This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2023-09-26T18:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008254_016 Dismissed Planned Production unavailability 2023-09-19T18:29:01+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 303 0 303 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008252_016 Dismissed Planned Production unavailability 2023-09-19T18:28:46+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 302 0 302 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_016 Dismissed Planned Production unavailability 2023-09-19T18:28:21+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_CLDCW-1 48W00000CLDCW-17
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008284_004 Dismissed Planned Production unavailability 2023-09-19T17:50:02+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:00:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDNW-1 48W00000CLDNW-1Q
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008285_004 Dismissed Planned Production unavailability 2023-09-19T17:49:47+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:00:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDNW-1 48W00000CLDNW-1Q
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008285_003 Dismissed Planned Production unavailability 2023-09-19T17:16:04+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:30:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDCW-1 48W00000CLDCW-17
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008284_003 Dismissed Planned Production unavailability 2023-09-19T17:15:46+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:30:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDCW-1 48W00000CLDCW-17
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008284_002 Dismissed Planned Production unavailability 2023-09-19T16:24:53+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:00:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDNW-1 48W00000CLDNW-1Q
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000008285_002 Dismissed Planned Production unavailability 2023-09-19T16:24:29+01:00 2023-09-19T09:00:00+01:00 2023-09-19T18:00:00+01:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_004 Inactive Planned Production unavailability 2023-09-19T16:17:32+01:00 2023-09-19T09:30:00+01:00 2023-09-19T15:10:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_003 Dismissed Planned Production unavailability 2023-09-19T15:06:31+01:00 2023-09-19T09:30:00+01:00 2023-09-19T15:10:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_002 Dismissed Planned Production unavailability 2023-09-19T12:04:35+01:00 2023-09-19T09:30:00+01:00 2023-09-19T17:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_001 Dismissed Planned Production unavailability 2023-09-19T09:41:59+01:00 2023-09-19T09:30:00+01:00 2023-09-19T17:00:00+01:00 MW 800 380 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008406_003 Dismissed Planned Consumption unavailability 2023-09-18T23:14:46+01:00 2023-09-27T09:00:00+01:00 2023-09-27T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008405_003 Dismissed Planned Production unavailability 2023-09-18T23:13:26+01:00 2023-09-27T09:00:00+01:00 2023-09-27T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_007 Dismissed Planned Consumption unavailability 2023-09-18T23:11:59+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_006 Dismissed Planned Production unavailability 2023-09-18T23:10:45+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008252_015 Dismissed Planned Production unavailability 2023-09-18T17:41:15+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 302 0 302 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_015 Dismissed Planned Production unavailability 2023-09-18T17:40:55+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008254_015 Dismissed Planned Production unavailability 2023-09-18T17:40:36+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 303 0 303 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_015 Dismissed Planned Production unavailability 2023-09-18T17:40:21+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 153 0 153 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_015 Dismissed Planned Production unavailability 2023-09-18T17:40:03+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_014 Dismissed Planned Production unavailability 2023-09-17T18:17:56+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_014 Dismissed Planned Production unavailability 2023-09-17T18:17:42+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 153 0 153 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008254_014 Dismissed Planned Production unavailability 2023-09-17T18:17:29+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 303 0 303 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_014 Dismissed Planned Production unavailability 2023-09-17T18:17:18+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008252_014 Dismissed Planned Production unavailability 2023-09-17T18:17:07+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 302 0 302 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
Greater Gabbard Offshore Winds Limited
48X000000000331Y 0000000000000000000008391_002 Dismissed Planned Production unavailability 2023-09-16T23:37:39+01:00 2023-09-12T06:00:00+01:00 2023-09-21T20:00:00+01:00 MW 165 0 165 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008423_002 Inactive Unplanned Production unavailability 2023-09-15T18:02:32+01:00 2023-09-15T16:20:00+01:00 2023-09-15T16:50:00+01:00 MW 530 225 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008422_002 Inactive Planned Production unavailability 2023-09-15T17:17:32+01:00 2023-09-15T15:50:00+01:00 2023-09-15T16:10:00+01:00 MW 621 134 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008409_003 Dismissed Planned Production unavailability 2023-09-15T16:37:19+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 0 120 120 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008408_003 Dismissed Planned Production unavailability 2023-09-15T16:35:54+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 2 136 138 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008407_003 Dismissed Planned Production unavailability 2023-09-15T16:34:54+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 60 40 100 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008416_003 Dismissed Planned Production unavailability 2023-09-15T16:32:35+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 120 120 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008418_002 Dismissed Planned Production unavailability 2023-09-15T16:32:18+01:00 2023-08-31T07:01:00+01:00 2023-10-02T08:00:00+01:00 MW 0 358 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008414_003 Dismissed Planned Production unavailability 2023-09-15T16:32:03+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 138 138 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008423_001 Dismissed Unplanned Production unavailability 2023-09-15T16:31:00+01:00 2023-09-15T16:20:00+01:00 2023-09-15T16:50:00+01:00 MW 530 225 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008412_003 Dismissed Planned Production unavailability 2023-09-15T16:24:56+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 100 100 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008422_001 Dismissed Planned Production unavailability 2023-09-15T15:59:57+01:00 2023-09-15T15:50:00+01:00 2023-09-15T16:10:00+01:00 MW 621 134 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008413_002 Dismissed Planned Production unavailability 2023-09-15T15:51:30+01:00 2023-10-09T08:01:00+01:00 2023-10-13T18:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008412_002 Dismissed Planned Production unavailability 2023-09-15T15:51:30+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 100 100 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008407_002 Dismissed Planned Production unavailability 2023-09-15T15:51:30+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 60 40 100 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008415_002 Dismissed Planned Production unavailability 2023-09-15T15:50:49+01:00 2023-10-09T08:01:00+01:00 2023-10-13T18:00:00+01:00 MW 138 0 138 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008414_002 Dismissed Planned Production unavailability 2023-09-15T15:50:49+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 138 138 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008408_002 Dismissed Planned Production unavailability 2023-09-15T15:50:49+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 2 136 138 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008417_002 Dismissed Planned Production unavailability 2023-09-15T15:50:23+01:00 2023-10-09T08:01:00+01:00 2023-10-13T18:00:00+01:00 MW 120 0 120 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008416_002 Dismissed Planned Production unavailability 2023-09-15T15:50:23+01:00 2023-09-29T12:01:00+01:00 2023-10-09T08:00:00+01:00 MW 0 120 120 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008409_002 Dismissed Planned Production unavailability 2023-09-15T15:50:23+01:00 2023-09-14T17:31:00+01:00 2023-09-29T12:00:00+01:00 MW 120 0 120 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008419_001 Dismissed Planned Production unavailability 2023-09-15T13:02:36+01:00 2023-10-02T08:01:00+01:00 2023-10-05T18:00:00+01:00 MW 358 0 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008418_001 Dismissed Planned Production unavailability 2023-09-15T12:59:51+01:00 2023-08-31T07:01:00+01:00 2023-10-02T08:00:00+01:00 MW 0 358 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A