Last update at: 2024-05-02T14:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 10 11 12 13 14 > | ||||||||||||||||||
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:36:25+00:00 | 2023-03-25T23:59:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:42:21+00:00 | 2023-03-21T10:01:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_007 | Inactive | Planned | Production unavailability | 2023-03-26T02:02:31+01:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_006 | Dismissed | Planned | Production unavailability | 2023-03-17T20:33:45+00:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_005 | Dismissed | Planned | Production unavailability | 2023-03-14T16:21:02+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-29T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_004 | Dismissed | Planned | Production unavailability | 2023-02-24T18:39:23+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_003 | Dismissed | Planned | Production unavailability | 2023-01-23T14:21:55+00:00 | 2023-01-01T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_002 | Dismissed | Planned | Production unavailability | 2023-01-12T11:44:47+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_001 | Dismissed | Planned | Production unavailability | 2022-12-21T13:27:53+00:00 | 2023-02-18T06:00:00+00:00 | 2023-03-25T05:59:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_006 | Inactive | Planned | Production unavailability | 2023-03-21T11:02:32+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_005 | Dismissed | Planned | Production unavailability | 2023-03-17T20:40:25+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_004 | Dismissed | Planned | Production unavailability | 2023-03-15T15:06:54+00:00 | 2023-03-16T14:51:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_003 | Dismissed | Planned | Production unavailability | 2023-03-14T14:38:55+00:00 | 2023-03-16T13:01:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007989_002 | Dismissed | Planned | Production unavailability | 2023-02-25T07:32:19+00:00 | 2023-03-19T13:01:00+00:00 | 2023-05-25T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_006 | Inactive | Planned | Production unavailability | 2023-03-21T10:02:32+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T09:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_005 | Dismissed | Planned | Production unavailability | 2023-03-20T15:20:49+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T09:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_004 | Dismissed | Planned | Production unavailability | 2023-03-17T20:47:37+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-21T10:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_003 | Dismissed | Planned | Production unavailability | 2023-03-15T15:01:34+00:00 | 2023-03-16T14:51:00+00:00 | 2023-04-19T05:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_002 | Dismissed | Planned | Production unavailability | 2023-03-14T14:32:45+00:00 | 2023-03-16T13:01:00+00:00 | 2023-04-19T05:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007995_001 | Dismissed | Planned | Production unavailability | 2023-02-24T19:33:10+00:00 | 2023-03-19T13:01:00+00:00 | 2023-04-19T05:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008018_004 | Inactive | Planned | Production unavailability | 2023-03-19T07:02:32+00:00 | 2023-03-16T12:01:00+00:00 | 2023-03-19T05:59:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008018_003 | Dismissed | Planned | Production unavailability | 2023-03-17T18:14:46+00:00 | 2023-03-16T12:01:00+00:00 | 2023-03-19T05:59:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008018_002 | Dismissed | Planned | Production unavailability | 2023-03-15T15:08:40+00:00 | 2023-03-16T14:51:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008018_001 | Dismissed | Planned | Production unavailability | 2023-03-14T16:17:40+00:00 | 2023-03-16T13:01:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007990_003 | Dismissed | Planned | Production unavailability | 2023-03-17T18:18:10+00:00 | 2023-04-05T06:00:00+01:00 | 2023-05-13T05:59:00+01:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007990_002 | Dismissed | Planned | Production unavailability | 2023-02-25T07:33:33+00:00 | 2023-04-05T06:00:00+01:00 | 2023-05-13T05:59:00+01:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007991_003 | Dismissed | Planned | Production unavailability | 2023-03-17T18:17:43+00:00 | 2023-05-13T06:00:00+01:00 | 2023-06-10T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007991_002 | Dismissed | Planned | Production unavailability | 2023-02-25T07:33:45+00:00 | 2023-05-13T06:00:00+01:00 | 2023-06-10T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_013 | Inactive | Planned | Production unavailability | 2023-03-16T16:02:32+00:00 | 2023-03-06T17:30:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_012 | Dismissed | Planned | Production unavailability | 2023-03-15T15:09:18+00:00 | 2023-03-06T17:30:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_011 | Dismissed | Planned | Production unavailability | 2023-03-14T14:40:23+00:00 | 2023-03-06T17:30:00+00:00 | 2023-03-16T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_010 | Dismissed | Planned | Production unavailability | 2023-03-06T16:56:32+00:00 | 2023-03-06T17:30:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_009 | Dismissed | Planned | Production unavailability | 2023-03-06T15:52:06+00:00 | 2023-03-06T18:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_009 | Inactive | Planned | Production unavailability | 2023-03-16T16:02:32+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 58 | 300 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_008 | Dismissed | Planned | Production unavailability | 2023-03-15T15:02:12+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 58 | 300 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_008 | Dismissed | Planned | Production unavailability | 2023-03-06T14:43:36+00:00 | 2023-03-06T16:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_007 | Dismissed | Planned | Production unavailability | 2023-03-06T13:17:41+00:00 | 2023-03-06T15:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_007 | Dismissed | Planned | Production unavailability | 2023-03-14T14:32:20+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T13:00:00+00:00 | MW | 58 | 300 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_006 | Dismissed | Planned | Production unavailability | 2023-03-06T09:50:07+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 58 | 300 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007992_006 | Inactive | Planned | Production unavailability | 2023-03-16T16:02:32+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007988_006 | Inactive | Planned | Production unavailability | 2023-03-16T16:02:32+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007994_006 | Inactive | Planned | Production unavailability | 2023-03-16T16:02:32+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_006 | Dismissed | Planned | Production unavailability | 2023-03-06T09:46:21+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007706_005 | Dismissed | Planned | Production unavailability | 2023-02-24T17:38:28+00:00 | 2023-03-06T12:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 70 | 230 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007994_005 | Dismissed | Planned | Production unavailability | 2023-03-15T15:03:32+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007992_005 | Dismissed | Planned | Production unavailability | 2023-03-15T15:05:19+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007988_005 | Dismissed | Planned | Production unavailability | 2023-03-15T15:07:51+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T14:50:00+00:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_005 | Dismissed | Planned | Production unavailability | 2023-02-24T19:27:18+00:00 | 2023-03-06T12:00:00+00:00 | 2023-03-19T13:00:00+00:00 | MW | 58 | 300 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007812_004 | Dismissed | Planned | Production unavailability | 2023-01-12T12:58:17+00:00 | 2023-04-19T06:00:00+01:00 | 2023-06-03T05:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007992_004 | Dismissed | Planned | Production unavailability | 2023-03-14T14:34:23+00:00 | 2023-03-06T10:00:00+00:00 | 2023-03-16T13:00:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |