:00+01:00 2018-05-21T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Commissioning
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000001464_011 Dismissed Planned Production unavailability 2018-05-21T17:40:54+01:00 2018-04-29T07:00:00+01:00 2018-05-21T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Commissioning
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000001464_010 Dismissed Planned Production unavailability 2018-05-21T17:13:47+01:00 2018-04-29T07:00:00+01:00 2018-05-21T17:45:00+01:00 MW 150 0 150 Foreseen Maintenance
Commissioning
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000001464_009 Dismissed Planned Production unavailability 2018-05-21T12:03:47+01:00 2018-04-29T07:00:00+01:00 2018-05-21T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Commissioning
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003812_005 Inactive Planned Production unavailability 2018-05-09T17:01:56+01:00 2018-05-09T14:50:00+01:00 2018-05-09T16:00:00+01:00 MW 300 410 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003812_004 Dismissed Planned Production unavailability 2018-05-09T15:10:21+01:00 2018-05-09T14:50:00+01:00 2018-05-09T16:00:00+01:00 MW 300 410 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003812_003 Dismissed Planned Production unavailability 2018-05-09T14:57:38+01:00 2018-05-09T14:50:00+01:00 2018-05-10T13:00:00+01:00 MW 300 410 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003812_002 Dismissed Planned Production unavailability 2018-05-09T10:43:24+01:00 2018-05-10T06:00:00+01:00 2018-05-10T13:00:00+01:00 MW 360 350 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003812_001 Dismissed Planned Production unavailability 2018-05-08T15:24:47+01:00 2018-05-10T06:00:00+01:00 2018-05-10T13:00:00+01:00 MW 500 210 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003811_002 Inactive Planned Production unavailability 2018-05-09T14:01:52+01:00 2018-05-09T06:00:00+01:00 2018-05-09T13:00:00+01:00 MW 500 210 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003811_001 Dismissed Planned Production unavailability 2018-05-08T15:23:12+01:00 2018-05-09T06:00:00+01:00 2018-05-09T13:00:00+01:00 MW 500 210 710 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003792_003 Inactive Planned Production unavailability 2018-05-03T14:46:52+01:00 2018-05-03T13:00:00+01:00 2018-05-03T13:40:00+01:00 MW 270 910 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003792_002 Dismissed Planned Production unavailability 2018-05-02T10:48:05+01:00 2018-05-03T13:00:00+01:00 2018-05-03T13:40:00+01:00 MW 270 910 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003792_001 Dismissed Planned Production unavailability 2018-04-27T14:19:07+01:00 2018-05-03T16:30:00+01:00 2018-05-03T17:00:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003791_003 Inactive Planned Production unavailability 2018-05-03T14:01:52+01:00 2018-05-03T11:40:00+01:00 2018-05-03T13:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003791_002 Dismissed Planned Production unavailability 2018-05-02T10:47:10+01:00 2018-05-03T11:40:00+01:00 2018-05-03T13:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003791_001 Dismissed Planned Production unavailability 2018-04-27T14:17:46+01:00 2018-05-03T12:00:00+01:00 2018-05-03T13:30:00+01:00 MW 150 1030 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003794_003 Dismissed Planned Production unavailability 2018-05-03T13:35:08+01:00 2018-05-03T13:40:00+01:00 2018-05-03T15:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003794_002 Dismissed Planned Production unavailability 2018-05-02T10:59:50+01:00 2018-05-03T13:40:00+01:00 2018-05-03T15:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003794_001 Dismissed Planned Production unavailability 2018-04-27T14:22:16+01:00 2018-05-03T18:30:00+01:00 2018-05-03T19:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003793_003 Dismissed Planned Production unavailability 2018-05-03T13:34:36+01:00 2018-05-03T15:00:00+01:00 2018-05-03T15:40:00+01:00 MW 270 910 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003793_002 Dismissed Planned Production unavailability 2018-05-02T11:00:42+01:00 2018-05-03T15:00:00+01:00 2018-05-03T15:40:00+01:00 MW 270 910 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003793_001 Dismissed Planned Production unavailability 2018-04-27T14:20:32+01:00 2018-05-03T17:00:00+01:00 2018-05-03T18:00:00+01:00 MW 190 990 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003803_002 Dismissed Planned Production unavailability 2018-05-03T13:34:02+01:00 2018-05-03T15:40:00+01:00 2018-05-03T16:30:00+01:00 MW 240 940 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003803_001 Dismissed Planned Production unavailability 2018-05-02T11:05:20+01:00 2018-05-03T15:40:00+01:00 2018-05-03T16:30:00+01:00 MW 240 940 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A