Last update at: 2024-05-01T13:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 4 5 6 7 8 > | ||||||||||||||||||
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008870_001 | Dismissed | Planned | Production unavailability | 2024-02-22T13:48:29+00:00 | 2024-03-02T10:00:00+00:00 | 2024-03-04T10:00:00+00:00 | MW | 237 | 65 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008869_002 | Inactive | Planned | Production unavailability | 2024-03-02T11:02:32+00:00 | 2024-02-29T10:00:00+00:00 | 2024-03-02T10:00:00+00:00 | MW | 250 | 52 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008869_001 | Dismissed | Planned | Production unavailability | 2024-02-22T13:46:26+00:00 | 2024-02-29T10:00:00+00:00 | 2024-03-02T10:00:00+00:00 | MW | 250 | 52 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_005 | Inactive | Planned | Consumption unavailability | 2024-02-29T22:02:31+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_004 | Inactive | Planned | Consumption unavailability | 2024-02-29T22:02:31+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_004 | Dismissed | Planned | Consumption unavailability | 2024-02-29T08:00:32+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_003 | Dismissed | Planned | Consumption unavailability | 2024-02-29T05:09:16+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_003 | Dismissed | Planned | Consumption unavailability | 2024-02-29T07:59:58+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_002 | Dismissed | Planned | Consumption unavailability | 2024-02-29T05:08:47+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_002 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:08:05+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_001 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:05:20+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_001 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:06:43+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008868_002 | Inactive | Planned | Production unavailability | 2024-02-29T11:02:32+00:00 | 2024-02-27T10:00:00+00:00 | 2024-02-29T10:00:00+00:00 | MW | 263 | 39 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008868_001 | Dismissed | Planned | Production unavailability | 2024-02-22T12:49:19+00:00 | 2024-02-27T10:00:00+00:00 | 2024-02-29T10:00:00+00:00 | MW | 263 | 39 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_003 | Inactive | Unplanned | Production unavailability | 2024-02-28T21:32:32+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T20:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_002 | Dismissed | Unplanned | Production unavailability | 2024-02-28T20:29:50+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T20:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_001 | Dismissed | Unplanned | Production unavailability | 2024-02-28T18:07:53+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T21:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_003 | Inactive | Planned | Production unavailability | 2024-02-27T11:02:31+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T10:00:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_002 | Dismissed | Planned | Production unavailability | 2024-02-22T12:49:53+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T10:00:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_001 | Dismissed | Planned | Production unavailability | 2024-02-22T12:47:06+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T12:47:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_003 | Inactive | Planned | Production unavailability | 2024-02-27T01:02:32+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_003 | Inactive | Planned | Production unavailability | 2024-02-27T01:02:32+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_002 | Dismissed | Planned | Production unavailability | 2024-02-27T00:00:12+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_002 | Dismissed | Planned | Production unavailability | 2024-02-26T23:59:45+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_001 | Dismissed | Planned | Production unavailability | 2024-02-26T19:40:29+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_001 | Dismissed | Planned | Production unavailability | 2024-02-26T19:41:42+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_003 | Dismissed | Planned | Production unavailability | 2024-02-26T15:27:37+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_002 | Dismissed | Planned | Production unavailability | 2024-02-26T10:19:17+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_001 | Dismissed | Planned | Production unavailability | 2024-02-26T09:38:02+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T10:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_013 | Inactive | Planned | Production unavailability | 2024-02-25T11:02:32+00:00 | 2024-02-17T08:00:00+00:00 | 2024-02-25T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_012 | Dismissed | Planned | Production unavailability | 2024-02-22T12:47:31+00:00 | 2024-02-17T08:00:00+00:00 | 2024-02-25T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_011 | Dismissed | Planned | Production unavailability | 2024-02-21T13:54:08+00:00 | 2024-02-17T08:00:00+00:00 | 2024-02-24T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_010 | Dismissed | Planned | Production unavailability | 2024-02-19T17:58:16+00:00 | 2024-02-17T08:00:00+00:00 | 2024-02-22T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_009 | Dismissed | Planned | Production unavailability | 2024-02-19T17:53:33+00:00 | 2024-02-17T08:00:00+00:00 | 2024-02-20T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_008 | Dismissed | Planned | Production unavailability | 2024-02-17T08:06:51+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-20T10:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_007 | Dismissed | Planned | Production unavailability | 2024-02-16T08:32:03+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-20T10:00:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_006 | Dismissed | Planned | Production unavailability | 2024-02-13T09:40:30+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-16T10:00:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_005 | Dismissed | Planned | Production unavailability | 2024-02-08T10:24:57+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-14T10:00:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_004 | Dismissed | Planned | Production unavailability | 2024-02-05T09:33:53+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-08T10:00:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_003 | Dismissed | Planned | Production unavailability | 2024-01-30T08:36:42+00:00 | 2024-01-22T08:45:00+00:00 | 2024-02-05T10:00:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_002 | Dismissed | Planned | Production unavailability | 2024-01-26T08:22:59+00:00 | 2024-01-22T08:45:00+00:00 | 2024-01-30T09:30:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008782_001 | Dismissed | Planned | Production unavailability | 2024-01-23T07:30:58+00:00 | 2024-01-22T08:45:00+00:00 | 2024-01-26T09:30:00+00:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_006 | Inactive | Planned | Consumption unavailability | 2024-02-22T10:32:31+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-22T09:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_005 | Dismissed | Planned | Consumption unavailability | 2024-02-22T08:29:19+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-22T09:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_004 | Dismissed | Planned | Consumption unavailability | 2024-02-21T19:50:45+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-22T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_003 | Dismissed | Planned | Consumption unavailability | 2024-02-21T14:45:55+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-21T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_002 | Dismissed | Planned | Consumption unavailability | 2024-02-21T11:02:30+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-21T16:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008861_001 | Dismissed | Planned | Consumption unavailability | 2024-02-21T07:34:00+00:00 | 2024-02-21T07:40:00+00:00 | 2024-02-21T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008862_003 | Inactive | Planned | Consumption unavailability | 2024-02-22T10:02:31+00:00 | 2024-02-21T19:48:00+00:00 | 2024-02-22T09:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008862_002 | Dismissed | Planned | Consumption unavailability | 2024-02-22T08:28:44+00:00 | 2024-02-21T19:48:00+00:00 | 2024-02-22T09:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |