Last update at: 2024-05-03T13:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009063_001 | Active | Planned | Production unavailability | 2024-05-03T13:28:41+01:00 | 2024-05-03T13:28:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009062_001 | Active | Planned | Production unavailability | 2024-05-03T13:27:43+01:00 | 2024-05-03T13:27:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009061_001 | Active | Planned | Production unavailability | 2024-05-03T13:26:31+01:00 | 2024-05-03T13:25:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009060_001 | Active | Planned | Production unavailability | 2024-05-03T13:25:15+01:00 | 2024-05-03T13:24:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009054_002 | Active | Planned | Production unavailability | 2024-05-01T13:03:03+01:00 | 2024-04-29T10:00:00+01:00 | 2024-05-05T10:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009054_001 | Dismissed | Planned | Production unavailability | 2024-04-29T14:25:36+01:00 | 2024-04-29T10:00:00+01:00 | 2024-05-03T14:26:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_006 | Inactive | Unplanned | Consumption unavailability | 2024-05-01T09:02:32+01:00 | 2024-04-29T18:19:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_005 | Inactive | Planned | Consumption unavailability | 2024-05-01T09:02:32+01:00 | 2024-04-29T21:10:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_005 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T20:06:16+01:00 | 2024-04-29T18:19:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_004 | Dismissed | Planned | Consumption unavailability | 2024-04-30T20:06:33+01:00 | 2024-04-29T21:10:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_004 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T14:14:36+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T21:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_003 | Dismissed | Planned | Consumption unavailability | 2024-04-30T14:14:13+01:00 | 2024-04-29T21:10:00+01:00 | 2024-04-30T21:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_003 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T06:31:22+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T15:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_002 | Dismissed | Unplanned | Consumption unavailability | 2024-04-29T21:07:32+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_002 | Dismissed | Planned | Consumption unavailability | 2024-04-30T06:30:51+01:00 | 2024-04-29T21:10:00+01:00 | 2024-04-30T15:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_001 | Dismissed | Planned | Consumption unavailability | 2024-04-29T21:07:07+01:00 | 2024-04-29T21:10:00+01:00 | 2024-04-30T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_001 | Dismissed | Unplanned | Consumption unavailability | 2024-04-29T18:20:33+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T07:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009043_003 | Inactive | Planned | Production unavailability | 2024-04-29T11:02:32+01:00 | 2024-04-23T09:00:00+01:00 | 2024-04-29T10:00:00+01:00 | MW | 103 | 54 | 157 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009043_002 | Dismissed | Planned | Production unavailability | 2024-04-25T08:28:36+01:00 | 2024-04-23T09:00:00+01:00 | 2024-04-29T10:00:00+01:00 | MW | 103 | 54 | 157 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009043_001 | Dismissed | Planned | Production unavailability | 2024-04-23T10:11:51+01:00 | 2024-04-23T09:00:00+01:00 | 2024-04-26T10:11:00+01:00 | MW | 103 | 54 | 157 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_006 | Inactive | Unplanned | Consumption unavailability | 2024-04-20T09:02:31+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_005 | Dismissed | Unplanned | Consumption unavailability | 2024-04-19T20:49:25+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_004 | Dismissed | Unplanned | Consumption unavailability | 2024-04-19T15:23:21+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-19T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_003 | Dismissed | Unplanned | Consumption unavailability | 2024-04-19T09:19:53+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-19T18:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_002 | Dismissed | Unplanned | Consumption unavailability | 2024-04-19T07:34:28+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-19T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009029_001 | Dismissed | Unplanned | Consumption unavailability | 2024-04-19T03:20:33+01:00 | 2024-04-19T03:19:00+01:00 | 2024-04-19T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_034 | Dismissed | Planned | Production unavailability | 2024-04-19T13:07:03+01:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_033 | Dismissed | Planned | Production unavailability | 2024-04-19T13:04:31+01:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_032 | Dismissed | Planned | Production unavailability | 2024-04-19T13:03:21+01:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 138 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_031 | Dismissed | Planned | Production unavailability | 2024-04-19T13:02:21+01:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 0 | 0 | 0 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_030 | Dismissed | Planned | Production unavailability | 2024-03-22T08:16:23+00:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_029 | Dismissed | Planned | Production unavailability | 2024-03-22T07:35:55+00:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T09:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_028 | Dismissed | Planned | Production unavailability | 2024-03-22T07:33:55+00:00 | 2023-07-18T14:00:00+01:00 | 2025-01-08T09:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_027 | Dismissed | Planned | Production unavailability | 2024-03-19T12:11:06+00:00 | 2023-07-18T14:00:00+01:00 | 2024-10-11T09:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_026 | Dismissed | Planned | Production unavailability | 2024-02-21T13:57:18+00:00 | 2023-07-18T14:00:00+01:00 | 2024-10-07T09:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_025 | Dismissed | Planned | Production unavailability | 2024-01-10T12:56:50+00:00 | 2023-07-18T14:00:00+01:00 | 2024-09-14T09:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_024 | Dismissed | Planned | Production unavailability | 2023-11-07T13:10:23+00:00 | 2023-07-18T14:00:00+01:00 | 2024-08-17T00:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_023 | Dismissed | Planned | Production unavailability | 2023-09-28T14:43:55+01:00 | 2023-07-18T14:00:00+01:00 | 2024-07-24T00:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_022 | Dismissed | Planned | Production unavailability | 2023-09-28T14:30:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-29T19:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_021 | Dismissed | Planned | Production unavailability | 2023-09-27T15:22:28+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-28T19:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_020 | Dismissed | Planned | Production unavailability | 2023-09-26T15:41:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_019 | Dismissed | Planned | Production unavailability | 2023-09-25T17:40:25+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_018 | Dismissed | Planned | Production unavailability | 2023-09-23T12:49:34+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-26T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_017 | Dismissed | Planned | Production unavailability | 2023-09-22T17:39:07+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-23T19:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_016 | Dismissed | Planned | Production unavailability | 2023-09-19T18:29:26+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-23T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_015 | Dismissed | Planned | Production unavailability | 2023-09-18T17:40:03+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-20T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_014 | Dismissed | Planned | Production unavailability | 2023-09-17T18:17:56+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-19T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:25:51+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:42:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_011 | Dismissed | Planned | Production unavailability | 2023-09-05T17:39:29+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-13T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |