Last update at: 2023-09-26T18:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | ||||||||||||||||||
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:56:38+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:54:18+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:50:03+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:48:14+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008413_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:46:16+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:44:02+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:41:24+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:39:29+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:27:02+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008253_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:26:47+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 304 | 0 | 304 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008254_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:26:31+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 303 | 0 | 303 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-4 | 48W00000DBAWO-4D | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008255_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:26:14+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 153 | 0 | 153 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_013 | Dismissed | Planned | Production unavailability | 2023-09-14T21:25:51+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-18T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:45+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:35+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:18+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:30:23+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 180 | 120 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:29:00+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 138 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:27:37+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 100 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:26:09+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:25:39+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:25:07+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_005 | Dismissed | Planned | Production unavailability | 2023-09-14T15:40:24+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-20T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_006 | Dismissed | Planned | Consumption unavailability | 2023-09-14T15:39:44+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-20T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008405_002 | Dismissed | Planned | Production unavailability | 2023-09-14T15:39:00+01:00 | 2023-09-20T09:00:00+01:00 | 2023-09-20T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008406_002 | Dismissed | Planned | Consumption unavailability | 2023-09-14T15:38:15+01:00 | 2023-09-20T09:00:00+01:00 | 2023-09-20T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008406_001 | Dismissed | Planned | Consumption unavailability | 2023-09-14T12:41:57+01:00 | 2023-09-15T09:00:00+01:00 | 2023-09-15T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008405_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:39:57+01:00 | 2023-09-15T09:00:00+01:00 | 2023-09-15T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_005 | Dismissed | Planned | Consumption unavailability | 2023-09-14T12:37:18+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_004 | Dismissed | Planned | Production unavailability | 2023-09-14T12:35:50+01:00 | 2023-08-25T08:00:00+01:00 | 2023-09-15T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008401_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:35:09+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 298 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008400_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:33:28+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 110 | 30 | 140 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008399_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:32:59+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-14T12:00:00+01:00 | MW | 130 | 30 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:21:41+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:20:18+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:13:10+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008379_006 | Inactive | Planned | Production unavailability | 2023-09-13T21:02:31+01:00 | 2023-09-03T04:00:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 92 | 208 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008368_006 | Inactive | Planned | Production unavailability | 2023-09-13T21:02:31+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008385_005 | Inactive | Planned | Production unavailability | 2023-09-13T21:02:31+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 70 | 70 | 140 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008379_005 | Dismissed | Planned | Production unavailability | 2023-09-13T19:04:00+01:00 | 2023-09-03T04:00:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 92 | 208 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008401_001 | Dismissed | Planned | Production unavailability | 2023-09-13T19:02:02+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 298 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008385_004 | Dismissed | Planned | Production unavailability | 2023-09-13T19:00:50+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 70 | 70 | 140 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008400_001 | Dismissed | Planned | Production unavailability | 2023-09-13T18:59:58+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 110 | 30 | 140 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008368_005 | Dismissed | Planned | Production unavailability | 2023-09-13T18:58:28+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-13T20:00:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008399_001 | Dismissed | Planned | Production unavailability | 2023-09-13T18:55:50+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 130 | 30 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:42:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-4 | 48W00000DBAWO-4D | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008255_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:42:20+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 153 | 0 | 153 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008254_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:41:51+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 303 | 0 | 303 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008253_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:41:36+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 304 | 0 | 304 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_012 | Dismissed | Planned | Production unavailability | 2023-09-12T08:41:14+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-15T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |