Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 2 3 4 5 6 >
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_024 Dismissed Planned Production unavailability 2023-11-07T13:08:07+00:00 2023-07-18T14:00:00+01:00 2024-02-03T08:00:00+00:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_023 Dismissed Planned Production unavailability 2023-09-28T14:43:27+01:00 2023-07-18T14:00:00+01:00 2023-11-29T08:00:00+00:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_022 Dismissed Planned Production unavailability 2023-09-28T14:29:47+01:00 2023-07-18T14:00:00+01:00 2023-09-29T19:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_021 Dismissed Planned Production unavailability 2023-09-27T15:23:33+01:00 2023-07-18T14:00:00+01:00 2023-09-28T19:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_020 Dismissed Planned Production unavailability 2023-09-26T15:31:13+01:00 2023-07-18T14:00:00+01:00 2023-09-27T19:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_019 Dismissed Planned Production unavailability 2023-09-25T17:43:27+01:00 2023-07-18T14:00:00+01:00 2023-09-27T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_018 Dismissed Planned Production unavailability 2023-09-23T12:45:21+01:00 2023-07-18T14:00:00+01:00 2023-09-26T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_018 Inactive Planned Production unavailability 2023-09-23T20:02:32+01:00 2023-07-18T14:00:00+01:00 2023-09-23T19:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_017 Dismissed Planned Production unavailability 2023-09-22T17:40:38+01:00 2023-07-18T14:00:00+01:00 2023-09-23T19:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_016 Dismissed Planned Production unavailability 2023-09-19T18:28:21+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_015 Dismissed Planned Production unavailability 2023-09-18T17:40:55+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_014 Dismissed Planned Production unavailability 2023-09-17T18:17:18+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_013 Dismissed Planned Production unavailability 2023-09-14T21:26:47+01:00 2023-07-18T14:00:00+01:00 2023-09-18T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_012 Dismissed Planned Production unavailability 2023-09-12T08:41:36+01:00 2023-07-18T14:00:00+01:00 2023-09-15T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_011 Dismissed Planned Production unavailability 2023-09-05T17:40:07+01:00 2023-07-18T14:00:00+01:00 2023-09-13T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_010 Dismissed Planned Production unavailability 2023-08-30T16:04:05+01:00 2023-07-18T14:00:00+01:00 2023-09-06T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_009 Dismissed Planned Production unavailability 2023-08-25T10:11:37+01:00 2023-07-18T14:00:00+01:00 2023-08-31T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_008 Dismissed Planned Production unavailability 2023-08-22T11:15:32+01:00 2023-07-18T14:00:00+01:00 2023-08-28T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_007 Dismissed Planned Production unavailability 2023-08-18T09:16:38+01:00 2023-07-18T14:00:00+01:00 2023-08-23T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_006 Dismissed Planned Production unavailability 2023-08-14T14:35:26+01:00 2023-07-18T14:00:00+01:00 2023-08-20T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_005 Dismissed Planned Production unavailability 2023-08-09T17:29:30+01:00 2023-07-18T14:00:00+01:00 2023-08-15T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_004 Dismissed Planned Production unavailability 2023-08-04T15:43:26+01:00 2023-07-18T14:00:00+01:00 2023-08-11T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_003 Dismissed Planned Production unavailability 2023-07-28T15:56:11+01:00 2023-07-18T14:00:00+01:00 2023-08-07T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_002 Dismissed Planned Production unavailability 2023-07-24T10:49:57+01:00 2023-07-18T14:00:00+01:00 2023-08-02T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_001 Dismissed Planned Production unavailability 2023-07-18T13:48:39+01:00 2023-07-18T14:00:00+01:00 2023-07-28T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009030_004 Inactive Unplanned Consumption unavailability 2024-04-19T10:02:31+01:00 2024-04-19T03:21:00+01:00 2024-04-19T09:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009030_003 Dismissed Unplanned Consumption unavailability 2024-04-19T07:34:06+01:00 2024-04-19T03:21:00+01:00 2024-04-19T09:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009030_002 Dismissed Unplanned Consumption unavailability 2024-04-19T06:28:14+01:00 2024-04-19T03:21:00+01:00 2024-04-19T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009030_001 Dismissed Unplanned Consumption unavailability 2024-04-19T03:21:42+01:00 2024-04-19T03:21:00+01:00 2024-04-19T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009024_003 Inactive Planned Consumption unavailability 2024-04-17T17:02:32+01:00 2024-04-17T00:45:00+01:00 2024-04-17T16:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009024_002 Dismissed Planned Consumption unavailability 2024-04-17T00:22:38+01:00 2024-04-17T00:45:00+01:00 2024-04-17T16:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009024_001 Dismissed Planned Consumption unavailability 2024-04-17T00:18:12+01:00 2024-04-17T00:45:00+01:00 2024-04-17T12:00:00+01:00 MW 0 150 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009025_002 Inactive Planned Consumption unavailability 2024-04-17T13:02:32+01:00 2024-04-17T00:45:00+01:00 2024-04-17T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009025_001 Dismissed Planned Consumption unavailability 2024-04-17T00:20:57+01:00 2024-04-17T00:45:00+01:00 2024-04-17T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009018_004 Inactive Planned Consumption unavailability 2024-04-16T15:17:31+01:00 2024-04-15T20:30:00+01:00 2024-04-16T14:15:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009018_003 Dismissed Planned Consumption unavailability 2024-04-16T14:08:08+01:00 2024-04-15T20:30:00+01:00 2024-04-16T14:15:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009018_002 Dismissed Planned Consumption unavailability 2024-04-16T11:34:51+01:00 2024-04-15T20:30:00+01:00 2024-04-16T20:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009018_001 Dismissed Planned Consumption unavailability 2024-04-15T19:44:43+01:00 2024-04-15T20:30:00+01:00 2024-04-16T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009019_002 Inactive Planned Consumption unavailability 2024-04-16T13:02:32+01:00 2024-04-15T20:30:00+01:00 2024-04-16T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009019_001 Dismissed Planned Consumption unavailability 2024-04-15T19:47:27+01:00 2024-04-15T20:30:00+01:00 2024-04-16T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_007 Inactive Unplanned Consumption unavailability 2024-04-15T13:02:31+01:00 2024-04-11T08:07:00+01:00 2024-04-15T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_006 Dismissed Unplanned Consumption unavailability 2024-04-14T08:58:03+01:00 2024-04-11T08:07:00+01:00 2024-04-15T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009007_006 Inactive Planned Consumption unavailability 2024-04-15T13:02:31+01:00 2024-04-11T20:00:00+01:00 2024-04-15T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009007_005 Dismissed Planned Consumption unavailability 2024-04-14T08:58:23+01:00 2024-04-11T20:00:00+01:00 2024-04-15T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_005 Dismissed Unplanned Consumption unavailability 2024-04-13T09:58:58+01:00 2024-04-11T08:07:00+01:00 2024-04-14T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_004 Dismissed Unplanned Consumption unavailability 2024-04-12T19:45:57+01:00 2024-04-11T08:07:00+01:00 2024-04-13T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009007_004 Dismissed Planned Consumption unavailability 2024-04-13T09:57:45+01:00 2024-04-11T20:00:00+01:00 2024-04-14T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009007_003 Dismissed Planned Consumption unavailability 2024-04-12T19:46:24+01:00 2024-04-11T20:00:00+01:00 2024-04-13T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_003 Dismissed Unplanned Consumption unavailability 2024-04-12T07:48:59+01:00 2024-04-11T08:07:00+01:00 2024-04-12T22:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009004_002 Dismissed Unplanned Consumption unavailability 2024-04-11T19:38:22+01:00 2024-04-11T08:07:00+01:00 2024-04-12T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A