SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-10T12:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010237_001 Dismissed Planned Production unavailability 2025-05-29T16:19:20+00:00 2025-06-12T09:00:42+00:00 2025-08-19T17:00:03+00:00 MW 101 0 101 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010238_002 Dismissed Planned Production unavailability 2025-05-29T17:50:57+00:00 2025-06-06T10:00:00+00:00 2025-06-06T10:05:00+00:00 MW 1 100 101 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010238_001 Dismissed Planned Production unavailability 2025-05-29T17:34:45+00:00 2025-06-06T10:00:00+00:00 2025-06-06T10:05:00+00:00 MW 1 100 101 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_008 Inactive Planned Production unavailability 2025-05-27T09:29:09+00:00 2025-05-09T12:28:30+00:00 2025-05-28T17:00:33+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_007 Dismissed Planned Production unavailability 2025-05-27T08:53:22+00:00 2025-05-09T12:28:30+00:00 2025-05-28T17:00:33+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_006 Dismissed Planned Production unavailability 2025-05-27T07:30:06+00:00 2025-05-09T12:28:30+00:00 2025-06-04T17:00:33+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_005 Dismissed Planned Production unavailability 2025-05-23T10:56:47+00:00 2025-05-09T12:28:30+00:00 2025-06-03T17:00:33+00:00 MW 0 195 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_004 Dismissed Planned Production unavailability 2025-05-21T08:02:55+00:00 2025-05-09T12:28:30+00:00 2025-05-27T12:28:33+00:00 MW 13 182 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_003 Dismissed Planned Production unavailability 2025-05-21T07:58:17+00:00 2025-05-09T12:28:30+00:00 2025-05-27T12:28:33+00:00 MW 0 195 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_002 Dismissed Planned Production unavailability 2025-05-16T10:47:17+00:00 2025-05-09T12:28:30+00:00 2025-05-27T12:28:33+00:00 MW 26 169 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010129_001 Dismissed Planned Production unavailability 2025-05-09T12:29:15+00:00 2025-05-09T12:28:30+00:00 2025-05-19T12:28:33+00:00 MW 52 143 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_007 Inactive Planned Production unavailability 2025-05-27T09:28:56+00:00 2025-05-09T12:27:01+00:00 2025-05-28T17:00:06+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_006 Dismissed Planned Production unavailability 2025-05-27T08:53:04+00:00 2025-05-09T12:27:01+00:00 2025-05-28T17:00:06+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_005 Dismissed Planned Production unavailability 2025-05-27T07:30:40+00:00 2025-05-09T12:27:01+00:00 2025-06-04T17:00:06+00:00 MW 195 0 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_004 Dismissed Planned Production unavailability 2025-05-23T10:57:32+00:00 2025-05-09T12:27:01+00:00 2025-06-03T17:00:06+00:00 MW 26 169 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_003 Dismissed Planned Production unavailability 2025-05-16T10:47:43+00:00 2025-05-09T12:27:01+00:00 2025-05-27T12:27:06+00:00 MW 52 143 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_002 Dismissed Planned Production unavailability 2025-05-12T08:35:13+00:00 2025-05-09T12:27:01+00:00 2025-05-19T12:27:06+00:00 MW 52 143 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010128_001 Dismissed Planned Production unavailability 2025-05-09T12:27:36+00:00 2025-05-09T12:27:01+00:00 2025-05-19T12:27:06+00:00 MW 65 130 195 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_006 Inactive Planned Production unavailability 2025-05-27T09:28:42+00:00 2025-05-09T12:00:40+00:00 2025-05-28T17:00:24+00:00 MW 312 0 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_005 Dismissed Planned Production unavailability 2025-05-27T08:53:39+00:00 2025-05-09T12:00:40+00:00 2025-05-28T17:00:24+00:00 MW 312 0 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_004 Dismissed Planned Production unavailability 2025-05-27T07:29:35+00:00 2025-05-09T12:00:40+00:00 2025-06-04T17:00:24+00:00 MW 312 0 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_003 Dismissed Planned Production unavailability 2025-05-23T11:01:18+00:00 2025-05-09T12:00:40+00:00 2025-06-03T17:00:24+00:00 MW 156 156 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_002 Dismissed Planned Production unavailability 2025-05-16T10:48:21+00:00 2025-05-09T12:00:40+00:00 2025-05-27T12:25:24+00:00 MW 182 130 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000010127_001 Dismissed Planned Production unavailability 2025-05-09T12:26:18+00:00 2025-05-09T12:00:40+00:00 2025-05-19T12:25:24+00:00 MW 185 127 312 Shutdown
Commissioning
Wind Offshore 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010167_004 Inactive Unplanned Production unavailability 2025-05-21T13:17:31+00:00 2025-05-19T18:05:57+00:00 2025-05-21T12:05:06+00:00 MW 101 0 101 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010167_003 Dismissed Unplanned Production unavailability 2025-05-21T12:04:18+00:00 2025-05-19T18:05:57+00:00 2025-05-21T12:05:06+00:00 MW 101 0 101 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010167_002 Dismissed Unplanned Production unavailability 2025-05-20T16:18:24+00:00 2025-05-19T18:05:57+00:00 2025-05-21T17:00:06+00:00 MW 101 0 101 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010167_001 Dismissed Unplanned Production unavailability 2025-05-19T18:07:19+00:00 2025-05-19T18:05:57+00:00 2025-05-20T17:00:06+00:00 MW 101 0 101 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_028 Inactive Planned Production unavailability 2025-05-13T18:02:32+00:00 2024-11-22T09:00:00+00:00 2025-05-13T17:00:00+00:00 MW 185 117 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_028 Inactive Planned Production unavailability 2025-05-13T18:02:32+00:00 2024-11-22T09:00:00+00:00 2025-05-13T17:00:00+00:00 MW 26 130 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_027 Dismissed Planned Production unavailability 2025-05-02T10:40:55+00:00 2024-11-22T09:00:00+00:00 2025-05-13T17:00:00+00:00 MW 26 130 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_027 Dismissed Planned Production unavailability 2025-05-02T10:40:43+00:00 2024-11-22T09:00:00+00:00 2025-05-13T17:00:00+00:00 MW 185 117 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_026 Dismissed Planned Production unavailability 2025-04-25T11:03:07+00:00 2024-11-22T09:00:00+00:00 2025-05-06T17:00:00+00:00 MW 185 117 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_026 Dismissed Planned Production unavailability 2025-04-25T11:02:45+00:00 2024-11-22T09:00:00+00:00 2025-05-06T17:00:00+00:00 MW 26 130 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_025 Dismissed Planned Production unavailability 2025-04-17T10:45:03+00:00 2024-11-22T09:00:00+00:00 2025-04-28T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_025 Dismissed Planned Production unavailability 2025-04-17T10:45:17+00:00 2024-11-22T09:00:00+00:00 2025-04-28T17:00:00+00:00 MW 185 117 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_024 Dismissed Planned Production unavailability 2025-04-11T10:56:46+00:00 2024-11-22T09:00:00+00:00 2025-04-22T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_024 Dismissed Planned Production unavailability 2025-04-11T10:57:30+00:00 2024-11-22T09:00:00+00:00 2025-04-22T17:00:00+00:00 MW 185 117 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_023 Dismissed Planned Production unavailability 2025-04-04T10:52:57+00:00 2024-11-22T09:00:00+00:00 2025-04-14T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_023 Dismissed Planned Production unavailability 2025-04-04T10:54:45+00:00 2024-11-22T09:00:00+00:00 2025-04-14T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_022 Dismissed Planned Production unavailability 2025-04-04T10:52:45+00:00 2024-11-22T09:00:00+00:00 2025-04-14T17:00:00+00:00 MW 26 130 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_022 Dismissed Planned Production unavailability 2025-03-31T10:44:00+00:00 2024-11-22T09:00:00+00:00 2025-04-04T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_021 Dismissed Planned Production unavailability 2025-03-21T10:43:15+00:00 2024-11-22T09:00:00+00:00 2025-03-31T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_021 Dismissed Planned Production unavailability 2025-03-31T10:43:48+00:00 2024-11-22T09:00:00+00:00 2025-04-04T17:00:00+00:00 MW 26 130 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_020 Dismissed Planned Production unavailability 2025-03-21T10:43:03+00:00 2024-11-22T09:00:00+00:00 2025-03-31T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_020 Dismissed Planned Production unavailability 2025-03-14T11:19:50+00:00 2024-11-22T09:00:00+00:00 2025-03-21T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_019 Dismissed Planned Production unavailability 2025-03-14T11:19:37+00:00 2024-11-22T09:00:00+00:00 2025-03-21T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_019 Dismissed Planned Production unavailability 2025-03-07T10:45:41+00:00 2024-11-22T09:00:00+00:00 2025-03-14T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009653_018 Dismissed Planned Production unavailability 2025-02-28T12:17:34+00:00 2024-11-22T09:00:00+00:00 2025-03-07T17:00:00+00:00 MW 211 91 302 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009654_018 Dismissed Planned Production unavailability 2025-03-07T10:45:29+00:00 2024-11-22T09:00:00+00:00 2025-03-14T17:00:00+00:00 MW 39 117 156 Shutdown
Commissioning
Wind Offshore 10YGB----------A